You just searched for:
Search
Filter Results
76 to 100 of 4989
2018seattleplumbingcode
http://seattle.gov/documents/departments/sdci/codes/plumbingcode/2018seattl ...
, construction debris, or other materials that will damage or break the piping or cause corrosive action. Mechanical ...
0.00241345121 |
a/97287
2012seattleplumbingcode
http://seattle.gov/documents/departments/sdci/codes/plumbingcode/2012seattl ...
SIZE(inches)(inches)1⁄2– 43⁄85 – 81⁄210 – 125⁄826GENERAL REGULATIONS2012 SEATTLE PLUMBING CODE action. Mechanical devices ...
0.00241296645 |
a/97285
2014standardspecifications
http://seattle.gov/documents/departments/spu/construction-resources/standar ...
shall be mixed in a mechanical mixer. If the Engineer permits, hand mixing of concrete will be ...
0.00240767 |
a/113664
2011_standard_specifications
http://seattle.gov/documents/departments/spu/construction-resources/standar ...
, batching and mixing procedures, and a list of the equipment performing the job-site mixing. All job site mixed concrete shall be mixed in ...
0.002405823 |
a/113660
2017standardspecifications
http://seattle.gov/documents/departments/spu/construction-resources/standar ...
and mixing procedures, and a list of the equipment performing the Job Site mixing. All Job Site mixed concrete must be mixed in a ...
0.00240008067 |
a/113668
2020_standard_specifications
http://seattle.gov/documents/departments/spu/construction-resources/standar ...
and mixing procedures, and a list of the equipment performing the Job Site mixing. All Job Site mixed concrete must be mixed in a ...
0.00239964738 |
a/113678
2008standardspecs
http://seattle.gov/documents/departments/spu/construction-resources/standar ...
and mixing procedures, and a list of the equipment performing the mixing at the Project Site. All Project Site mixed concrete shall be ...
0.00239875843 |
a/113657
proposed-city-of-seattle-2026-draft-standard-specifications
http://seattle.gov/documents/departments/spu/construction-resources/standar ...
in a mechanical mixer. If the Engineer permits, hand mixing of concrete will be ...
0.00239688787 |
a/174962
oneseattleplancouncilbill120993signedlegislation
http://seattle.gov/documents/departments/opcd/seattleplan/oneseattleplancou ...
of the projection. 10 8. Mechanical equipment. Heat pumps and similar mechanical equipment, not 11 ...
0.00239510112 |
a/176381
2020seattleelectricalcodequickreference
http://seattle.gov/documents/departments/sdci/codes/2020seattleelectricalco ...
on the energy code at 140% as approved by the mechanical review in BTU), the lesser of the two loads shall be ...
0.00238575041 |
a/96489
2000standardspec
http://seattle.gov/documents/departments/spu/construction-resources/standar ...
in writing, the Contractor shall not change the number, type, or location of splices.The Engineer may permit the Contractor ...
0.00238115783 |
a/113651
2023secquickreference
http://seattle.gov/documents/departments/sdci/codes/2023secquickreference.p ...
loss calculations based on the energy code at 150% as approved by the mechanical review in BTU), the lesser of the two ...
0.00238042069 |
a/163321
2020seattleelectricalcodereplacementpages
http://seattle.gov/documents/departments/sdci/codes/2020seattleelectricalco ...
on the energy code at 140% as approved by the mechanical re-view in BTU), the lesser of the two loads shall be ...
0.00237984559 |
a/96490
2003standardspecs
http://seattle.gov/documents/departments/spu/construction-resources/standar ...
, type, or location of splices.The Engineer may permit the Contractor to use thermal or mechanical splices ...
0.00237712474 |
a/113653
ordinance127375and127376
http://seattle.gov/documents/departments/sdci/codes/ordinance127375and12737 ...
. Charging devices for electric cars are considered mechanical equipment and are permitted in required ...
0.00237693731 |
a/176921
2015seattleplumbingcode
http://seattle.gov/documents/departments/sdci/codes/plumbingcode/2015seattl ...
means, except as may be expressly permitted in writing by the publisher.Second Edition First Printing, February ...
0.002374472 |
a/97286
2021swfullmanualfinaltrkchgs
http://seattle.gov/documents/departments/sdci/codes/stormwatercode/2021swfu ...
Permit for Discharges from Large and Medium Municipal Separate Storm Sewer Systems, modified effective August 1, ...
0.00237348326 |
a/96974
isrd012726_lslandmark_planset
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
INSERTS: CONCRETE INSERTS TO SUSPEND MECHANICAL, ELECTRICAL, AND ARCHITECTURAL WORK SHALL BE CAST-IN PLACE. POWER DRIVEN ...
0.002373121 |
a/176523
2021swfullmanualfinalclean
http://seattle.gov/documents/departments/sdci/codes/stormwatercode/2021swfu ...
(City), the Stormwater Code meets certain requirements that apply to the City from the 2019-2024 Phase I National Pollutant Discharge ...
0.00237176917 |
a/96972
2017electricalcodequickreference
http://seattle.gov/documents/departments/sdci/codes/2017electricalcodequick ...
or better protection against nail or screw penetration shall be permitted. Exception No. 3: The installation of all ...
0.00237129256 |
a/96459
2017electricalcodereplacementpages
http://seattle.gov/documents/departments/sdci/codes/2017electricalcoderepla ...
, and investigate accidents. How do I get an electrical permit? Online: You can apply online for any electrical ...
0.00237129256 |
a/96460
2011adoptedbudget
http://seattle.gov/documents/departments/financedepartment/11adoptedbudget/ ...
(MUPs); shoreline review; design review; approval of permits for construction, mechanical systems, site ...
0.00237085461 |
a/61809
2011adoptedbudget_000
http://seattle.gov/documents/departments/financedepartment/11adoptedbudget/ ...
Permits (MUPs); shoreline review; design review; approval of permits for construction, ...
0.00237085461 |
a/61810
2014seattleelectricalcodequickreference
http://seattle.gov/documents/departments/sdci/codes/2014seattleelectricalco ...
required by this section but shall be permitted to be installed to make a mechanical connection of the ...
0.00237060525 |
a/96437
treeregsconstitutentemailsthrough011320v2
http://seattle.gov/documents/departments/urbanforestrycommission/resources/ ...
to be in the updated tree ordinance: 1. Expand the existing Tree Removal and Replacement Permit Program, including 2-week ...
0.002368391 |
a/119478
Previous
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
Next