Filter Results

2026 to 2050 of 3945
communitycenterstrategic plan2016(9-7-16)
neighborhoods and serve as places where people can connect, foster relationships, build community, and enhance their health ...
0.001632439 |
a/92547
ch mimp_2023 annual report_final resubmission
Comment Letter” that was submitted to SDCI in December 2018. B Transportation, Loading and Transit 3 TMP Goal Prior to ...
0.0016323108 |
a/163966
utilities_and_transportation
utilities_and_transportation 2009-2010 Proposed Budget -343- Seattle City Light Jorge Carrasco, Superintendent Contact ...
0.00163228519 |
a/61422
2018sfcindex
2018sfcindex 2018 SEATTLE FIRE CODE703INDEXA24-HOUR BASISDefined ... to . . . . . . . . . . . . . . . . . ...
0.00163228321 |
a/97763
modal integration policy framework
, prioritizing evolving needs and all travel modes• Improve our ability to implement Seattle’s Pedestrian, Bicycle, ...
0.00163220125 |
a/100665
1125harvardavee_may2022-onlinesurveyresultsincludingcomments
into the area. Maybe Historic Seattle couldincorporate the building in some way. I DO NOT want to see an ...
0.00163217518 |
a/133022
seattle industrial deis ch 3.12 2021_12
(2016-2019), Seattle Comprehensive Plan (2015), and Duwamish Valley Action Plan (2018) are also ...
0.00163217518 |
a/87148
sac_onboarding_packet_2021
do this work by centering communities of color in our united effort with the City to help build a just and liberated ...
0.001632125 |
a/49620
lpb6-2-21
. The code provisions require: • Designation of the building(s) as a City of Seattle ...
0.00163201988 |
a/74681
desrptimmacconceptconsidine
. DESCRIPTION Location The Immaculate Conception Convent, for which construction began in 1900 (the Seattle Daily Times ...
0.0016320172 |
a/76103
desrptconsidine
Location The Immaculate Conception Convent, for which construction began in 1900 (the Seattle Daily Times published an ...
0.0016320172 |
a/75958
2018sebcchapter15
2018sebcchapter15 2018 SEATTLE EXISTING BUILDING CODE83CHAPTER 15 CONSTRUCTION ...
0.00163201045 |
a/97157
overview
the Growth Management Act.  Background   The City of Seattle owns and operates a variety of physical assets, ranging from c ...
0.00163190055 |
a/63142
seattle-bps-tag-1-slides-02.03.22
with fossil-fuel. Decarbonize existing buildings by 2035. Seattle Policies for Existing Commercial and ...
0.00163181429 |
a/90377
scc_conceptplan_mimp
grew by 220,000. (source is Seattle Times article of March 26th, 2018). The Washington State Board of ...
0.00163175189 |
a/77039
cherry hill mimp_2023 annual report_final
of applications to the city. For 2023, there were no projects brought forward for design review. In 2018, the SAC commented ...
0.00163169776 |
a/163233
adoptedufcmeetingnotes040721
of properties continues unchecked. Seattle needs strengthened enforcement of tree protection requirements within SMC 23.24, ...
0.00163167343 |
a/119163
oedsmallbusinesswelcome_final
RegulationsSTORMWATER REGULATIONSSeattle Public Utilities (SPU) inspects businesses and works with them to prevent pollutants from entering ...
0.00163165259 |
a/56196
1924proposedcipoverview
under the Growth Management Act. Background The City of Seattle owns and operates a variety of physical assets, ranging ...
0.00163161242 |
a/63072
public_safety
arrested, prosecuted, and/or convicted of misdemeanor criminal code violations in Seattle. The contracts ...
0.00163161138 |
a/61014
opcd
of Seattle - 2018 Proposed Budget - 349 -Office of Planning and Community Development Expenditure ...
0.00163157017 |
a/63047
introduction
Act. Background The City of Seattle owns and operates a variety of physical assets, ranging from community parks, roadways, ...
0.00163154525 |
a/62705
2018seccommercialchapter2
2018seccommercialchapter2 2018 SEATTLE ENERGY CODEC-9CHAPTER 2 [CE]DEFINITIONSSECTION C201 GENERALC201.1 ...
0.00163150788 |
a/97520
workforceequityaudit
to this decentralized framework as a “federated HR system”. See Appendix D for lists of departments/offices supported by SDHR and ...
0.00163138565 |
a/147375
socr-annualreport-2018
socr-annualreport-2018 2018ANNUAL REPORTCentral Building 810 3rd Avenue, Suite 750 Seattle, WA ...
0.00163132581 |
a/51865