2018 District 3 – Projects
District 3 — Project Updates
2018 Your Voice, Your Choice: Parks and Street Elected Projects
- Summit Ave between Madison St and Spring St (Cost: $90,000; Total Votes: 136)
- 14th Ave E and E Aloha St (Cost: $83,298; Total Votes: 297)
- 19th Ave and E Cherry St (Cost: $10,000; Total Votes: 236)
- 16th Ave, 17th Ave, and 18th Ave and E Jefferson St (Cost: $5,000; Total Votes: 176)
- 29th Ave between E Yesler Way and E Alder St (Cost: $16,100; Total Votes: 148)
- I-90 Offramp onto Rainier Ave S (Cost: $56,800; Total Votes: 182)*
- 25th Ave S and S Plum St (Cost: $68,800, SDOT funded)*
- Judkins Park (Cost: $24,700; Total Votes: 291)*
* Projects in Equity & Environment Initiative (EEI) Focus Areas.
STREETS | Summit Ave between Madison St and Spring St
Walkway Improvements
Project Overview
The sidewalk on Summit Ave, between Madison St and Spring St, has been damaged over time, and the sidewalk is uplifted from tree roots. Sidewalk repair increases accessibility, safety, and creates a more comfortable experience for travelers.
If additional funds are available following implementation, we will expand our work to include sidewalks along Spring St, adjacent to Summit Ave.
Project Solutions
- Repair the existing sidewalk
- Prune overgrown tree roots
Neighborhood: First Hill
Total Cost: $90,000
YVYC Funds: $90,000
Project Schedule and Updates
Construction was completed in March 2022.
Back to top.
Back to Your Voice, Your Choice landing page.
STREETS | 14th Ave E and E Aloha St
Crossing Improvements
Project Overview
Many people use the intersection of 14th Ave E and E Aloha St to reach destinations in Capitol Hill such as Volunteer Park, Lowell Elementary School, businesses along 15th Ave E and more.
It has been reported as a challenging crossing for pedestrians. Installing a curb bulb and new streetlight decreases crossing distance, make pedestrians more visible, and calm the flow of traffic.
In response to the pandemic, SDOT developed Stay Healthy Streets, and 14th AVe E is being conisdered as a possible future route. As a result, the YVYC project scope has been revised to install an all-way stop at the interesection and marking the crosswalks for the east and west crossings across E Aloha St.
Project Solutions (2018)
- Mark a crosswalk on the west crossing across E Aloha St
- Install a rectangular rapid flashing beacon
Project Solutions (2021 Revision)
- Mark a crosswalk on the east and west crossings across E Aloha St
- Install an all-way stop control at the intersection
Neighborhood: Capitol Hill
Total Cost: $83,298
YVYC Funds: $83,298
Project Schedule and Updates
Construction was completed in October 2021.
Back to top.
Back to Your Voice, Your Choice landing page.
STREETS | 19th Ave and E Cherry St
Crossing Improvements
Project Overview
The 19th Ave and E Cherry St intersection has poor visibility due to its location on a hill, and it provides an unmarked crossing for people walking and biking to the city.
Installing hatched barrier striping on E Cherry St, parallel to the curb, on the east and west approaches on both the north and south side of E Cherry St, enhances pedestrian visibility and predictability by creating a buffer near the unmarked crossings.
Project Solutions
- Install hatched barrier striping
Neighborhood: Squire Park
Total Cost: $10,000
YVYC Funds: $10,000
Project Schedule and Updates
Construction was completed in June 2019.
Back to top.
Back to Your Voice, Your Choice landing page.
STREETS | 16th Ave, 17th Ave, and 18th Ave and E Jefferson St
Crossing Improvements
Project Overview
Multiple intersections along E Jefferson St connect residents to Seattle University, Swedish Cherry Hill, a growing business district, and residential neighborhoods. Installing crossing upgrades at these intersections enhances accessibility, safety, and predictability for all travelers, and supports plans for a future Neighborhood Greenway (NGW), and Swedish Hospitals future expansion project.
Project Solutions
- Install double facing “Pedestrian Crossing” warning signs
Neighborhood: Squire Park
Total Cost: $5,000
YVYC Funds: $5,000
Project Schedule and Updates
Construction was completed in January 2019.
Back to top.
Back to Your Voice, Your Choice landing page.
STREETS | 29th Ave between E Yesler Way and E Alder St
Traffic Calming Upgrades
Project Overview
29th Ave is a residential street located near Leschi Elementary School, Peppi’s Park, and Barnett Park. We’ve heard from neighbors that the stretch between E Yesler Way and E Alder St is often used as a cut-through route during peak traffic. Installing speed humps calms drivers and improves safety for all travelers.
Project Solutions
- Install speed humps along 29th Ave, locations to be determined
Neighborhood: Leschi
Total Cost: $16,100
YVYC Funds: $16,100
Project Schedule and Updates
Construction was completed in August 2019.
Back to top.
Back to Your Voice, Your Choice landing page.
STREETS | I-90 Offramp onto Rainier Ave S
Upgraded Walkway
Project Overview
An existing gravel path cutting from Valentine Pl S to the corner of the eastbound I-90 Offramp onto Rainier Ave S is used heavily by people traveling to the city and accessing nearby transit stops. The path is on Washington State Department of Transportation (WSDOT) property, and is Parks & Recreation’s responsibility to maintain. Pending agreements with WSDOT and Parks & Recreation, we’ll pave the existing path to improve accessibility and connectivity for pedestrians.
Project Solutions
- Pave the existing path at the north end of Valentine Pl S – pending WSDOT and Parks agreements
Neighborhood: Atlantic
Total Cost: $56,800
YVYC Funds: $56,800
Project Schedule and Updates
Construction was completed in September 2021.
Back to top.
Back to Your Voice, Your Choice landing page.
STREETS | 25th Ave S and S Plum St
Crossing Improvements
Project Overview
Many people use the intersection of 25th Ave S and S Plum St to reach destinations in North Rainier including the Lighthouse for the Blind, the Amy Yee Tennis Center, transit stops, and more.
We’ve added this project to our 2019 YVYC work plan in addition to the projects that residents selected through the voting process.
Project Solutions
- Install a new curb and sidewalk on the northeast corner
- Install ADA compliant curb ramps
Neighborhood: North Rainier
Total Cost: $68,800
YVYC Funds: $68,800
Project Schedule and Updates
Construction was completed in September 2019.
Back to top.
Back to Your Voice, Your Choice landing page.
PARKS | Judkins Park
Trail Improvements
Project Overview
Judkins is a multipurpose park corridor in the Central Area. Its six-block strip of green enlivens the Rainier Valley with picnic, play and sports areas with wide grass fields, a skatepark, spray park, and picnic tables. Some areas of the skatepark have fallen into disrepair and some trees would shade an area popular for watching the skateboard fun.
Upgrading the skatepark area system improves the experience for skaters and observers alike.
Project Solutions
- Repair and replace pavers that line the grass in the middle and others around the outside of the skate area
- Add trees to southwest corner
Neighborhood: Judkins Park
Total Cost: $24,700
YVYC Funds: $24,700
Project Schedule and Updates
Construction was completed in 2020.
Please check Seattle Parks and Recreation for the latest updates.
Back to top.
Back to Your Voice, Your Choice landing page.
Materials
- District 3 Postcard Mailers (March 2019)