Filter Results

2326 to 2350 of 2643
mhc121422fairmountpp
of the Historic Commission. • Hazardous materials testing will be required prior to any work performed, this would be lead based paint and ...
0.002178334 |
a/136553
nfastudio_finaldocument_noessays
be in order. If retaining open space and tree canopy in the center of the block is a priority, the demolition and ...
0.002178334 |
a/108121
mha scoping summary final_110916
that doesn’t require demolition of existing housing stock or historic buildings  Consider alternative(s) that do not ...
0.002178334 |
a/64942
appd_mha_deis_2017
exceeds projections  Study alternatives that include more affordable housing, with lower AMI thresholds  Broaden the range of alternatives ...
0.002178334 |
a/65015
appd_mha_feis_2017
exceeds projections  Study alternatives that include more affordable housing, with lower AMI thresholds  Broaden the range of alternatives ...
0.002178334 |
a/65055
2016_1129 cai hala economic analysis summary memorandum
. In this analysis, demolition costs are not considered. Demolition costs would come out of the residual ...
0.002178334 |
a/64921
cam_5051_fire_safety_and_evacuation_plans
cam_5051_fire_safety_and_evacuation_plans CAM 5051 Client Assistance Memo Seattle Fire Department Seattle Permits City of ...
0.002178334 |
a/64161
q2-2023-quarterlyreport
to permit over-sized vehicle access and signage is added to provide contact information for warehouse vendors. Hygiene is ...
0.002178334 |
a/158748
psb20251217min
on how the project has evolved and how it now aligns with the Secretary of the Interior’s Standards compared to the original proposal of ...
0.002178334 |
a/177381
draft structure for stability apr 22 draft
, photographerSTRUCTURE FOR STABILITY8IntroductionIn Seattle, commercially-zoned blocks with a cultural space on them are twice as likely to ...
0.002178334 |
a/49559
q2-2023-quarterlyreport
to permit over-sized vehicle access and signage is added to provide contact information for warehouse vendors. Hygiene is ...
0.002178334 |
a/146922
mhc032526sr
#317B previous use: Retail: 2.5.4 (c), Dave Ryan Pop Art. • Both spaces: Zone 1, Below Street Level, Food a-e and Retail (a-b) are the ...
0.002178334 |
a/178698
cam5051_evacplans
cam5051_evacplans 5051 Seattle Fire Department - Seattle Permits. Part of a multi-departmental series on City services & ...
0.002178334 |
a/154676
wedgwooddns_analysis
of Northeast Seattle into a 14,470 sq.ft. (.33 acre) public park. The proposal includes demolition of an existing asphalt ...
0.002178334 |
a/93631
2012crimepreventionassessment
than time permitted in the CBO review, 2) a comparison of City program practices with the evidence-based practices, and 3) ...
0.002178334 |
a/167014
annualreportjuly2013june 2014
Music Building; and 3) augmentation of the building demolition list to include the Crawford Music Building. On June 15, ...
0.002178334 |
a/77158
annualreportjuly2014june2015
Music Building; and 3) augmentation of the building demolition list to include the Crawford Music Building. On June 15, ...
0.002178334 |
a/77159
tmpreportjuly2015june2015
Building; and 3) augmentation of the building demolition list to include the Crawford Music Building. On June 15, 2011 the ...
0.002178334 |
a/77244
notes20181107
through several reviews before it was put on hold. The approvals that were obtained earlier were the City Council approval for alley ...
0.002178334 |
a/77637
feisscoping-2013-07-01
runoff (quality, quantity) • Noise (short term impacts from site preparation, demolition and construction activity) • ...
0.002178334 |
a/77393
notes20161115
plan that requires a Master Use Permit (MUP). The Citizen’s Advisory Committee (CAC), on the other hand, is formed to ...
0.002178334 |
a/76864
notes08072017
the college would like to accomplish. Mr. Ernevad noted that one of the top priorities is the demolition of the north ...
0.002178334 |
a/76990
spu sac 112918 minutes final
building that was destroyed, which was occupied by Gascoigne Lumber. Gascoigne Lumber and the University partnered with an environmental ...
0.002178334 |
a/77203
cucac 04122022 draft minutes
of completing schematic design by the end of April, and then moving into sign development and permitting. “Break ground” in ...
0.002178334 |
a/156309
cucac 02282023 draft minutes
for June, and it will take more than seven months. Sydney Thiel: Intake appointments have been scheduled. The demolition ...
0.002178334 |
a/156312