Filter Results

1501 to 1525 of 2601
trc1223 60 percent submittal
FOR REFERENCING AND REPLACING ALL SURVEY MONUMENTSTHAT MAY BE DISTURBED, DESTROYED OR REMOVED BY THE PROJECT AND AT LEAST 2 WORKINGDAYS ...
0.00219890731 |
a/145512
plans_gtdt pbl_90 percent design
BE DISTURBED, DESTROYED OR REMOVED BY THE PROJECT AND AT LEAST 2 WORKINGDAYS PRIOR TO THE WORK, MUST FILE AN APPLICATION FOR ...
0.00219890731 |
a/150306
gtdt 100 plan set
FOR REFERENCING AND REPLACING ALL SURVEY MONUMENTSTHAT MAY BE DISTURBED, DESTROYED OR REMOVED BY THE PROJECT AND AT LEAST 2 WORKINGDAYS ...
0.00219890731 |
a/152851
psb101922washingtonparkpp
(Complete). 2. Permitting (Complete). 3. Exploratory pre-construction demolition and special testing ...
0.00219890731 |
a/134946
lpb101922washingtonparkpp
(Complete). 2. Permitting (Complete). 3. Exploratory pre-construction demolition and special testing ...
0.00219890731 |
a/134902
507seattlestudio_web
rendering of the Stay lid designFigure 73 - Affordable housing map with property detailsFigure 74 - Permitted construction ...
0.00219890731 |
a/87184
ovg nasc arena presentation 42717
will be completed and approved by April 24, 2018.• Construction Documents will be completed and approved by December 21, ...
0.00219890731 |
a/56251
3aconstructionplans
EDGES, DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS WILL BE PERMITTED. THE CLEARING LIMITS ...
0.00219890731 |
a/154265
mimpannualstatusreportjuly2018-june2019
space that is currently lacking: To support this objective, SCC engaged in the following activities during the past year: The college ...
0.00219890731 |
a/76985
cam2217
cam2217 — part of a multi-departmental City of Seattle series on getting a permit 1 Seattle Department of Client ...
0.002198874 |
a/101624
bld011923guidelines
), no changes may be made (including but not limited to alteration, demolition, construction, reconstruction, restoration, ...
0.002198874 |
a/137658
bld_2015_guidelines_june_4015
25.16), no changes may be made (including but not limited to alteration, demolition, construction, reconstruction, ...
0.002198874 |
a/72773
secmeetingminutes010919
worked with the City for permitted events • In Europe and Russia, May 8th or 9th is celebrated as the end of the Patriotic ...
0.002198874 |
a/110174
spu_drainage_wastewater_projects
Canal in accordance with state and federal regulations. The project also intends to meet requirements of the City's current CSO National ...
0.002198874 |
a/61652
psb1204245thplazasr
, and no permit for such activity shall be issued unless a certificate of approval has been issued by the Department of ...
0.002198874 |
a/163067
psb1204245thplazasr
, and no permit for such activity shall be issued unless a certificate of approval has been issued by the Department of ...
0.002198874 |
a/163060
isrd102325__606-12thaves._sr
Ave S. – Pearl Warren Building Record #: DONH-COA-01888 Applicant Representatives: Aya Rojnuckarin, Urbal Architecture, and Demarus Tevuk, ...
0.002198874 |
a/174483
lpb10-19-16_minutes
’s Standards #9 & #10 MM/SC/DB/JM 8:0:0 Motion carried. 5 101916.23 Columbia City Landmark District 3835 S. Edmunds St. Proposed ...
0.002198874 |
a/74625
bld 2015_guidelines_ revision_draft
), no changes may be made (including but not limited to alteration, demolition, construction, reconstruction, restoration, ...
0.002198874 |
a/72645
seattledesigncommission-2003.08.07sandpoint-magnusonparkminutes
schedules. Many of the projects previously reviewed by the Design Commission are currently under construction or ...
0.002198874 |
a/85320
psb090325prefontainesr
any new sign or change the principal use of any building, or any portion of a building, structure or lot in a special review district, and ...
0.002198874 |
a/172558
psb041625prefontainfountainbriefsr
or change the principal use of any building, or any portion of a building, structure or lot in a special review district, and no ...
0.002198874 |
a/167756
spu_water_projects
information management systems. SCADA measurement data will be used to assist in capacity planning, validating repairs, identifying ...
0.002198874 |
a/61283
spu_water_projects
asset and maintenance information management systems. SCADA measurement data will be used to assist in capacity planning, validating ...
0.002198874 |
a/61341
isrd2-8-22
and ground floor retail. The proposal includes demolition of two 1-2 story commercial buildings. Ms. Frestedt introduced ...
0.002198874 |
a/131073