Filter Results

1376 to 1400 of 4989
alki_es_nomination_application
the addition of an elevator. Other permits listed by number and without descriptions, cite boilers or other ...
0.00222866749 |
a/126928
fas-pc-purchasing-terms-and-conditions
and Licenses:Fees and Licenses: Contractor shall pay for and maintain in a current status, any license fees, assessments, ...
0.002228257 |
a/58940
2012smcchapter12
2012smcchapter12 2012 SEATTLE MECHANICAL CODE121CHAPTER 12HYDRONIC PIPINGSECTION 1201GENERAL1201.1 Scope. The provisions of ...
0.002228257 |
a/97227
termsconditions-city
and will not pay for overages. 13. Taxes, Fees and Licenses: 13.1. Fees and Licenses: Contractor shall pay for and maintain in a current ...
0.002228257 |
a/113287
bike share 2018 privacy impact assessment - final
for surveillance. SDOT’s Free-Floating Bike Share Program permits private vendors to deploy bicycles and related ...
0.002228257 |
a/117052
2021sbcindex
, 1103.2.4, Appendix C, G114.1 AIR CONDITIONING (see MECHANICAL) AIRCRAFT HANGARS ... ...
0.002228257 |
a/162603
financial-statements-federal-single-audit-2010
contractors, must be sufficient to— (1) Permit preparation of reports required by this part and the statutes authorizing ...
0.002228257 |
a/58370
financial-audit-2010
to— (1) Permit preparation of reports required by this part and the statutes authorizing the grant, and (2) ...
0.002228257 |
a/58379
constructionpermitrenewals
constructionpermitrenewals CONSTRUCTION PERMIT RENEWALSConstruction permits expire 18 months after they ...
0.002228257 |
a/98070
3-1_housingsocioecon_mha_deis_2017
not have mechanisms to deter developers from economically evicting tenants prior to applying for a permit, ...
0.002228257 |
a/65000
447_hazmat_4
contamination. Development and implementation of these plans may be conditions of permits required for the project and are ...
0.002228257 |
a/100983
lpb020123continentalhotelnom
Architecture + Planning, with assistance from consulting historian Tom Heuser of T.G. Heuser Company. Research tasks involved the collection ...
0.002228257 |
a/138013
lpbcurrentnom_continentalhotel
Architecture + Planning, with assistance from consulting historian Tom Heuser of T.G. Heuser Company. Research tasks involved the collection ...
0.002228257 |
a/137450
draft 2017 city of seattle and seattle housing authority ...
Airport, and the SoDo industrial area. The arrival of light rail has also led to the permitting and construction R/ECAPs ...
0.002228257 |
a/69079
adu_deis_2018
charge, City permit fees, and architecture/engineering fees. In reality, the predevelopment cost reduction could be ...
0.002228257 |
a/53190
2018sfcchapter40
be)) are permitted for open stations in accordance with theprovisions of ((NFPA 101, Chapter 12)) Chapter 6 of the 2018 ...
0.002228233 |
a/97729
2012sbcappendixg
Scope. The provisions of this appendix shall apply toall proposed development in a flood hazard area establishedin Section 1612 of this ...
0.002228233 |
a/97333
desrpt_bordeaux
utility and support spaces for the house, including a laundry room and mechanical room. Utility services and ...
0.002228233 |
a/76326
desrptbordeaux
utility and support spaces for the house, including a laundry room and mechanical room. Utility services and ...
0.002228233 |
a/75913
561seattlepublicutilities
of combined sewers * • 68 pump stations • 90 permitted combined sewer overflow outfalls • 295 storm drain outfalls • 189 ...
0.002228233 |
a/61973
staff-report-and-analysis-for-ordinance-125425
and construct new multifamily building, occupy per plan. 3838 AURORA AVE N 6544278 4/3/2017 Fremont C1-40 Establish use as and construct a ...
0.002228233 |
a/53459
seattle_public_utilities
of combined sewers * • 68 pump stations • 90 permitted combined sewer overflow outfalls • 295 storm drain outfalls • 189 ...
0.002228233 |
a/61991
draft eis_spu draft mimp_appendices_a-f
draft eis_spu draft mimp_appendices_a-f DRAFT ENVIRONMENTAL IMPACT STATEMENT APPENDICES for the SEATTLE PACIFIC UNIVERSITY Major Institution ...
0.002228233 |
a/145270
albuquerque_findings
the culture of APD.5 It is imperative that the department continue to build on these reforms and improve its training, recruitment, and ...
0.00222818763 |
a/52302
sclcap
replaces existing protective relays, upgrades the generator protection packages, and replaces the electrical and mechanical ...
0.00222818763 |
a/62908