Mickey Merriam Field 8 At Magnuson Synthetic Turf Replacement

Updated: July 2, 2024

Summer 2024

This project will replace the aging synthetic turf at the infield, approximately 25,600 square feet, which is nearing the end of its useful life. This will include the removal of the old ‘worn out’ synthetic turf and regrading the area where soil settlement has occurred over time. Additionally, the accessible route from parking lot E5 to the playfield will be updated to meet current accessibility standards.

The field will be closed during construction. Seattle Parks and Recreation (SPR) and the contractor hired for the project will work to minimize impacts to the roadways and neighborhood.  

SPR continues to lead the way in developing and installing alternate synthetic turf field design materials to deliver a safe, durable, and playable athletic facility and experience.

Location

Warren G. Magnuson Park7400 Sand Point Way NE, 98115

Budget

The budget for the planning, design, and construction is $1.332 million.

Schedule

Bidding: July 2024 
Construction: September 2024

Parks and Recreation

AP Diaz, Superintendent
Mailing Address: 100 Dexter Ave N, Seattle, WA, 98109
Phone: (206) 684-4075
Fax: (206) 615-1813
pks_info@seattle.gov

Newsletter Updates

Subscribe

Sign up for the latest updates from Parks and Recreation

Healthy People, Thriving Environment, Vibrant Community