Filter Results

1226 to 1250 of 2639
2020auditorsreport
, section 4.36.140.D of the Seattle Municipal Code requires the Board of Administration to annually transm ...
0.00157781714 |
a/95769
2021-07-21_cempintroduction.signed
a local organization for an emergency management program and plan is in the Revised Code of Washington Section 38.52.070. ...
0.00157772843 |
a/57065
2021-10-26_cempintroduction.signed2
a local organization for an emergency management program and plan is in the Revised Code of Washington Section 38.52.070. ...
0.00157772843 |
a/57067
recommendations20180525
is produced pursuant to the City of Seattle Municipal Code (SMC 23.44.17 and 23.79) (the ...
0.00157761353 |
a/76720
smc-001-a-002_slireport_march2023final
of the Seattle Municipal Code and Revised Code of Washington in an atmosphere of respect. ...
0.00157757825 |
a/142304
building owner decarb grant 2024 contract template
, Ordinance 126959 (as codified at Chapter 22.925 and amendments to Chapter 22.930 of the Seattle Municipal ...
0.00157757511 |
a/168839
5_references_mha_feis_2017
and Sustainable City. Available online at http://www.seattle.gov/dpd/cs/groups/pan/@pan/documents/web_informational/p2580242.pdf.City of ...
0.00157756894 |
a/65050
appendix_h_madison_land_use_tm
suggest a variety of potential improvements, such as crossing bulbs, tree-lined sidewalks, and improved crosswalks. ...
0.0015775552 |
a/106135
2022-commercialwastestreamcompositionstudy
2022-commercialwastestreamcompositionstudy City of Seattle 2022 Commercial Garbage Stream Composition Study August 14, ...
0.00157740619 |
a/144615
arts
City of Seattle - 2019 Adopted and 2020 Endorsed Budget - 78 -Office of Arts and Culture Revenue Overview 2019 Estimated ...
0.00157740212 |
a/63091
providence-swedish first hill mimp_2023 annual report_final
structures (those that do not currently meet life-safety level) and replace with state-of-the-art facilities designed to current ...
0.00157734111 |
a/160491
annexiv.esf04.2018-final
- FIREFIGHTING RESPONSIBILITIES Last Maintenance - 2018 Revision 5-4 resource. It is located at 105 5 Ave S in the same ...
0.00157733634 |
a/57031
fg
appropriated by Council by ordinance. City of Seattle - 2017 Adopted and 2018 ...
0.00157720468 |
a/62756
seattleindustrialfeisch3.3
Impacts described in the following sections are broad evaluations based upon the details available at the time of analysis; each future ...
0.00157718547 |
a/134525
lpbminutes4-18-18
that the Seattle Landmarks Preservation Board approve the application for the proposed storefront alterations at Shafer ...
0.00157714379 |
a/75025
4-5_utilities_adu_deis_2018
project that would propose to disturb more than 750 square feet of land or to add or replace 750 square feet of building ...
0.001577072 |
a/53177
sepa-checklist-southparkwaterqualityfacilitydeconstruction_021125 ...
] Chapter 197-11), and the City of Seattle SEPA ordinance (Seattle Municipal Code [SMC] ...
0.00157705 |
a/165764
debtsvc
. City of Seattle - 2018 Adopted Budget - 811 -Debt Service Expenditure Overview ...
0.00157700956 |
a/62937
2014-council-work-program
as needed for the City of Seattle Planning Commission; Construction Codes Advisory Board; Design Commissio ...
0.00157697638 |
a/53339
fire marshals letter - 2018 sfc section 510 and new forms
communication systems (see Attachment 1). These provisions achieve the equivalent fire and life safety benefits as the 2015 ...
0.00157697138 |
a/64194
seattle-solid-waste-2012-audited-financial-statement
by ordinance of the Seattle City Council and as provided in Seattle Municipal Code 4.50.0 ...
0.001576951 |
a/107406
sluopenspaceordinance
Upper Queen Anne Commercial Areas 2 3 James Holmes OPCD South Lake Union Open Space ORD D6a Template last revised November 13, ...
0.00157675042 |
a/87698
2020annual
to the City’s electric, water, wastewater and solid waste utilities. Seattle City Attorney’s Office: Civil DivisionLAND USE ...
0.00157650106 |
a/50514
seattledesigncommissionhandbook
find more information on the policies that guide the Commission in their reviews via the links below:• Seattle’s ...
0.00157647673 |
a/85851
update_to_city_6-30-2022
and adjustments may allow larger buildings and simplified building envelopes with lower construction costs ...
0.00157645182 |
a/137866