You just searched for:
Search
Filter Results
4451 to 4475 of 4989
lpbcurrentnom_ec_hughes
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
alterations of the subject building described within this report will require a permit from DPD, Seattle Public Schools is ...
0.00220151572 |
a/74456
11232021rpmtgmaterialsbinder
http://seattle.gov/documents/departments/citylightreviewpanel/documents/202 ...
to committed crews and staff, we were able to significantly accelerate our pole replacement schedule and develop a robust strategy to ...
0.00220151572 |
a/51565
sdot acyclica final sir
http://seattle.gov/documents/departments/tech/privacy/sdot acyclica final ...
to the data is permitted to perform traffic analysis, conduct research, create reports, or connecting to the API with ...
0.00220151572 |
a/117359
jensen_set
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
, ICC A117.1-2009BUILDING OCCUPANCY BY USE: B AND R-2CONSTRUCTION TYPE: V-A FIRE SPRINKLER: FULLY SPRINKLERED PER 1997 BUILDING ...
0.00220151572 |
a/75292
psb1207metroareawaypp
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
walls to be cut back only the width of the new shotcrete wall. New power, lighting and mechanical upgrades will also be in ...
0.00220151572 |
a/136430
dadu_submission020
http://seattle.gov/documents/departments/opcd/ongoinginitiatives/encouragin ...
Drawing for additional information. ESTIMATED CONSTRUCTION COST $150,000.00 COMPLETED IN LATE 2019 MECHANICAL SYSTEMS ...
0.00220151572 |
a/86814
seattledesigncommission-2014.11.06dennysubstationpresentation
http://seattle.gov/documents/departments/opcd/designcommission/projectarchi ...
the amount of light that is available to the open space.2. Permitted Setbacks - SMC 23.48.014-A.3a. Waiver for Development ...
0.00220151572 |
a/85769
seattle design commission - 2014.12.18 4755 fauntleroy ...
http://seattle.gov/documents/departments/opcd/designcommission/projectarchi ...
Fauntleroy Feeder Dip & Shoofly Coord. 8/28/2013DOIT Coordination Meeting 9/18/2013SPU Alley Drainage Coordination 10/1/2013SDOT SIP ...
0.00220151572 |
a/85283
metropole_packet_3
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
by two stairs and an elevator connected by enclosed breezeway structure on the roof. Mechanical units and photovoltaic ...
0.00220151572 |
a/74176
lpbcurrentnom_memorialstadiuml
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
Program Department of Neighborhoods (DON) and the Washington Department of Archaeology and Historic Preservation (DAHP) • ...
0.00220151572 |
a/143924
lpb081623memorialstdmnom
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
Department of Neighborhoods (DON) and the Washington Department of Archaeology and Historic Preservation (DAHP) • Permit ...
0.00220151572 |
a/145527
lpbcurrentnom_memorialstadium_rev
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
Program Department of Neighborhoods (DON) and the Washington Department of Archaeology and Historic Preservation (DAHP) • ...
0.00220151572 |
a/147920
lpb100423memorialstdmnom
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
Department of Neighborhoods (DON) and the Washington Department of Archaeology and Historic Preservation (DAHP) • Permit ...
0.00220151572 |
a/147949
seattledesigncommission-2014.12.144755fauntleroypresentation
http://seattle.gov/documents/departments/opcd/designcommission/4755fauntler ...
Feeder Dip & Shoofly Coord. 8/28/2013DOIT Coordination Meeting 9/18/2013SPU Alley Drainage Coordination 10/1/2013SDOT SIP Interim ...
0.00220151572 |
a/84713
rbhs_pres
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
Beach), per Plans. Mechanical included in this permit. #6363692-CN •2014 Alterations to existing health ...
0.00220151572 |
a/75411
1005_s_king_supp_plan
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
Maintain transparency at the ground-floor level. Bay windows, transom areas, and entryways shall not be overly obscured by window ...
0.00220151572 |
a/73285
sdot_birt_report_110220
http://seattle.gov/documents/departments/sdot/projectsandprograms/ballard-i ...
route corridor connections2 City of Seattle Land Use Map. Available at: ...
0.00220151572 |
a/103966
25_ifc_2021
http://seattle.gov/documents/departments/fire/business/archived ...
that prevent the gas from reaching greater than 25 percent of the lower explosive limit (LEL) when released to the atmosphere. 2501.2 ...
0.00220151572 |
a/133261
54_ifc_2021
http://seattle.gov/documents/departments/fire/business/archived ...
shall not apply to R-717 (ammonia) where used as a refrigerant in a refrigeration system (see Section 608). 5401.2 Permits. ...
0.00220151572 |
a/134673
2015-2020actionplan_status
http://seattle.gov/documents/departments/spu/aboutus/plans/sbp/strategic-bu ...
the learning opportunities for all employees about how to stay safe while at work. In 2018 - current, HR has developed a tracking ...
0.00220151572 |
a/112064
residentialframinginspectionquicksheet
http://seattle.gov/documents/departments/sdci/inspections/residentialframin ...
framing. Permits and Approved Plans • Job address should be posted in a visible location. (Seattle Residential Code ...
0.00220151572 |
a/148824
5cinspectionguidelinesforspuwaterstoragefacilities
http://seattle.gov/documents/departments/spu/construction-resources/standar ...
conditions (if any) • Valve chamber and all associated structural, mechanical, and electrical components • Floating ...
0.00220151572 |
a/154273
7312cdwacspurateproposal
http://seattle.gov/documents/departments/spu/aboutus/plans/sbp/strategic-bu ...
Highlights 1.Improved predictability : 4-year rate cycle 2.Risk management: Pass-through mechanism for inflationary ...
0.00220151572 |
a/112075
q4_2022_sbp_report
http://seattle.gov/documents/departments/spu/aboutus/plans/sbp/strategic-bu ...
providers for restaurants. For other projects identified in 2022, we are currently in the process of setting up contracting and procurement ...
0.00220151572 |
a/139635
sfab june 2022 minutes - approved
http://seattle.gov/documents/departments/sdot/boardscommittees/sfab/pre-202 ...
get more rolling once we have the project defined and scoped out. Once we know what we're doing, then that's when we'll go through and pick ...
0.00220151572 |
a/138435