Filter Results

826 to 850 of 2775
seattleindustrialfeisch3.11
. The discrepancy between the Assessor’s and DAHP’s records are likely due to demolitions that alter County Tax Assessor’s ...
0.002074106 |
a/134528
06_ifc_2021v2
complying with the applicable provisions of NFPA 70 is permitted during periods of construction, remodeling, repair or ...
0.00207399763 |
a/133270
sepa checklist south recycling and disposal station 010319
) describes the steps and schedule for approving and implementing the proposed SRDS Redevelopment Project, which would redevelop the site ...
0.00207399763 |
a/115433
1998solidwasteplan
station. It includes some mate-rials and items that need special handling, such as old refrigeratorsand tires.Another important category of ...
0.00207399763 |
a/112454
1032_prop_rpt
-of-way or other public spaces, including parks and sidewalks, • Demolition of any building or structure, • Exterior ...
0.00207399763 |
a/73288
062723_1032jacksonhistpropr
in a public right-of-way or other public spaces, including parks and sidewalks, • Demolition of any building or structure, ...
0.00207399763 |
a/143711
1_076159
Environmental Protection Agency (EPA) in March 2017, meeting the requirements of Section S.8 of Seattle Public Utilities’ (SPU’s) National ...
0.00207399763 |
a/113522
summaryurmretrofitlawscalifornia
Permits for demo issued within 210 days of notice Commence demolition within 21 days of obtaining ...
0.00207391544 |
a/96903
matrixsummarycaurmretrofitlaws
Permits for demo issued within 210 days of notice Commence demolition within 21 days of obtaining ...
0.00207391544 |
a/96884
sectionsudistrictdrafteis1-0summary
Comprehensive Plan and Land Use Code (Seattle Municipal Code Title 23) to allow development and design standards that ...
0.00207391544 |
a/87796
psb6-17-15_minutes
throughout the District. Synthetic stucco siding materials are generally not permitted. (7/99) D. Color. Building facades ...
0.00207371172 |
a/73777
urmpolicymeetingsummarysept272012
not discussed this issue but will be aware of it moving forward. Megan Tremain, Group Mackenzie, said her organization supports the ...
0.00207371172 |
a/96955
spu
of combined sewers • 68 pump stations • 92 permitted combined sewer overflow outfalls • 170 storm drain outfalls • 38 ...
0.00207371172 |
a/61528
culture_and_recreation
ProjectsBCL/Program Code:K729822500000000250Discovery Park - Building 653 Demolition and Site ...
0.00207371172 |
a/60891
2006oct5k
2006oct5k City of Seattle, Department of Planning and Development (DPD)Issued Building Permit Stats - Projects Greater Than ...
0.00207363768 |
a/98246
sepa checklist directors rule small wireless facilities final
permitted over 500 SWFs of which over 300 have been installed (see Attachment 1 for project examples). Seattle City Light ...
0.00207363768 |
a/105794
sepa_checklist_directors_rule_small_wireless_facilities_final
permitted over 500 SWFs of which over 300 have been installed (see Attachment 1 for project examples). Seattle City Light ...
0.00207363768 |
a/153385
lpbcurrentnom_spud nom
feet in area. As any proposed alterations or demolition of the subject building described within this report will require a ...
0.00207363768 |
a/74543
nepadce
, rehabilitating, or reconstructing shoulders or auxiliary lanes. 3. Acquisition of land for hardship or protective purposes. (NOTE: ...
0.00207363768 |
a/106201
decisionrecommendation20180629
Construction Impacts - Noise The project is expected to generate a small amount of loud noise during demolition, grading ...
0.00207349984 |
a/76948
seattleindustrialfeischapter4
. 4.2.2 Non-Conforming Uses Comment Theme: Concern about nonconforming uses under the proposed land use concepts. Response: Nonconforming ...
0.00207349984 |
a/134322
urmbenefitscoststudy
shows that if the city were to require retrofits there is a very real risk of losing more URMs to owner demolition than to ...
0.00207349984 |
a/96908
3025500-lu plan set_combined
, FIXTURES, PIPING, HOSE BIBS, ETC ARE INDICATED, REFER TO MEP DRAWINGS AND SPECIFICATIONS FOR SPECIFIC INFORMATION.GENERAL PENETRATION ...
0.00207349984 |
a/154703
2008annualsolidwasterecyclereport
increase C&D reuse and recycling. DPD successfully introduced legislation changing land use code to ease deconstruction of residential ...
0.00207345723 |
a/112554
levy-oversight-committee-minutes-2010
is in design development with Weinstein A/U. The Master Use Permit (MUP) application is underway. The Design Commission ...
0.002073309 |
a/64623