You just searched for:
Search
Filter Results
751 to 775 of 4989
2021srcchapter7
http://seattle.gov/documents/departments/sdci/codes/seattleresidentialcode/ ...
of application permitted as interior and exterior wall coverings. Interior coverings include interior plaster, gypsum ...
0.00224783551 |
a/162795
dr_sdot11-2015
http://seattle.gov/documents/departments/sdot/about/documentlibrary/directo ...
for City Staff and partner agencies involved with the design, permitting and construction of improvements to Seattle's ...
0.0022477645 |
a/99187
ccac_073014_appendices
http://seattle.gov/documents/departments/fas/purchasingandcontracting/labor ...
Committee’s role is to advise on whether there should be a targeted hire policy, what that policy should be, and what ...
0.00224775053 |
a/58771
appendix_ccac_report_7-21-14
http://seattle.gov/documents/departments/fas/purchasingandcontracting/labor ...
, what that policy should be, and what mechanisms to use to implement the policy. Nancy demonstrated how compliance and ...
0.00224775053 |
a/58713
2018sbcchapter12
http://seattle.gov/documents/departments/sdci/codes/seattlebuildingcode/201 ...
in this chapter and in conjunction with the International Mechanical Code® and the International Energy Conservation Code® ...
0.00224768813 |
a/97424
ose director's rule 2025-01_final - signed
http://seattle.gov/documents/departments/ose/building energy/beps ...
mechanical or metering equipment such as energy meters, building controls, heating, or ventilation or share a thermal ...
0.00224765833 |
a/175728
2003sbc
http://seattle.gov/documents/departments/sdci/codes/seattlebuildingcode/200 ...
,donotapplytoanystructureconstructedandmaintainedincompliancewithstandardsandproceduresoftheSeattleBuilding,Mechanical,Fire ...
0.00224761129 |
a/97324
4-3_written_comment_responses_mha_feis_2017
http://seattle.gov/documents/departments/hala/policy/mha_feis/4-3_written_c ...
production, understanding that projects already permitted will not contribute to affordable housing payment or performance. ...
0.00224755518 |
a/65044
sdotreportfinalsept
http://seattle.gov/documents/departments/cityauditor/auditreports/sdotrepor ...
performance is tracked and reported. Communications SDOT has developed a number of mechanisms to communicate information ...
0.00224744529 |
a/50631
wa_park_plan_set
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
” HIGH AT ALASKAN WAY NEWELEVATOR OVERRUN+/- 45’-0”+/- 25-8”SETBACKEXISTING PARTY WALLNEW PENTHOUSE STEPS BACK 3’-0” FROM EXISTING WINDOWS ...
0.00224737381 |
a/74263
seattle-sewer-pos-2014
http://seattle.gov/documents/departments/seattlegovportals/business/investo ...
business days after the City’s acceptance of the successful bidder’s bid, in sufficient quantities to permit the successful ...
0.00224732934 |
a/107403
seattle-sewer-pos-2014
http://seattle.gov/documents/departments/investorrelations/delete/seattle-s ...
business days after the City’s acceptance of the successful bidder’s bid, in sufficient quantities to permit the successful ...
0.00224732934 |
a/58550
uptownrezoneordinance
http://seattle.gov/documents/departments/opcd/ongoinginitiatives/uptownfram ...
2. The limit on the number of dwelling units permitted in an apartment in the LR1 8 zone in subsection 23.45.512.D does not ...
0.00224732934 |
a/87903
2012srcappendixe
http://seattle.gov/documents/departments/sdci/codes/seattleresidentialcode/ ...
not qualify as a manufactured homeas defined herein.BUILDING SERVICE EQUIPMENT. Refers to theplumbing, mechanical and ...
0.00224727276 |
a/97773
2018srcchapter2
http://seattle.gov/documents/departments/sdci/codes/seattleresidentialcode/ ...
than repair or addition thatrequires a permit. Also, a change in a building, electrical, gas, mechanical ...
0.00224725483 |
a/97872
boundaryterrestrialresourcemgmtplan
http://seattle.gov/documents/departments/citylight/boundaryterrestrialresou ...
that could not be violated except for conditions such as equipment failures, maintenance activities, electrical and ...
0.00224699639 |
a/50771
2018sbcchapter2
http://seattle.gov/documents/departments/sdci/codes/seattlebuildingcode/201 ...
. Where terms are not defined in this code and are defined in the International Energy Conservation Code, International Fuel Gas Code, ...
0.00224699639 |
a/97432
tenessentialstepstostartabusinessinseattle_2014
http://seattle.gov/documents/departments/economicdevelopment/tenessentialst ...
. DPD issues a series of construction-related permits, including building permits, demolition ...
0.00224679126 |
a/56220
northlotdirectorsreport
http://seattle.gov/documents/departments/opcd/vault/southdowntown/northlotd ...
) is proposing to amend the City’s Land Use Code (SMC, Title 23) to allow increases in permitted height under specified ...
0.00224679126 |
a/88162
2012sbcchapter16
http://seattle.gov/documents/departments/sdci/codes/seattlebuildingcode/201 ...
, allowable stressdesign, empirical design or conventional construction meth-ods, as permitted by the applicable material ...
0.00224679126 |
a/97347
seattle-sewer-os-2014
http://seattle.gov/documents/departments/investorrelations/delete/seattle-s ...
insured or to the extent guaranteed as permitted under any other provision of State law. Failure to Pay Bonds If the ...
0.00224675727 |
a/58549
seattle-sewer-os-2014
http://seattle.gov/documents/departments/seattlegovportals/business/investo ...
insured or to the extent guaranteed as permitted under any other provision of State law. Failure to Pay Bonds If the ...
0.00224675727 |
a/107402
2021sebcchapter8
http://seattle.gov/documents/departments/sdci/codes/existingbuildingcode/20 ...
the reconfiguration is exclusively the result of compliance with the accessibility require-ments of Section 306.7.1 shall be ...
0.00224663317 |
a/162627
udistrictfeiscomments
http://seattle.gov/documents/departments/opcd/ongoinginitiatives/udistrictu ...
of Planning and Development (DPD) on April 24, 2014 provided no mitigation to any of these problems. This document reads as if it provides ...
0.00224652421 |
a/87835
energyplanningforasustainableneighborhood
http://seattle.gov/documents/departments/opcd/vault/southdowntown/energypla ...
were f ent le to eliminate or greatly reduce the impact on soil surrounding ble. if it so underwrite loan funding to pay for ...
0.00224639452 |
a/88149
Previous
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
Next