T. T. Minor Playground Play Area Renovation

Updated: April 16, 2024

Spring 2024

The project team has finalized the play area design based on the community input from the preferred "Option C" design. Please see the play equipment design renderings.

T.T. Minor Design

To minimize construction disruption to the school, Seattle Conservation Corps has completed the demolition of the play equipment during the spring break. Installation of concrete curb ramps and play equipment footings will occur in May. The play area will be ready to host the Volunteer Service Day on June 23 for the Greater and Greener Conference. 

During the spring break, the SPR district maintenance crew and turf crew completed leveling and reseeding the adjacent turf field. The chain link fence will stay in place for grass establishment. 

Both the play area and the field will reopen to the public in the summer.

T.T. Minor Closure Area

Location

T. T. Minor Playground: 1698 E Union St., Seattle, WA 98122

Budget

The King County Parks Levy provides $46,000
REET Real Estate Excise Tax-provides $454,000

Schedule

Planning: Fall 2023
Design: Fall 2023 - Spring 2024
Construction: Summer 2024

Project Description

This project will replace the play equipment for both younger and older children. Pathway paving will be selectively replaced to ensure an accessible route to and through the play area. Reducing the size of the sandbox area to allow space for other uses may also be considered.

The play area will be closed throughout construction.

Community Participation

Public Meeting - 10/18/23 and 11/11/23 

Parks and Recreation

AP Diaz, Superintendent
Mailing Address: 100 Dexter Ave N, Seattle, WA, 98109
Phone: (206) 684-4075
Fax: (206) 615-1813