Filter Results

1176 to 1200 of 4734
position_list
1 1.00 1 1.00 1 1.00 1 1.00 Grounds Equip Mechanic F 5 5.00 5 5.00 5 5.00 5 5.00 Grounds Equip ...
0.00221945741 |
a/61040
position_list
Graphic Arts Supv F 1 1.00 1 1.00 1 1.00 1 1.00 Grounds Equip Mechanic F 5 5.00 5 5.00 5 5.00 5 5.00 Grounds Equip ...
0.00221945741 |
a/61011
decision20170731
, mechanical and elevator penthouses, and façade elements above the maximum. The Committee was convened in a public ...
0.00221945741 |
a/76727
draftmimp-2014-05-22
-ments. The purpose of the master planning entitlement work is to permit institutional growth while mitigating its impact ...
0.00221945741 |
a/77389
appdxd_allotherreports
) and the beginning of on-site activities (March 1, 2015). During this "Planning Phase" the Contractor must submit and receive Approvals for ...
0.00221945741 |
a/100830
2018sfcchapter12
Group I-3 occupancies. Power-operated sliding doors or power-operated locks for swinging doors in Group I-3occupancies shall be operable by ...
0.00221934356 |
a/97704
2012sbcchapter17
with the Washington Associ-ation of Building Officials. A registered civil or structuralengineer or registered architect is ...
0.00221934356 |
a/97348
2012sfgcchapter4
as the basisfor pipe sizing, assuming that all appliances could be operat-ing at full capacity simultaneously. Where a diversity of loadcan ...
0.00221934356 |
a/97180
introduction
and expenditures according to a system of funds and subfunds. In general, funds or subfunds are established to account for specific ...
0.002219259 |
a/61846
introduction
and expenditures according to a system of funds and subfunds. In general, funds or subfunds are established to account for specific ...
0.002219259 |
a/61893
lpbcurrentnom_rec f evangelical chruch and parsonage lmb r
.......................................................... A-30 Figure 57 • City of Seattle Permit # 44332, 1906 ...
0.002219259 |
a/74529
1005_s_king_historic_report
alterations2011 6300168 Wire light switches2011 6293892 Install new glass entry door2011 6300168 Electrical permit ...
0.002219259 |
a/73283
financial-statements-federal-single-audit-2008
regulations permit grantees to solicit services from only one vendor in certain situations. For example, federal ...
0.00221919827 |
a/58369
sdot acyclica - final sir_whitepaper
to the equipment and/or data collected? Acceptable reasons for access to the equipment include device installation or issue ...
0.00221919827 |
a/144834
constpermitcklisttenantimprovecomm
mezzanines, raised floor & other structural work MECHANICAL PLANS (if Mechanical permit ...
0.00221900153 |
a/97920
2021srcintroduction
Council, Inc.’s copyrighted, or licensed material may be reproduced, distributed or transmitted in any form or by any means, including, ...
0.00221900153 |
a/162785
climate_change_response_framework
 Enable More Right-Sized, Zero-Emission Urban Delivery Vehicles  Implement Commercial Vehicle Permitting and Delivery ...
0.00221900153 |
a/147964
restaurant-example-seafood
need to change the equipment and menu. • For solid-fuel cooking, separate venting will be required.• All mechanical ...
0.00221898523 |
a/56605
secmeetingminutes102220
/walk events permitted through Parks Use Permit • Allowance for Outdoor Retail Events for 200 attendees in ...
0.00221898523 |
a/110198
housingpriceimpactsanddesignreview_cai report
studies do not provide a full, balanced perspective when evaluating costs and benefits. • An inability to decouple design review from ...
0.00221898523 |
a/138706
lpbcurrentnom_showbox_johnson_partnership
over 4,000 square feet in area. As any proposed alterations or demolition of the subject building described within this report will require ...
0.00221898523 |
a/74541
lpbcurrentnom_asa_mercer
alterations or demolition of the subject building described within this report will require a permit from DCI, the owner is ...
0.00221898523 |
a/74419
asamercerms_nom_application
alterations or demolition of the subject building described within this report will require a permit from DCI, the owner is ...
0.00221898523 |
a/75133
lidi5economicfinancialfeasibilitymemorandum
relative to project delivery, policy assumptions, governancemodels, and funding and financing mechanism for the lid ...
0.00221879431 |
a/87190
lfs-economic-financial-feasibility-memorandum
considerations relative to project delivery, policy assumptions, governancemodels, and funding and financing mechanism for ...
0.00221879431 |
a/135023