Search Results
Results
1526 to 1550 of 2644
- bld_2015_guidelines_june_4015 25.16), no changes may be made (including but not limited to alteration, demolition, construction, reconstruction, ... 0.0022107 | | a/72773
- 3036201-lu re-notofappparties through: 10/12/2020 The following approvals are required: SEPA Environmental Review Other ... 0.0022107 | | a/77073
- secmeetingminutes010919 worked with the City for permitted events • In Europe and Russia, May 8th or 9th is celebrated as the end of the Patriotic ... 0.0022107 | | a/110174
- spu_drainage_wastewater_projects Canal in accordance with state and federal regulations. The project also intends to meet requirements of the City's current CSO National ... 0.0022107 | | a/61652
- psb1204245thplazasr , and no permit for such activity shall be issued unless a certificate of approval has been issued by the Department of ... 0.0022107 | | a/163067
- psb1204245thplazasr , and no permit for such activity shall be issued unless a certificate of approval has been issued by the Department of ... 0.0022107 | | a/163060
- isrd102325__606-12thaves._sr Ave S. – Pearl Warren Building Record #: DONH-COA-01888 Applicant Representatives: Aya Rojnuckarin, Urbal Architecture, and Demarus Tevuk, ... 0.0022107 | | a/174483
- lpb10-19-16_minutes ’s Standards #9 & #10 MM/SC/DB/JM 8:0:0 Motion carried. 5 101916.23 Columbia City Landmark District 3835 S. Edmunds St. Proposed ... 0.0022107 | | a/74625
- bld 2015_guidelines_ revision_draft ), no changes may be made (including but not limited to alteration, demolition, construction, reconstruction, restoration, ... 0.0022107 | | a/72645
- seattledesigncommission-2003.08.07sandpoint-magnusonparkminutes schedules. Many of the projects previously reviewed by the Design Commission are currently under construction or ... 0.0022107 | | a/85320
- psb041526fountainsr existing sign or erect or place any new sign or change the principal use of any building, or any portion of a building, structure or lot in ... 0.0022107 | | a/179708
- psb090325prefontainesr any new sign or change the principal use of any building, or any portion of a building, structure or lot in a special review district, and ... 0.0022107 | | a/172558
- psb041625prefontainfountainbriefsr or change the principal use of any building, or any portion of a building, structure or lot in a special review district, and no ... 0.0022107 | | a/167756
- spu_water_projects information management systems. SCADA measurement data will be used to assist in capacity planning, validating repairs, identifying ... 0.0022107 | | a/61283
- 2022-solid-waste-plan-update_acronyms-glossary and demolition CAP Clear Alleys Program CBO community-based organization CBSM community-based social marketing CCB Customer ... 0.0022107 | | a/146048
- spu_water_projects asset and maintenance information management systems. SCADA measurement data will be used to assist in capacity planning, validating ... 0.0022107 | | a/61341
- isrd2-8-22 and ground floor retail. The proposal includes demolition of two 1-2 story commercial buildings. Ms. Frestedt introduced ... 0.0022107 | | a/131073
- spu_drainage_wastewater_projects of the City's current CSO National Pollutant Discharge Elimination System (NPDES) permit. LTD Actuals2010Rev 2011 2012 2013 ... 0.0022107 | | a/61717
- nisqually_earthquake_aar locations around the City to enablereception of video from helicopter or mobile ground locations.· Remote controlled cameras on top of Key ... 0.0022107 | | a/56746
- caoannualreport2007 . Municipal Stormwater Permit Appeal The City intervened in an appeal brought by other municipal entities and by ... 0.0022107 | | a/50254
- desrpt_caroline_horton_house to convert the single family dwelling into multiple apartments, but the oval dining room and conservatory remain. In 1906, Architect W.D. ... 0.0022107 | | a/132350
- desrpt_carolyn_horton_house to convert the single family dwelling into multiple apartments, but the oval dining room and conservatory remain. In 1906, Architect W.D. ... 0.0022107 | | a/129557
- west_seattle_lr_street_concept -_sepa checklist government approvals or permits that will be needed for your proposal, if known. The Director’s Rule covered by this ... 0.0022107 | | a/159696
- seattledesigncommission-2008.10.161200stewartminutes at the tunnel midpoint. It is possible to locate it underneath the building at 3rd Avenue and Battery Street, which is owned by Martin ... 0.0022107 | | a/85455
- 1_summary_mha_deis_2017 . •Alternatives 2 and 3 would produce more new housing in the study area for every demolished unit—about 14 new units for every ... 0.0022107 | | a/64997