Filter Results

2751 to 2775 of 4989
annualreport2017
December 31, 2017, concludes our 91st year of operations. The City of Seattle also sponsors a voluntary deferred compensation plan which ...
0.0022113435 |
a/95756
annualreport2017v2
ended December 31, 2017, concludes our 91st year of operations. The City of Seattle also sponsors a voluntary deferred compensation plan ...
0.0022113435 |
a/95757
isrd_election_2023_revisedisrdguidlines_for9.22.23
of Neighborhoods Director, City Hall, 600 4th Ave, 4th floor, PO Box 94649, Seattle, Washington 98124. Note: A Certificate of Approval is ...
0.0022113435 |
a/147561
university-plan
the University Village redevelopment rmd related changing landuse patterns. An immediate concern is to revise DCLU permit ...
0.0022113435 |
a/78421
minutesjandec2013
189 Parks Rec Attendant Richmond,Scott E 1/30/2013 54 32 287 City Light Auto Mechanic Smith Jr,Franklin H 1/11/2013 62 8 ...
0.0022113435 |
a/95635
bullitt house facility loi with attachments ada
, of Lessee. 1.8 City Use of Premises; Third-Party Users. To the extent City uses, or permits any Third-Party ...
0.0022113435 |
a/173748
isrd guidlines_4.28.23_final draft
Director, City Hall, 600 4th Ave, 4th floor, PO Box 94649, Seattle, Washington 98124. Note: A Certificate of Approval is not a ...
0.0022113435 |
a/142165
isrd guidlines_sepanotice_4.28.23
Director, City Hall, 600 4th Ave, 4th floor, PO Box 94649, Seattle, Washington 98124. Note: A Certificate of Approval is not a ...
0.0022113435 |
a/142080
fortlawton-guidelines
to the issuance of any City building, demolition, street use or other permit for proposed work as described above.A ...
0.0022113435 |
a/72895
seattle tod final report 2013
development regulations. The City also facilitated timely planning, permits, and other decisions, including leading ...
0.0022113435 |
a/87267
seattledesigncommission2022.01.20_firestation31_presentationdraft ...
• Structural and Circulation Plan Updates• Mechanical and Plumbing Elements • Exterior Building Design Updates SD Fire ...
0.0022113435 |
a/84836
2022.01.20seattledesigncommission_firestation31_presentation
- 11/17/2021 • SDCI and SDOT Updates• Structural and Circulation Plan Updates• Mechanical and Plumbing Elements • ...
0.0022113435 |
a/129520
att 1 - sir tracking devices 2022 2025 track changes
are acceptable reasons for access to the equipment and/or data collected? 4.10 What safeguards are in place, for protecting data from ...
0.0022113435 |
a/167918
udistrictdirectorsreport
Planning Commission: “Transit Communities” reportActive development permits (September, 2016)Rapid redevelopment is ...
0.0022113435 |
a/87829
spog_cba_2015-2020
resolution mechanism for the purpose of adjudicating disputes concerning agency fees or payments made by employees with ...
0.0022113435 |
a/68824
27_ifc_2021
and ramps shall be allowed where in compliance with Section 2705.3.2 and the International Building Code. 2701.5 Permits. ...
0.0022113435 |
a/133260
fcab ch 93
. It is recognized that the application of present day fire protection techniques to some existing high-rise buildings is difficult. For ...
0.0022113435 |
a/64187
checkoutreusereport2021
at Starbucks, a ReturnDeposit Scheme was the primary mechanism to incentivizereturn. This pilot also included apartnership ...
0.0022113435 |
a/112780
affordabilityhousingwhitepaper
Recommendations Develop an affordable housing mechanism for multifamily zones as part of the Multifamily Code Update: • ...
0.00221073371 |
a/87990
asce710structuralheight
decks are permitted at the structural height limit. 5. Stair, elevator, mechanical and electrical ...
0.00221073371 |
a/96512
sfdfrompublicsafety
in the Fire Prevention Budget Control Level. Additional permit functions and supervisory level responsibilities will be ...
0.00221073371 |
a/61874
landscape_maintenance_agreement
schedule. Schedule of 36 mowings may be altered per Owner request or as required by climatic conditions. Use hand labor or ...
0.00221073371 |
a/111494
2018smcchapter7
2018smcchapter7 2018 SEATTLE MECHANICAL CODE107CHAPTER 7COMBUSTION AIRUser note: About this chapter: Chapter 7 defers to ...
0.00221073371 |
a/97279
light-moodys-2016
further considers SCL's continued growth in debt to fund its $2.3 billion, 6-year capital improvement plan (CIP).OUTLOOKThe stable outlook ...
0.00221073371 |
a/107370
light-moodys-2016
further considers SCL's continued growth in debt to fund its $2.3 billion, 6-year capital improvement plan (CIP).OUTLOOKThe stable outlook ...
0.00221073371 |
a/58434