Filter Results

1501 to 1525 of 2660
certificate-of-approval_instructions
a permit, that must be issued before any changes can be made to the designated feature of a City landmark, or before ...
0.00216510752 |
a/74129
vol 0_bgt_feis_exec summ_web_lowrez
Permits, Licenses, and Approvals Likely Required for Proposal • State Environmental Policy Act (SEPA) • Seattle Shoreline ...
0.00216510752 |
a/100527
finalcapimplementationstrategy
. 2. Continued support of bike share program, which aims to launch in ...
0.00216510752 |
a/88350
finalcapimplementationstrategy
. 2. Continued support of bike share program, which aims to launch in ...
0.00216510752 |
a/57430
kingcountycapacitychargeresidentialseweruse
Division2009_10273w_res_sewer_cap_chg_1057.indd (Rev. 09/20)Please report any demolitions of pre-existing structures on ...
0.00216510752 |
a/98097
2010annualreport
seating on the adjacent sidewalks to increase public use and enjoyment of the city’s right of ways. Over the year, about 40 new café ...
0.00216510752 |
a/99365
isrd_election_2023_revisedisrdguidlines_for9.22.23
of Neighborhoods Director, City Hall, 600 4th Ave, 4th floor, PO Box 94649, Seattle, Washington 98124. Note: A Certificate of Approval is ...
0.00216510752 |
a/147561
07122012_cwc_strategic_plan_final_web_version
design;  Maintain momentum for design and outreach; Stay on schedule given permitting requirements; Develop plan for tra ...
0.00216510752 |
a/171090
07122012_cwc_strategic_plan_final_web_version
design;  Maintain momentum for design and outreach; Stay on schedule given permitting requirements; Develop plan for tra ...
0.00216510752 |
a/171947
isrd guidlines_4.28.23_final draft
Director, City Hall, 600 4th Ave, 4th floor, PO Box 94649, Seattle, Washington 98124. Note: A Certificate of Approval is not a ...
0.00216510752 |
a/142165
isrd guidlines_sepanotice_4.28.23
Director, City Hall, 600 4th Ave, 4th floor, PO Box 94649, Seattle, Washington 98124. Note: A Certificate of Approval is not a ...
0.00216510752 |
a/142080
20151015_lhes departures meeting 2 reduced
% lot coverage for structure of more than one‐story. Lot coverage restrictions may be waived by the director as a Type I decision when waive ...
0.00216510752 |
a/76814
capitolhilllightrailstationsitessepadetermination
with conditions [ ] DNS involving non-exempt grading, or demolition, or another agency with jurisdiction. BACKGROUND The ...
0.00216453429 |
a/86491
desrptfirestation5
northern area under right way use permit, all located in the SE quarter of Section 31, township 25, Range 4, in King County ...
0.00216453429 |
a/76032
2021 sepa checklist first hill landmk preserv
, what? None directly due to this non-project action. Future development, if permitted, could lead to ...
0.00216453429 |
a/87070
gb-ti-guide00_intro
construction, demolition and land-clearing waste materials have high value for salvage and reuse.BenefitsGreen building ...
0.00216453429 |
a/88381
2018-09-17-paac_meeting_minutes
assess the situation on the ground on a regular basis?  ...
0.00216453429 |
a/104469
harrison-st-901-designation
commercial buildings. Across the street to the west, the block is currently undergoing demolition and construction for a ...
0.00216453429 |
a/76416
lpb6-15-16_minutes
coinciding with an emergency removal permit by SDOT Urban Forestry. The condition was that a proposal to replant the trees ...
0.00216453429 |
a/74678
appendixcap
already signed. It is currently in planning and implementation is expected to start 2013. The Gigabit Squared project alone may generate an ...
0.00216453429 |
a/62337
phasedpermitrequestform
phasedpermitrequestform Phased Permit Request Form Date: A phased permit allows you to submit plans for ...
0.00216453429 |
a/97984
9.appendixofneworexpandedcapitalfacilites
, and pedestrian safety improvements.0CitywideTC367410Sound Transit - East LinkThis project will provide design review, ...
0.00216453429 |
a/62538
doc2_voluntary-separation-from-residential-towers_sepa-checklist
-project action. The proposal’s effect would apply to new development in the DOC2 zone of downtown Seattle. Projects going through the ...
0.00216453429 |
a/53437
fascap_000
) chiller plant replacement. o SMT elevator controller replacements. o SMT 14 demolition and structural repairs. o Roof ...
0.00216453429 |
a/62346
mimpannualstatusreportjuly2018-june2019
space that is currently lacking: To support this objective, SCC engaged in the following activities during the past year: The college ...
0.00216453429 |
a/76985