Filter Results

1151 to 1175 of 2573
sdot_2023adopted_2024endorsed
operating the city's movable bridges and traffic signals, cleaning streets, repairing potholes, issuing permits, ...
0.002193151 |
a/138598
spucip
miles of wastewater force mains • 82 City-owned and permitted Combined Sewer Overflow points • 38 Combined Sewer Overflow ...
0.002193151 |
a/147695
spu_2328cip
miles of wastewater force mains • 82 City-owned and permitted Combined Sewer Overflow points • 38 Combined Sewer Overflow ...
0.002193151 |
a/138622
spucip
miles of wastewater force mains • 82 City-owned and permitted Combined Sewer Overflow points • 38 Combined Sewer Overflow ...
0.002193151 |
a/134226
spu_2429adoptedcip
. These systems include approximately: • 448 miles of sanitary sewers • 968 miles of combined sewers • 67 Pump Stations • 5.5 miles of ...
0.002193151 |
a/153297
pedretailareassepadirectorsreportandrecommendation
pedestrian-oriented destinations in neighborhoods throughout the city. At the same time, concerns were raised about vacant spaces and the ...
0.002193151 |
a/88127
lpb041923cettolinhousenom
Transit light rail station on their block which might result in its demolition. This report was written and researched by ...
0.002193151 |
a/141025
lpb030123cettolinhousenom
Transit light rail station on their block which might result in its demolition. This report was written and researched by ...
0.002193151 |
a/139112
lpbcurrentnom_cettolinhouse
Transit light rail station on their block which might result in its demolition. This report was written and researched by ...
0.002193151 |
a/137963
kg-masterplanupdate_200121-final_websize
replacement2001 Tom Kubota Stroll Garden** (designed by Tom Kubota and Allan Kubota)2002 Material Bunkers2002 House ...
0.002193151 |
a/93238
lidi5fsc_presentation082019
and Regulatory RequirementsPhase 3 –DesignPhase 4 –Environmental Documentation, Permitting & R/W AcquisitionPhase 5 ...
0.002193151 |
a/87193
iaff first responder operations participant guide
by the IAFF at any time for failure to comply with these terms.Delivery of this program is free of charge by the IAFF, as federal funding ...
0.002193151 |
a/64436
lpbcurrentnom_wayneapartmentstext
Peterson of Nicholson Kovalchick Architects. Sources used in this report include:  Records of permits from the Seattle ...
0.002193151 |
a/74571
lpbcurrentnom_rainier beach graphics
....................................... A-43 Figure 79 • City of Seattle Permit no. 477553, To Const Bldgs - per plan, ...
0.002193151 |
a/74526
fap_consolidated
between the Port terminals and nearby intermodal facilities on which the City will permit heavy drayage vehicles up to ...
0.002193151 |
a/105856
rb_nom
....................................... A-43 Figure 79 • City of Seattle Permit no. 477553, To Const Bldgs - per plan, ...
0.002193151 |
a/75413
nfpa130amendments2012sfc
modification of any structure, provisions of ((NFPA 241,Standard for Safeguarding Construction, Alteration, and Demolition ...
0.002193151 |
a/64235
spufinal2019_wsp_volume1
water right permits. 1.1.2 System Description Today, SPU’s regional water system is the largest in Washington State. SPU ...
0.002193151 |
a/113234
presentation20160914_combined
be allowed for each development standard from which a departure has been requested. Minority reports shall be permitted. ...
0.002193151 |
a/76835
pspbminutes8-7-19
be required if some structural element is necessary. No walls or roofs of any kind are permitted to enclose sidewalk cafes. ...
0.00219304534 |
a/74088
waste_diversion_reports_instructions_aug2025
waste_diversion_reports_instructions_aug2025 Waste Diversion Report Instructions To access the report, you will need the ...
0.00219304534 |
a/172482
05-10_dpr_adopted_project_detail_final
of pilings and trusses, demolition and reconstruction of the deteriorated pier and pier shed on the east end of the pier; ...
0.00219304534 |
a/60776
05-10_proposed_cip_dpr_project_detail
and trusses, and demolition and reconstruction of the deteriorated pier and pier shed on the east end of the pier, financed ...
0.00219304534 |
a/60830
dpr_projects
this comprehensive repair including demolition and reconstruction of the deteriorated pier as well as reconstruction of the ...
0.00219304534 |
a/61117
dpr_projects
this comprehensive repair including demolition and reconstruction of the deteriorated pier as well as reconstruction of the ...
0.00219304534 |
a/61186