You just searched for:
Search
Filter Results
1776 to 1800 of 4989
spu
http://seattle.gov/documents/departments/financedepartment/2025adoptedcip/s ...
of wastewater force mains 85 City‐owned and permitted Combined Sewer Overflow points ...
0.00222226232 |
a/63248
spucip
http://seattle.gov/documents/departments/financedepartment/2328proposedcip/ ...
miles of wastewater force mains • 82 City-owned and permitted Combined Sewer Overflow points • 38 Combined Sewer Overflow ...
0.00222226232 |
a/134226
spdg_cba_expires_12-31-2018_062416
http://seattle.gov/documents/departments/opa/legislation/spdg_cba_expires_1 ...
for a proportional increase in the number of employees permitted to take discretionary time off. 3. The proportional ...
0.00222226232 |
a/83757
spu_2429adoptedcip
http://seattle.gov/documents/departments/financedepartment/2429adoptedcip/s ...
. These systems include approximately: • 448 miles of sanitary sewers • 968 miles of combined sewers • 67 Pump Stations • 5.5 miles of ...
0.00222226232 |
a/153297
spucip
http://seattle.gov/documents/departments/financedepartment/2126proposedcip/ ...
of wastewater force mains 84 City-owned and permitted Combined Sewer Overflow points 38 Combined Sewer Overflow control ...
0.00222226232 |
a/63422
sohiprfpappendixaitefficienciesstudy092812
http://seattle.gov/documents/departments/tech/rfp/sohiprfpappendixaiteffici ...
and development permits and request economic development assistance. Citizens can access an extensive range of information ...
0.00222226232 |
a/70203
pspb071322_411_awning
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
IN LIGHT FIXTURE PLACEMENT DUE TO INTERFERENCE OF MECHANICAL OR STRUCTURAL COMPONENTS MUST BE APPROVED BY THE ARCHITECT.24. ...
0.00222226232 |
a/131092
pspb072022_411_pres
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
IN LIGHT FIXTURE PLACEMENT DUE TO INTERFERENCE OF MECHANICAL OR STRUCTURAL COMPONENTS MUST BE APPROVED BY THE ARCHITECT.24. ...
0.00222226232 |
a/131407
presentation20160914_combined
http://seattle.gov/documents/departments/neighborhoods/majorinstitutions/ma ...
Lot CoverageDEPARTURES REQUESTED:DEPARTURE 2: BUILDING HEIGHTSMC 23.51B.002.D.1.cDeparture Requested for 12’-0” Above the Height Limit for a ...
0.00222226232 |
a/76835
draft_afh
http://seattle.gov/documents/departments/humanservices/cdbg/draft_afh.pdf
Hill, Sea-Tac Airport, and the SoDo industrial area. The arrival of light rail has also led to the permitting and ...
0.00222226232 |
a/69080
hazardous materials analysis report
http://seattle.gov/documents/departments/sdot/freightprogram/e marginal ...
for the Contractor’s review. Project specifications for contaminated media testing, handling and disposal should include provisions for: ...
0.00222226232 |
a/101716
sbmp_21march_final_fulldoc
http://seattle.gov/documents/departments/sdot/bikeprogram/sbmp_21march_fina ...
facilities7 .11 Consider maintenance costs, procedures, and long-term funding mechanisms are a part of all new bicycle ...
0.00222226232 |
a/100200
sbmp_21march_final_full doc
http://seattle.gov/documents/departments/sdot/about/documentlibrary/bicycle ...
bicycle facilities7 .11 Consider maintenance costs, procedures, and long-term funding mechanisms are a part of all new ...
0.00222226232 |
a/99158
2018sfgcchapter2
http://seattle.gov/documents/departments/sdci/codes/fuelgascode/2018sfgccha ...
the design, location and physical characteristics of the elements of the project necessary for obtaining a mechanical ...
0.0022220097 |
a/97210
final full lease tool
http://seattle.gov/documents/departments/economicdevelopment/restaurants/fi ...
, ventilation, air conditioning, mechanical, electrical and plumbing equipment in good working order and condition. 2. Have ...
0.0022220097 |
a/56594
english final full lease tool
http://seattle.gov/documents/departments/economicdevelopment/oisi/english ...
, ventilation, air conditioning, mechanical, electrical and plumbing equipment in good working order and condition. 2. Have ...
0.0022220097 |
a/56486
seattledesigncommission-2009.08.06centerforwoodenboatsminutes
http://seattle.gov/documents/departments/opcd/designcommission/projectarchi ...
Commissioners as appropriate, and Design Commission staff, of 1) the explanation and refinement in the designs of the primary building ...
0.0022220097 |
a/85489
seattledesigncommission-2009.08.06westlaketransportationhubstrate ...
http://seattle.gov/documents/departments/opcd/designcommission/projectarchi ...
by the chair, other Commissioners as appropriate, and Design Commission staff, of 1) the explanation and refinement in the designs of the ...
0.0022220097 |
a/85490
magnusonvmp_complete
http://seattle.gov/documents/departments/parksandrecreation/policiesplannin ...
where possible.Objectives• Restore gravel substrates within the beach zone and immediateunderwater nearshore habitats, subject to WDFW ...
0.0022220097 |
a/92742
2020_2024_pmp_implemplan_v7_appendices
http://seattle.gov/documents/departments/sdot/pedestrianprogram/spab/docume ...
are delivered by private development under the Street Improvement Permit process. The City's Land Use Code requires certain ...
0.0022220097 |
a/103805
611_12th
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
611_12th MEMORANDUM 1 DATE 25 May 2021 PROJECT NAME Seattle Indian Health Board Leschi Fence SDIC PERMIT ...
0.0022220097 |
a/73296
20151015_lhes departures meeting 2 reduced
http://seattle.gov/documents/departments/neighborhoods/majorinstitutions/lo ...
permitted height is the height of the existing school or 35‐feet plus 15‐feet for a pitched roof, whichever is greater. Al ...
0.0022220097 |
a/76814
lpbcurrentnom_viewlands_elementary
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
................................................. A-22 Figure 42 • Original drawing sections and elevations, with color coding for window ...
0.0022220097 |
a/75356
lpbcurrentnom_viewlands_elementary
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
................................................. A-22 Figure 42 • Original drawing sections and elevations, with color coding for window ...
0.0022220097 |
a/74567
22_ifc_2021
http://seattle.gov/documents/departments/fire/business/archived ...
than 1,500 cfm. 2201.2 Permits. Permits shall be required for combustible dust-producing operations as ...
0.0022220097 |
a/133264
Previous
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
Next