Filter Results

1501 to 1525 of 2019
spring 2021 nofa_rentalhousingprogram
, on change of use, or at the end of the loan term. Terms generally will permit borrowers to further defer payment of ...
0.00189412956 |
a/67631
2022 winter nofa
annually as simple interest. Repayment OH will generally make deferred payment loans that are payable in full on sale, on change of use, or ...
0.00189412956 |
a/67550
psbminutes2-5-20
-restaurant format ARC report: Change of use not reviewed at ARC. Jim Brown proposed a market hall concept for the ground floor and noted ...
0.00189412956 |
a/74229
lpb4-21-21
to secure Waterway 4 continued. The permit process would take another three years to complete. Soon after their ...
0.00189412956 |
a/74666
lpb9-2-20
Board opinion, and #2 - Obtained a SEPA Determination of Significance (DS) for the ' subdivision, construction of housing, change of use, ...
0.00189412956 |
a/74702
introduction
Pollutant Discharge Elimination System (NPDES) permits, one for storm water and one for combined sewer system. The City is ...
0.00189412956 |
a/62351
fortlawton-national-register-nomination
– FORT LAWTON KING COUNTY, WASHINGTON Section number 8 Page 21 of 29 Recreation called for the demolition of ...
0.00189412956 |
a/72897
pedretailareassurveyresponses
feelit would have a negative impact on the area.1/16/2014 9:03 AM271Avtech building is scheduled for demolition and a new v ...
0.00189412956 |
a/88130
seattle-city-council-2020-work-program
times.GROWING GRACEFULLYConsider tools to manage the impacts of growth in areas with high risk of displacement.IMPACT FEESConsider imposing ...
0.00189412956 |
a/53345
minimumfloorarearequirementleg
of Existing Maximum FAR and Proposed Minimum FAR Height Limit 30' 40' 65' 85' 125' 160' Maximum FAR Outside Station Area Overlay District ...
0.00189412956 |
a/98738
sidesewerresidentialsewerusecertificationsewagetreatmentcapacityc ...
Division1610_6969w_res_sewer_cap_chg_1057.indd White – King County Yellow – Local Sewer Agency Pink – Sewer Customer ...
0.00189412956 |
a/98024
nofa_rentalhousingprogram_2023
of the loan term. Terms generally will permit borrowers to further defer payment of principal, deferred interest, and ...
0.00189412956 |
a/144060
2022 fall nofa
OH will generally make deferred payment loans that are payable in full on sale, on change of use, or at the end of the loan term. Terms ...
0.00189412956 |
a/131856
parks
, Building 30 Sprinkler System, Building 18 demolition, North Shore, Pier and Log Boom, Picnic Shelter Renovation and ...
0.00189412956 |
a/61518
seattle-city-council-2015-work-program_adopted-version-(res-31571 ...
on the next Strategic Plan Update.DENNY SUBSTATION AND NODO NETWORKMonitor the permitting process for the Denny Substation ...
0.00189412956 |
a/53344
phase2sepachecklist
such applications would be considered “vested” or otherwise under review per current codes and regulations. 10. List any governmental ...
0.00189412956 |
a/87323
seattle arena rfp 1-11-2017
for design, permitting, development, demolition (if applicable), and construction of the Arena (the ...
0.00189412956 |
a/56207
sepa-checklist_mobile-home-park-overlay
environmental review. 10. List any government approvals or permits that will be needed for your proposal, if known. None ...
0.00189412956 |
a/53406
dns-northrainierparkdevel_signed
the knotweed and approximately 7,800 cu.yds of fill to return the site grades to match the surrounding sidewalks and develop the park. ...
0.00189412956 |
a/93439
jac-meeting-notes-2021
is the prime. The project scope is to replace the floating cover on the reservoir. The project will start on the 17th with ...
0.00189412956 |
a/58813
louisa boren k-8 don recommendations final_comments
23.55.020.B. The project calls for the demolition of an existing pole mounted sign and construction of a new ground mounted ...
0.00189412956 |
a/133194
psb030123wsdotsr
sidewalk and lighting complying with the District Standards. Because of the condition of the existing building, demolition ...
0.00189412956 |
a/139073
ose-bldg-performance-standards-dnsv5-june2023
or existing building. The proposal does not include any provisions that would create incompatibilities between adjacent uses or lead to the ...
0.00189412956 |
a/143301
readersguideoverview
of Seattle must abide by the City's two National Pollutant Discharge Elimination System (NPDES) permits, one for storm ...
0.00189412956 |
a/62720
uwannualreport2014
. TABLE 4 Amended Development Capacity by Campus Area Campus Area % of Total Campus Development Capacity in Campus Area ...
0.00189412956 |
a/77873