Skip to main content
This is an official government website.

Search Results

Search

Filters
Topics [14]
Departments [34]
Documents [2590]

Filters

Topics [14]
Departments [34]
Documents [2590]

Results

876 to 900 of 2629
  1. parks_06-11 Point Settlement ProjectsBCL/Program Code:K729822500000000250Discovery Park - Building 653 Demolition and Site ...
  2. pikepinestaffreport lot and did not result in the demolition of any character structures. In contrast, of the nine projects that are currently ...
  3. oneseattleplandeispublicservices Permitted Facilities in Seattle: Operator Facility Type Seattle Public Utilities North Transfer Station ▪ City-contracted ...
  4. seattleindustrialfeischapter1 buildings for landmark review when demolition of properties that are over 50 years old is proposed, regardless of City ...
  5. seattle industrial feis ch 1 2022_09 to nominate buildings for landmark review when demolition of properties that are over 50 years old is proposed, regardless ...
  6. seattle industrial deis ch 1 2021_12 of residential uses.Summary ƒWide range of light and heavy industrial uses permitted. ƒStrict size of use and maximum FAR ...
  7. sepa determination - mha dtslu implementation housing, providing protections for tenants and low-income homeowners, streamlining permitting systems to reduce housing ...
  8. admiral_way_repl_study_final_report_5-31-24 and Permitting Considerations ........................................................................................... ...
  9. psb121025prefontainefountainps REQUIRED PERMITS, INCLUDING BUT NOT LIMITED TO:1.4.1.1.BUILDING DEMOLITION (IF REQUIRED BY ...
  10. psb121725prefontainefountainps REQUIRED PERMITS, INCLUDING BUT NOT LIMITED TO:1.4.1.1.BUILDING DEMOLITION (IF REQUIRED BY ...
  11. lpb090325meridianplaygroundpp shown above, andsupplemented by Special Provisions.FOR PARK USE ONLYSCALEORDINANCE NO.DATEOFSHEET3######07-30-2025SDCI ...
  12. 2015sfcchapter6 and equipment, mechanical refrigeration systems, elevator recall, stationary storage battery systems and commercial kitchen equipment. 601.2 ...
  13. spu_drainage_wastewater_projects discharge to Salmon Bay. Major work includes flow monitoring, system modeling, facility planning, preliminary engineering, design, ...
  14. 2020 mimp annual report final(0) ’s Major Institution Master Plan (MIMP) for its Hospital Expansion Project. On November 29, 2010, the Department of Planning and ...
  15. spu_drainage_wastewater_projects 150/151 and 152, which discharge to Salmon Bay. Major work includes flow monitoring, system modeling, facility planning, preliminary ...
  16. 2023sepachecklist . None. 10. List any government approvals or permits that will be needed for your proposal, if known. Approval of the ...
  17. 2012seccommercialchapter1 for the effective use and conservation ofenergy over the useful life of each building. This code isintended to provide flexibility to ...
  18. summary-of-edits_ 2023-to-2026-edition reports for private property located in an Environmentally Critical Area Geographically Hazardous zone if the private property has been ...
  19. psb040523unionhotelpp #MUP #1 09/28/22 WDW COST EST.2 01/18/23 PERMIT 3 03/06/23 WINDOW SURVEY3/6/2023 1:38:54 ...
  20. psb032923unionhotelpp #MUP #1 09/28/22 WDW COST EST.2 01/18/23 PERMIT 3 03/06/23 WINDOW SURVEY3/6/2023 1:38:54 ...
  21. desrptfederalreservebank that the Federal Reserve Bank of San Francisco, as a federal agency, did not always obtain building permits for of its ...
  22. requestdecommfireprotsyst 4.1. Demolition Permit from Seattle Dept of Construction and Inspections (SDCI). Check one box ...
  23. sdotcip public engagement, design review, permitting and construction support for transit stations. As well as constructing ...
  24. sdot lanes, in-lane stops/bus bulbs, and bus stop and station access amenities. SDOT also provides support for Sound Transit projects through ...
  25. appendix_a_adu_feis_2018 be demolished to make room for a DADU, so the footprint determines the demolition cost.Size of daylight basement, if ...