5th Ave NE and Banner Way NE
Updated September 18, 2026
What's Happening Now?
Thank you to everyone who shared input on the 5th Ave NE and Banner Way NE project this summer. In response to community input, the project team has refined the design to improve bike connections and support safety and accessibility while reducing parking impacts.
Project Overview
We’re planning improvements near the intersection of 5th Ave NE and Banner Way NE to make the area safer and more comfortable. Right now, it’s a complex, multi-lane four-way stop, which can be hard to navigate for people walking, biking, and driving.
In 2027, we’re proposing a new traffic signal and protected bike lanes at the intersection of 5th Ave NE and Banner Way NE. We’re planning to connect the protected bike lanes on 5th Ave NE to a planned neighborhood greenway on 8th Ave NE via NE 79th St. This will help improve neighborhood bike connections while minimizing parking impacts.
Project Elements Include (updated September 2026):
- Full traffic signal at 5th Ave NE & Banner Way NE
- Upgraded street lighting
- New crosswalks, including two new marked crosswalks across 5th Ave NE at NE 79th St
- Traffic calming elements, if feasible (still under review)
- Curb ramps (ADA)
- Turning restrictions to reduce conflicts and streamline flow
- “No Turn on Red” signs
- Intersection visibility improvements (also called “daylighting”)
- This is when we alert drivers not to park within intersections (including T-intersections) or too close to legal crosswalks per Washington State Law. We do this by adding curb bulbs, pavement markings and/or ‘No Parking’ signs.
- Protected bike lanes (using a vertical barrier)
- Northbound and southbound on 5th Ave NE between Banner Way NE and NE 79th St
- Southbound on Banner Way NE between NE 80th St and NE 77th St
- Buffered Bike Lanes (using a painted crosshatch area and flexible posts)
- 5th Ave NE between NE 76th St and Banner Way NE
- Connection to a planned Neighborhood Greenway along NE 79th St and 8th Ave NE
- New on-street parallel parking along the north side of Banner Way NE
Background
In mid-2026, we shared an initial project concept with neighbors, proposing a new signal and bike facilities along the corridor. After hearing feedback from nearby neighbors regarding on-street parking and bike connectivity, the project team evaluated several design alternatives. The updated design delivers the traffic signal, crossing improvements, and bike connections while preserving more street parking.
What changes were made to the design?
We have refined the design to set the stage for improved bike connections and walking routes. This includes:
- 8th Ave NE Neighborhood Greenway: We are planning a connection to the planned 8th Ave NE greenway via NE 79th St.
- More Marked Crosswalks: We are adding marked crosswalks across 5th Ave NE at NE 79th St to improve connections between the new signal and the planned Neighborhood Greenway.
- Traffic Calming: We are looking at ways to slow traffic on 5th Ave NE. Subscribe to our email list to get updates when we know more!
We have refined the design to minimize impacts on on-street parking while improving bike connections and meeting safety and accessibility needs:
- More Parking Preserved on 5th Ave NE: We shortened the protected bike lanes by one block. This retains most legal on-street parking along 5th Ave NE between NE 79th St and NE 80th St, while still improving neighborhood bike connections and meeting safety and accessibility needs.
- Intersection Visibility (Daylighting): Parking will be removed within intersections and near legal crosswalks where it isn't allowed per Washington State Law. This is part of a citywide effort to improve visibility and safety at intersections.
- Parking Removed for Bike Facilities: Parking will be removed along 5th Ave NE between Banner Way NE and NE 79th St, as well as 1–2 legal spaces on the east side of 5th Ave NE at NE 76th St, to accommodate the upgraded bike lanes. Read more about how we prioritize curb space.
- Potential Parking Removed for Traffic Calming: We are looking at ways to slow traffic on 5th Ave NE near the new crosswalks at NE 79th St. Traffic calming may require the removal of about 2 parking spaces on the east side of 5th Ave NE near NE 79th St. Subscribe to our emails for updates.
- New Parking Added: 17 new parallel parking spaces remain proposed on the north side of Banner Way NE between 5th Ave NE and NE 80th St for an overall increase in neighborhood on-street parking.
