2326 to 2350 of 2696
slis
, or building or demolition permit issuance. In addition, the Executive should review similar programs ...
0.009822597 |
a/62615
uwannualreport2013
as of this reporting period. [ 8 ] TABLE 4 Amended Development Capacity by Campus Area Campus Area % of Total Campus ...
0.009822597 |
a/77872
uwannualreport2015
Capacity in Campus Area Permitted GSF Development % of Total Development Capacity constructed as of this report Central 32% ...
0.009822597 |
a/77874
oca_crime_prevention_review_09-05-2012
description than time permitted in the CBO review, 2) a comparison of City program practices with the evidence-based ...
0.009822597 |
a/127434
dpr_projects
for the City to remove. The City's demolition work and additional restoration work will be done under a separate project ...
0.009822597 |
a/61690
cam_5051_fire_safety_and_evacuation_plans
cam_5051_fire_safety_and_evacuation_plans CAM 5051 Client Assistance Memo Seattle Fire Department Seattle Permits City of ...
0.009822597 |
a/64161
transportation
pertaining to the replacement of State Route 99 along the Seattle waterfront. The program includes the City's involvement in the viaduct ...
0.009822597 |
a/61992
appd_mha_deis_2017
exceeds projections  Study alternatives that include more affordable housing, with lower AMI thresholds  Broaden the range of alternatives ...
0.009822597 |
a/65015
appd_mha_feis_2017
exceeds projections  Study alternatives that include more affordable housing, with lower AMI thresholds  Broaden the range of alternatives ...
0.009822597 |
a/65055
covenant_ume_church_tdr
pursuant to SMC Title 23. Grantor covenants not to commence or expand any non-exempt use of floor area on the Property, or ...
0.009822597 |
a/75212
uwannualreport2016
Area as of 12/31/15 Campus Area % of Total Campus Development Capacity in Campus Area Permitted GSF Development % of Total ...
0.009822597 |
a/77875
lpb031523sorrentohoteltdr
to SMC Title 23. Grantor covenants not to commence or expand any non-exempt use of floor area on the Property, or permit ...
0.009822597 |
a/139694
fascap
) weatherization program, and exterior repairs;SMT elevator controls study;SMT 14 demolition and structural repairs;Roof ...
0.009822597 |
a/62376
gazette45
out certain complaints and was informed by him that the Hon. C.M. Rivers, Judge of the Municipal Court, had held that Section #6 of ...
0.009822597 |
a/50182
finalreport2013
On July 26, 2013, the Seattle School District No. 1 submitted a request for departures from certain Seattle Municipal Code Development ...
0.009822597 |
a/76626
draftresponsetocacdraftmasterplancomments
designated landmarks.As Seattle Central College moves forward with any Master Use Permit (MUP) applications for development ...
0.009822597 |
a/76974
moving.the.needle.2014
MaTeRialSProgreSSthe leading edgeconStruction & demolition ProgramIn part because of Seattle’s efforts, manufacturers are ...
0.009822597 |
a/88432
moving.the.needle.2014
MaTeRialSProgreSSthe leading edgeconStruction & demolition ProgramIn part because of Seattle’s efforts, manufacturers are ...
0.009822597 |
a/57490
moving.the.needle.2014
MaTeRialSProgreSSthe leading edgeconStruction & demolition ProgramIn part because of Seattle’s efforts, manufacturers are ...
0.009822597 |
a/90629
fas
construction work includes, but is not limited to, demolition, complete construction of the interior finishes, including ...
0.009822597 |
a/62903
fascap
construction work includes, but is not limited to, demolition, complete construction of the interior finishes, including ...
0.009822597 |
a/62904
administration
) weatherization program, and exterior repairs;SMT elevator controls study;SMT 14 demolition and structural repairs;Roof ...
0.009822597 |
a/62370
spr_2429adoptedcip
Remediation. • Changes to the Carkeek Bridge project budget reflect the actual project timeline given long timelines for BNSF and shoreline ...
0.009822597 |
a/153296
dadu_submission116
ON CONSTRUCTION OF PERMIT #6588433-CN IN SUMMER -EARLY FALL OF 2019 WHICH RESULTED IN A CONSTRUCTION COST OF ABOUT $135K. ...
0.009822597 |
a/86911
seacap2006plan
accelerates the process, it is not a new source of CO2.The City’s role in this project is limited to permit review and ...
0.009822597 |
a/88486