Filter Results

1576 to 1600 of 2763
isrd guidlines_4.28.23_final draft
Director, City Hall, 600 4th Ave, 4th floor, PO Box 94649, Seattle, Washington 98124. Note: A Certificate of Approval is not a ...
0.0021878595 |
a/142165
isrd guidlines_sepanotice_4.28.23
Director, City Hall, 600 4th Ave, 4th floor, PO Box 94649, Seattle, Washington 98124. Note: A Certificate of Approval is not a ...
0.0021878595 |
a/142080
20151015_lhes departures meeting 2 reduced
% lot coverage for structure of more than one‐story. Lot coverage restrictions may be waived by the director as a Type I decision when waive ...
0.0021878595 |
a/76814
capitolhilllightrailstationsitessepadetermination
with conditions [ ] DNS involving non-exempt grading, or demolition, or another agency with jurisdiction. BACKGROUND The ...
0.00218726858 |
a/86491
desrptfirestation5
northern area under right way use permit, all located in the SE quarter of Section 31, township 25, Range 4, in King County ...
0.00218726858 |
a/76032
2021 sepa checklist first hill landmk preserv
, what? None directly due to this non-project action. Future development, if permitted, could lead to ...
0.00218726858 |
a/87070
gb-ti-guide00_intro
construction, demolition and land-clearing waste materials have high value for salvage and reuse.BenefitsGreen building ...
0.00218726858 |
a/88381
2018-09-17-paac_meeting_minutes
assess the situation on the ground on a regular basis?  ...
0.00218726858 |
a/104469
harrison-st-901-designation
commercial buildings. Across the street to the west, the block is currently undergoing demolition and construction for a ...
0.00218726858 |
a/76416
lpb6-15-16_minutes
coinciding with an emergency removal permit by SDOT Urban Forestry. The condition was that a proposal to replant the trees ...
0.00218726858 |
a/74678
appendixcap
already signed. It is currently in planning and implementation is expected to start 2013. The Gigabit Squared project alone may generate an ...
0.00218726858 |
a/62337
phasedpermitrequestform
phasedpermitrequestform Phased Permit Request Form Date: A phased permit allows you to submit plans for ...
0.00218726858 |
a/97984
9.appendixofneworexpandedcapitalfacilites
, and pedestrian safety improvements.0CitywideTC367410Sound Transit - East LinkThis project will provide design review, ...
0.00218726858 |
a/62538
fascap_000
) chiller plant replacement. o SMT elevator controller replacements. o SMT 14 demolition and structural repairs. o Roof ...
0.00218726858 |
a/62346
mimpannualstatusreportjuly2018-june2019
space that is currently lacking: To support this objective, SCC engaged in the following activities during the past year: The college ...
0.00218726858 |
a/76985
water
Department of Transportation (WSDOT) and the City of Seattle are co-leads for the project. WDSOT, in conjunction with the Seattle Department ...
0.00218726858 |
a/60573
culture_recreation_000
demolitions and partially funded the purchase and restoration of the Capehart Housing property in Discovery Park. • ...
0.00218726858 |
a/61902
culture_recreation
demolitions and partially funded the purchase and restoration of the Capehart Housing property in Discovery Park. • ...
0.00218726858 |
a/61901
northbeaconsepachecklist
covered by your proposal? If yes, explain: None are known. 2011 North Beacon Hill Legislative Rezone SEPA Environmental Checklist Page 2 ...
0.00218726858 |
a/88059
appendix_n_madison_cumulative_impacts_tm
. Reasonably foreseeable future actions (RFFAs) are actions that are considered likely to occur because they have been funded, approved, or ...
0.00218726858 |
a/106141
culture_and_recreation
several building and road demolitions and partially funded the purchase and restoration of the Capehart Housing property in ...
0.00218726858 |
a/61917
losinghome_9-18-18
provides limited remedies for tenants experiencing substandard conditions. The remedies are limited to: 1) permitting the ...
0.00218726858 |
a/109815
appendixd_airqualityghg_emissionsreport
p.m.) would have the least effect on traffic and would minimize indirect increases in traffic-related emissions. Burning of slash or ...
0.00218726858 |
a/168543
2009annualreport
and hired along with the start of planning the construction management. To save time on the overall project schedule, a separate, early ...
0.00218726858 |
a/99361
march282014hdrreport
American Water Works Association BCE Business Case Evaluation C&D Construction and Demolition CIP Capital Improvement ...
0.00218726858 |
a/111524