Design
We're introducing turning restrictions to make the intersection of 5th Ave NE and Banner Way NE function well for all users. These changes will help reduce confusion and conflicts, improve traffic flow, and make the intersection work better for everyone.
Here’s what’s planned:
- No right turns from southbound 5th Ave NE for large trucks only
- No left turns from southeast-bound Banner Way NE
- "No Right Turn on Red" signs
See below for examples of how you can get around once these changes are made.

Frequently Asked Questions
The project team refined the design proposal between July and September 2026 in response to community input. The changes improve neighborhood connectivity to current and planned bike facilities while retaining more street parking than the previous design.
The new design includes improvements that help connect the protected bike lanes on 5th Ave NE to a planned neighborhood greenway on NE 79th St and 8th Ave NE.
Neighborhood Greenways are safer, calmer neighborhood streets for you, your family, and your neighbors where we make people walking and biking the priority. These streets work together with trails and protected bike lanes to provide connected routes to bring people to the places they want and need to go as part of Seattle’s all-ages and abilities bicycle network.
Neighborhood greenways are defined by three elements:
- Safer Crossings of Busy Streets
- Walking and Biking Priority
- Wayfinding
We chose NE 79th St for the greenway connection rather than NE 78th St because it provides a safer and more comfortable route. The intersection at NE 78th St and 5th Ave NE sits near Banner Way NE, which could lead to conflicts between people biking and people driving. NE 78th St also has a steeper grade than NE 79th St. For these reasons, NE 79th St is the safer and more comfortable choice for people biking and rolling.
The intersection of 5th Ave NE and NE Banner Way is famous in Seattle for being a challenging, busy four-way-stop. During community engagement for the Seattle Transportation Plan, we heard from many residents how this intersection wasn’t working well. Drivers were confused and frustrated, and people walking, rolling, and biking went out of their way to avoid it because it didn’t feel safe. The 2024 Seattle Transportation Levy delivery plan included an upgrade to this intersection due to popular demand.
We are adding these bike lanes now because SDOT's Complete Streets Policy directs us to use project opportunities, like installing a new traffic signal, to deliver safety improvements for people who walk, bike, roll, and take transit. Building these improvements today also helps us prepare our streets for the future.
The proposed bike lane upgrades on 5th Ave NE connect to existing bike lanes on 5th Ave NE, south of NE 76th St and to a planned neighborhood greenway on NE 79th St and 8th Ave NE. This would be a key connection over I-5 between Green Lake and residential areas in northeast Seattle.
The proposed bike lanes on Banner Way NE will connect to the 80th St overpass and tie into existing bike lanes further east on NE 75th St, which is a key east/west route.
The Seattle Transportation Plan (STP), the City's long-range plan for our streets, names 5th Ave NE as a priority biking corridor. The Seattle City Council unanimously adopted this plan in April 2024. The bike lanes on 5th Ave NE remain part of our long-term plans for Seattle. However, there isn’t currently funding allocated to design and build them.
We are evaluating whether speed cushions are possible on 5th Ave NE.
Speed cushions are a traffic-calming tool that slow passenger vehicles while still allowing larger vehicles, like buses and emergency responders, to pass through. We will share more information as the design progresses.
Yes, you can park in your driveway in front of your garage as long as your vehicle does not obstruct the sidewalk. You cannot park in front of or within five feet of your driveway curb cut.
Timeline
2024
- Seattle Transportation Plan adopted (includes protected bike lanes and Neighborhood Greenway)
- Signal project identified in the Seattle Transportation Levy
2026
- May - August: Community engagement
- August - September: Design review and update
- September - December: Community engagement and design finalization
2027
- Pre-construction notifications
- Construction begins (exact timeline not yet known)
Planned
- NE 79th St and 8th Ave NE Neighborhood Greenway design and construction (exact timeline not yet known)
Funding
This project is funded by the voter-approved Seattle Transportation Levy. To learn more, visit seattle.gov/transportation/levy.


