Skip to main content
This is an official government website.

Search Results

Search

Filters
Topics [14]
Departments [34]
Documents [2597]

Filters

Topics [14]
Departments [34]
Documents [2597]

Results

1526 to 1550 of 2644
  1. bld_2015_guidelines_june_4015 25.16), no changes may be made (including but not limited to alteration, demolition, construction, reconstruction, ...
  2. 3036201-lu re-notofappparties through: 10/12/2020 The following approvals are required: SEPA Environmental Review Other ...
  3. secmeetingminutes010919 worked with the City for permitted events • In Europe and Russia, May 8th or 9th is celebrated as the end of the Patriotic ...
  4. spu_drainage_wastewater_projects Canal in accordance with state and federal regulations. The project also intends to meet requirements of the City's current CSO National ...
  5. psb1204245thplazasr , and no permit for such activity shall be issued unless a certificate of approval has been issued by the Department of ...
  6. psb1204245thplazasr , and no permit for such activity shall be issued unless a certificate of approval has been issued by the Department of ...
  7. isrd102325__606-12thaves._sr Ave S. – Pearl Warren Building Record #: DONH-COA-01888 Applicant Representatives: Aya Rojnuckarin, Urbal Architecture, and Demarus Tevuk, ...
  8. lpb10-19-16_minutes ’s Standards #9 & #10 MM/SC/DB/JM 8:0:0 Motion carried. 5 101916.23 Columbia City Landmark District 3835 S. Edmunds St. Proposed ...
  9. bld 2015_guidelines_ revision_draft ), no changes may be made (including but not limited to alteration, demolition, construction, reconstruction, restoration, ...
  10. seattledesigncommission-2003.08.07sandpoint-magnusonparkminutes schedules. Many of the projects previously reviewed by the Design Commission are currently under construction or ...
  11. psb041526fountainsr existing sign or erect or place any new sign or change the principal use of any building, or any portion of a building, structure or lot in ...
  12. psb090325prefontainesr any new sign or change the principal use of any building, or any portion of a building, structure or lot in a special review district, and ...
  13. psb041625prefontainfountainbriefsr or change the principal use of any building, or any portion of a building, structure or lot in a special review district, and no ...
  14. spu_water_projects information management systems. SCADA measurement data will be used to assist in capacity planning, validating repairs, identifying ...
  15. 2022-solid-waste-plan-update_acronyms-glossary and demolition CAP Clear Alleys Program CBO community-based organization CBSM community-based social marketing CCB Customer ...
  16. spu_water_projects asset and maintenance information management systems. SCADA measurement data will be used to assist in capacity planning, validating ...
  17. isrd2-8-22 and ground floor retail. The proposal includes demolition of two 1-2 story commercial buildings. Ms. Frestedt introduced ...
  18. spu_drainage_wastewater_projects of the City's current CSO National Pollutant Discharge Elimination System (NPDES) permit. LTD Actuals2010Rev 2011 2012 2013 ...
  19. nisqually_earthquake_aar locations around the City to enablereception of video from helicopter or mobile ground locations.· Remote controlled cameras on top of Key ...
  20. caoannualreport2007 . Municipal Stormwater Permit Appeal The City intervened in an appeal brought by other municipal entities and by ...
  21. desrpt_caroline_horton_house to convert the single family dwelling into multiple apartments, but the oval dining room and conservatory remain. In 1906, Architect W.D. ...
  22. desrpt_carolyn_horton_house to convert the single family dwelling into multiple apartments, but the oval dining room and conservatory remain. In 1906, Architect W.D. ...
  23. west_seattle_lr_street_concept -_sepa checklist government approvals or permits that will be needed for your proposal, if known. The Director’s Rule covered by this ...
  24. seattledesigncommission-2008.10.161200stewartminutes at the tunnel midpoint. It is possible to locate it underneath the building at 3rd Avenue and Battery Street, which is owned by Martin ...
  25. 1_summary_mha_deis_2017 . •Alternatives 2 and 3 would produce more new housing in the study area for every demolished unit—about 14 new units for every ...