Filter Results

9176 to 9200 of 13826
3_history_planning_context_adu_deis_2018
describes how the historical exclusion of less wealthy, typically non-white populations from single-family zones has ...
0.0021975406 |
a/53167
sdot_birt_report_appendices_110220_e
and information sources, including previous plans and studies, traffic analysis conducted as part of this study, state and ...
0.0021975406 |
a/103980
comprehensiveplanracialequityanalysisengagementsummary
included an opportunity for capacity building, with Sage providing a Comprehensive Plan 101 training as an initial session for 13 community ...
0.0021975406 |
a/87400
bld010225roambarpp
emailchanges or approval to:approval@terrene.bizThe information contained in thisdocument is proprietary to Terrene, ...
0.0021975406 |
a/163846
yeslerterracedesignguidelines
for existing residents. Consideration of Seattle Housing Authority residents should inform decisions throughout design and ...
0.0021975406 |
a/96379
isrd071222_briefing_materials
and special relationships that characterize the property. The new work will be differentiated from the old and will be ...
0.0021975406 |
a/131057
opcdcitylifeatstreetlevel
and opportunities for improvement specific to Seattle. This informs recommendations we offer for enhanced policy, code and ...
0.0021975406 |
a/153650
2023 teb annual report - final 4.16
. The IDT engaged with important stakeholders—including TNC drivers, Uber, Lyft, Port of Seattle and the Drivers Union. Report ...
0.0021975406 |
a/155260
isrd061422_fujimatsu_presentation
warping. Bus stations and stops along 5th Ave. S sit right on the property line and block the sidewalk160’ @ 12.0% GRADE65’ ...
0.0021975406 |
a/129193
seattledesigncommission-2016.01.2112012ndavepresentation(0)
OF CONTENTS |PROJECT INFORMATION |Property Address /DPD Project Number /Owner /Applicant Name /Design ...
0.0021975406 |
a/85791
seattledesigncommission-2016.01.2112012ndavepresentation
OF CONTENTS |PROJECT INFORMATION |Property Address /DPD Project Number /Owner /Applicant Name /Design ...
0.0021975406 |
a/85792
lpb071923georgetownsteamplantbp
program. Gather feedback and support The Georgetown Steam Plant Site Georgetown Steam Plant Existing single-story wood structure Existing ...
0.0021975406 |
a/144559
2013.10.179thandstewartdesigncommissionpresentation
2013.10.179thandstewartdesigncommissionpresentation PROJECT InfORmaTIOn:Property address:DPD Project ...
0.0021975406 |
a/85110
isrd121024_800maynard_pp
OF APPROVAL BRIEFING PACKETPROJECT VISIONTourbineau has experience converting vacant properties to both self-storage and ...
0.0021975406 |
a/163257
apxe_adddesignreq_jan2026draft_redline
, whichever will produce the highest flow rates. If using WWHM, bare soil areas should be modeled as “landscaped area.” Refer to Appendix F ...
0.0021975406 |
a/176471
letter_brycer_bda building owners december 2018 v3
in Seattle. Like fire sprinklers and alarms, these systems are important building components that help save lives, protect ...
0.0021975406 |
a/64223
resources high-rise inspections program info sheet 2017
Emergency Planning Requirements For more information, please email our office at SFD_FMO_HighRise@seattle.gov. Thank you ...
0.0021975406 |
a/64255
afs-26-q1_printable-directory
and properties right in our own back yard! Call or e-mail to request cost information or an application. ...
0.0021975406 |
a/177252
2022april6_sbab_minutes
outreach will inform plan. • Zach Burton: I sent an email earlier, but I’m interested in having more secure bike parking in ...
0.0021975406 |
a/131345
sbp_meeting_summary_2020-04-03
will report back next time when there is more information. 3 Recap and Guidance: Planned Facilities Projects. Andrew ...
0.0021975406 |
a/112280
sbp_q4-2019_sbp_report
) 110 MGD 96.5 11 % of solid waste recycled or composted. Annual (July) ≥70% by 2022 56.5% 12 % of graffiti removed within 10 business day ...
0.0021975406 |
a/112299
march draft apdx e additional stormwater design requirements
WWHM, bare soil areas should be modeled as “landscaped area.” Refer to Appendix F for additional information on stormwater ...
0.0021975406 |
a/178480
hxmfromadministration
hxmfromadministration 2011 Adopted and 2012 Endorsed Budget VII-97 Office of Hearing Examiner Sue Tanner, Hearing Examiner Contact ...
0.00219743326 |
a/61845
sohiprfpaddendumsixfebruary142013
PlanAddendumSix02/14/13The following is additional information regarding Request for Proposal DIT 130002 released on ...
0.00219743326 |
a/70200
appendixb2nlaalaatemplate
by replacing the guidance language below (red Italics) with project-specific information. This form is submitted with the ...
0.00219743326 |
a/112766