Reports & Studies
Quickly jump to a section:
Moving the Needle | Levy to Move Seattle | Traffic | Streetcar | Evaluations | Traffic Flow Data | Parking | Bridging the Gap | Missing Link | Annual Reports | Other | Studies | Planning Studies
Moving the Needle Performance Reports
Report | Date |
---|---|
2021 Performance Report | 2021 |
2020 Performance Report | 2020 |
2019 Performance Report | 2019 |
2017 Performance Report | 2017 |
Levy to Move Seattle Reports
All Levy to Move Seattle Reports can be found on the Levy Materials Page
Traffic Reports
Streetcar Reports
Report | Date |
---|---|
October 2023 | |
October 2023 | |
Culture Connector Streetcar Ridership and Special Markets Memo |
November 2023 |
January 2024 | |
October 2022 | |
September 2021 | |
2019 Annual Streetcar Operations Report | September 2020 |
2018 Semi Annual Operations Streetcar Report |
July 2019 |
Evaluations (Before and After Reports)
The City of Seattle has transformed 36 different roads since 1972. We can confidently say that not only does redesigning our streets make them safer, but it keeps people and goods moving. The Federal Highway Administration agrees. A 2010 study looked at 30 redesigned street in Washington and California and determined there was a 19 percent reduction in collision rate. Read our before and after reports to learn more.
Traffic Flow Data Reports
Parking Reports
Bridging the Gap — Annual Reports and Accomplishments
Missing Link Reports
Report | Date |
---|---|
Final Environmental Impact Statement (EIS) | May 2017 |
Final EIS Executive Summary | May 2017 |
Reissued Revised DNS | April 2012 |
Revised DNS | February 2011 |
Revised SEPA checklist | February 2011 |
Signed DNS | November 2008 |
SEPA Checklist | November 2008 |
Annual Reports
Report | Date |
---|---|
2013 Action Agenda Progress Report | 2013 |
2012 Action Agenda | 2013 |
2010 Annual Report | 2011 |
2009 Annual Report | 2010 |
2008 Annual Report | 2009 |
2007 Annual Report | 2008 |
2006 Annual Report | 2007 |
2005 Annual Report | 2006 |
2004 Annual Report | 2005 |
2003 Annual Report | 2004 |
Other Reports
Report | Date |
---|---|
West Seattle Bridge One-Year Monitoring Report | September 2023 |
2009 Bicycle Progress Report | July 2010 |
2009 Pedestrian Progress Report | July 2010 |
5th Avenue NE Streetscape Design Plan Final Report | April 2002 |
Additional Review of the Impacts of Deep Bored Tunnel Tolling Diversion on City Streets; Identification of Mitigation | April 2001 |
Asset Status and Condition Report - 2020 | 2020 |
Asset Status and Condition Report - 2015 | December 2015 |
Center City Circulation Report | December 2003 |
FAP ITS projects and other SDOT ITS strategies | 2014 |
Neighborhood Business District Access Intercept Survey | June 2017 |
Rainier Pilot Project Evaluation | February 2017 |
Safe Routes to School 2015-2016 Annual Report | December 2016 |
SDOT WMBE 2015 Annual Report | July 2016 |
Studies
Study | Date |
---|---|
Ballard Bridge Sidewalk Widening Concept Study | September 2014 |
Coal Train Traffic Impact Study | October 2012 |
Comprehensive Neighborhood Parking Study | August 1999 |
2014 Downtown Off-Street Parking Study | September 2014 |
Holgate Street Railroad Crossing Study | January 2010 |
Northgate Pedestrian Bridge Feasibility Study | December 2012 |
Parking Management Study | September 2002 |
South Lander - Hanford Street Grade Separation Study | March 2003 |
SW Admiral Way Safety Project Parking Study | August 2015 |
Terminal 18 Bathroom Feasibility Study | June 2015 |
Variable Tolling Study | May 2009 |
Planning Studies
Our Policy and Planning Division works with other departments and different communities to implement transportation elements of neighborhood plans and identify community transportation priorities. Current planning efforts can be found in our Planning Program page. Past plans include: