Filter Results

1526 to 1550 of 2668
9.appendixofneworexpandedcapitalfacilites
, and pedestrian safety improvements.0CitywideTC367410Sound Transit - East LinkThis project will provide design review, ...
0.00216453429 |
a/62538
doc2_voluntary-separation-from-residential-towers_sepa-checklist
-project action. The proposal’s effect would apply to new development in the DOC2 zone of downtown Seattle. Projects going through the ...
0.00216453429 |
a/53437
fascap_000
) chiller plant replacement. o SMT elevator controller replacements. o SMT 14 demolition and structural repairs. o Roof ...
0.00216453429 |
a/62346
mimpannualstatusreportjuly2018-june2019
space that is currently lacking: To support this objective, SCC engaged in the following activities during the past year: The college ...
0.00216453429 |
a/76985
2017-work-program
Market and provide the Council with a recommendation on whether to permit it to participate.RISK MANAGEMENT ...
0.00216453429 |
a/53342
water
Department of Transportation (WSDOT) and the City of Seattle are co-leads for the project. WDSOT, in conjunction with the Seattle Department ...
0.00216453429 |
a/60573
culture_recreation_000
demolitions and partially funded the purchase and restoration of the Capehart Housing property in Discovery Park. • ...
0.00216453429 |
a/61902
culture_recreation
demolitions and partially funded the purchase and restoration of the Capehart Housing property in Discovery Park. • ...
0.00216453429 |
a/61901
northbeaconsepachecklist
covered by your proposal? If yes, explain: None are known. 2011 North Beacon Hill Legislative Rezone SEPA Environmental Checklist Page 2 ...
0.00216453429 |
a/88059
appendix_n_madison_cumulative_impacts_tm
. Reasonably foreseeable future actions (RFFAs) are actions that are considered likely to occur because they have been funded, approved, or ...
0.00216453429 |
a/106141
culture_and_recreation
several building and road demolitions and partially funded the purchase and restoration of the Capehart Housing property in ...
0.00216453429 |
a/61917
appendixd_airqualityghg_emissionsreport
p.m.) would have the least effect on traffic and would minimize indirect increases in traffic-related emissions. Burning of slash or ...
0.00216453429 |
a/168543
2009annualreport
and hired along with the start of planning the construction management. To save time on the overall project schedule, a separate, early ...
0.00216453429 |
a/99361
4-1_housing_socioeconomics_adu_deis_2018
roughly 135,000 lots in single-family zones have an AADU. Since their legalization citywide in 2010, about 550 DADUs have been constructed ...
0.00216453429 |
a/53168
upcoming_opps_2019_3.21
operators to their members, as required by City of Seattle permit conditions. The Survey will be designed to understand ...
0.00216453429 |
a/99804
upcoming_opps_2019_4.9
Develop survey instrument to be deployed by car share operators to their members, as required by City of Seattle permit ...
0.00216453429 |
a/99809
upcoming_opps_2019_4.9(0)
of Seattle permit conditions. The Survey will be designed to understand respondents’ transportation choices, particularly ...
0.00216453429 |
a/99808
upcoming_opps_2019_3.19
by City of Seattle permit conditions. The Survey will be designed to understand respondents’ transportation choices, ...
0.00216453429 |
a/99803
upcoming_opps_2019_4.15
to be deployed by car share operators to their members, as required by City of Seattle permit conditions. The Survey will ...
0.00216453429 |
a/99807
4-1_housing_socioeconomics_adu_feis_2018
or permitted. On average, 69 DADUs have been permitted annually since 2010, with the highest annual ...
0.00216453429 |
a/53169
trc1223 60 percent submittal
FOR REFERENCING AND REPLACING ALL SURVEY MONUMENTSTHAT MAY BE DISTURBED, DESTROYED OR REMOVED BY THE PROJECT AND AT LEAST 2 WORKINGDAYS ...
0.00216453429 |
a/145512
plans_gtdt pbl_90 percent design
BE DISTURBED, DESTROYED OR REMOVED BY THE PROJECT AND AT LEAST 2 WORKINGDAYS PRIOR TO THE WORK, MUST FILE AN APPLICATION FOR ...
0.00216453429 |
a/150306
gtdt 100 plan set
FOR REFERENCING AND REPLACING ALL SURVEY MONUMENTSTHAT MAY BE DISTURBED, DESTROYED OR REMOVED BY THE PROJECT AND AT LEAST 2 WORKINGDAYS ...
0.00216453429 |
a/152851
psb101922washingtonparkpp
(Complete). 2. Permitting (Complete). 3. Exploratory pre-construction demolition and special testing ...
0.00216453429 |
a/134946
lpb101922washingtonparkpp
(Complete). 2. Permitting (Complete). 3. Exploratory pre-construction demolition and special testing ...
0.00216453429 |
a/134902