Filter Results

2151 to 2175 of 4765
lpbcurrentnom_pacifictelephonetelegraph
and Development (DPD) permit records; property tax records from the Puget Sound Regional Archives; digital documents from ...
0.00220477465 |
a/74519
2019_0102_wfs_om_report_july_2018
, and free of graffi ti/vandalism. A weekly schedule of interior and glass cleaning should be maintained and monthly service of the ...
0.00220477465 |
a/171985
isrd062822_fujisada_plans
IS TO BE CONSTRUCTEDTO PERMIT WORK NOT CONFORMING TO THESECODES:2018 IBC/SBC, STANDARDS & AMENDMENTS, WAC51-502018 IMC, ...
0.00220477465 |
a/129857
appdxa_biologicalassessment_geologysoilstechmemo
with all permit requirements. The vertical supports would consist of small diameter hollow steel pipe piles (approximately ...
0.00220477465 |
a/100827
2018sfcchapter60
and patio.6001.2 Permits. Permits shall be required as set forth in Section 105.6.SECTION ...
0.00220451574 |
a/97744
desrpttreathouse
), now used as a laundry. The original doorway and doors are intact. Its concrete floor has a covered pit used by ...
0.00220451574 |
a/76281
treat-house-designation
garage), now used as a laundry. The original doorway and doors are intact. Its concrete floor has a covered pit used by ...
0.00220451574 |
a/76566
desrpttownhall
and third floors, and an attic. The basement contains the building’s principal mechanical space. Large gathering areas with ...
0.00220451574 |
a/76280
town-hall-designation
and third floors, and an attic. The basement contains the building’s principal mechanical space. Large gathering areas with ...
0.00220451574 |
a/76565
fourth-church-christ-designation
, first, second and third floors, and an attic. The basement contains the building’s principal mechanical space. Large ...
0.00220451574 |
a/76393
resolution_3213_response_new_levy_programs
mechanism finalized across SDOT, SCL, and OSE Q4 2025 SDOT EV charging permit and curbside EV charging ...
0.00220451574 |
a/164431
2012sfgcchapter2
of thegas.APPLIANCE, FAN-ASSISTED COMBUSTION. Anappliance equipped with an integral mechanical means toeither draw or force ...
0.00220451574 |
a/97178
2012sbcchapter3
that the batteriesare provided with safety venting caps and ventila-tion is provided in accordance with the Interna-tional ...
0.00220451574 |
a/97362
dr6_2023_supersededinfoonly
transfer (shear anchors), out-of-plane wall bracing, and parapet/appendage bracing. In Seattle Existing Building Code (SEBC) Section ...
0.00220451574 |
a/163505
seattle_public_utilities
• 968 miles of combined sewers • 68 pump stations • 90 permitted combined sewer overflow outfalls • 342 storm drain ...
0.00220451574 |
a/61794
introductiontab
are permitted with prior approval by theCity’s Director of Finance.Budget ProcessCity of Seattle 2003 Adopted and 2004 ...
0.00220451574 |
a/60490
utilities
of combined sewers • 68 pump stations • 92 permitted combined sewer overflow outfalls • 342 storm drain outfalls • 130 ...
0.00220451574 |
a/61807
lpb091725universityheightspprev
APPLICABLEDESIGNINFO.05/15/25 PERMIT SETVIEW OF EXISTING COAT AREA FROM THE SOUTHEASTVIEW OF COAT AREA FROM THE ...
0.00220451574 |
a/172908
seattlepedestrianmasterplan
) provides design guidance to property owners, developers, architects, landscape architects, and engineers involved with the design, ...
0.00220451574 |
a/99143
ballardurbandesign-draftexistingconditionsreport
. The schematic design is complete and has been approved by Seattle Parks. Parks anticipates construction documents and ...
0.00220451574 |
a/86293
scl check meter device final sir
installation or removal in connection with the given investigation. 4.10 What safeguards are in place, for protecting data from unauthorized ...
0.00220451574 |
a/117355
scl sensorlink amp fork final sir
unauthorized access (encryption, access control mechanisms, etc.) And to provide an audit trail (viewer logging, ...
0.00220451574 |
a/117357
scl check meter device sir draft - for working group
are in place, for protecting data from unauthorized access (encryption, access control mechanisms, etc.) And to provide an ...
0.00220451574 |
a/117356
scl sensorlink amp fork sir draft - for working group
. 4.10 What safeguards are in place, for protecting data from unauthorized access (encryption, access control mechanisms, ...
0.00220451574 |
a/117358
15thavewnw_fullprojectdesigns_rc0481andtrc0087_100percentsubmitta ...
CONTRACTOR MUST COMPLY WITH ALL NPDES PERMIT REQUIREMENTS. SEESECTIONS 1-07.15 AND 8-01.1.FOR INLET CONNECTION BEND AND ...
0.00220451574 |
a/145007