Filter Results

76 to 100 of 2639
2021-2026 hmp v.1.4 interim final
Power Administration BRIC Building Resilient Infrastructure and Communities FEMA Grant Program CIP Capital ...
0.001747727 |
a/126810
2021 hmp draft 0201_2021v.1.2
Administration BRIC Building Resilient Infrastructure and Communities FEMA Grant Program CIP Capital Improvement ...
0.001746763 |
a/57042
2021 hmp draft 0115_2021 for web
and through its building codes. The U.S. Geological Survey (USGS) has created a gauge to show when ...
0.00174438453 |
a/57086
confirmedurmlist
Alt Substantial alteration is a Seattle Existing Building Code process used when the ...
0.00173337758 |
a/96865
2018sfcchapter9
, repaired, oper-ated, and maintained in accordance with this code and the Seattle ...
0.00172203267 |
a/97756
2018sbcchapter4
2018sbcchapter4 2018 SEATTLE BUILDING CODE77CHAPTER 4SPECIAL DETAILED REQUIREMENTS BASED ...
0.00172041554 |
a/97450
cultureandrecreation
to rank the projects: Priority 1 – Code Requirements (100 points) The project brings a facility or element up to federal, ...
0.00172035664 |
a/62340
comprehensive-annual-financial-report-2019
% in 2018 and 2.7% in 2019, the strongest readings since 2007. Seattle metropolitan area economy. Since ...
0.00171708385 |
a/58364
2018sebcappendixa
mortar or grout. 2018 SEATTLE EXISTING BUILDING CODE 93 ...
0.00171617384 |
a/97148
seattle_city_light
Actuals2012201320142015201620172018TotalBCL/Program Name2013 - 2018 Adopted Capital Improvement Program*Amounts in ...
0.00171481655 |
a/61981
for filing and wsr combined
to the 2018 text, and aligns the code with the scoping provisions of NFPA 13R. The 2021 change ...
0.0017145325 |
a/64297
cultureandrecreation
is: “Seattle Parks and Recreation will work with all citizens to be good stewards of our environment, and to provide safe ...
0.00171415671 |
a/62373
2018srcintro
fixtures must be properly installed so that they are usable by the occupants of the building, this chapter contains the ...
0.00171366916 |
a/97891
351seattlecitylight
Fund13,83102,0752,5591,1581,1851,2151,24523,268Total*:13,83102,0752,5591,1581,1851,2151,24523,268Fund ...
0.00171139371 |
a/61972
seattle_city_light
Building ImprovementsSeattle City Light4702013 - 2018 Proposed Capital Improvement Program*This detail is ...
0.00170992548 |
a/61990
2018sbcchapter30
2018sbcchapter30 2018 Seattle Building Code Excerpt: Elevators and ...
0.001704422 |
a/97444
2018sbcelevatorexcerpt
2018sbcelevatorexcerpt 2018 Seattle Building Code Excerpt: Elevators ...
0.001704422 |
a/97459
summit_consultantcontract_pos
INC000003986812/13/201612/31/2017ClosedFire Protecting Engineering Services for HALA Building Code ...
0.00170418748 |
a/58666
2018sbcchapter9
2018sbcchapter9 2018 SEATTLE BUILDING CODE305CHAPTER 9FIRE PROTECTION AND LIFE SAFETY ...
0.00170157955 |
a/97455
desrpt_1101epike
of Seattle Department of Construction and Inspections (SDCI), Unreinforced Masonry Buildings- Project ...
0.00170128746 |
a/76323
sclcip
demand, particularly for those with access to modern energy efficient technology and dwellings. Due in part to energy efficient ...
0.00170069409 |
a/127138
2018annualreport
and dedicated staff in bringing value to our customer-owners. Sincerely,Debra Smith General Manager and CEO3SEATTLE CITY LIGHT | ...
0.001699133 |
a/50700
wfe_update_report_final
Appendix N: Targeted Recruitment 2018 Actions ...
0.00169872481 |
a/69023
wfe_update_report_final
Appendix N: Targeted Recruitment 2018 Actions ...
0.00169872481 |
a/67872
2018sbcchapter1
2018sbcchapter1 2018 SEATTLE BUILDING CODE1CHAPTER 1SCOPE AND ADMINISTRATIONNote: Chapter ...
0.001697998 |
a/97421