Filter Results

751 to 775 of 4989
2021srcchapter7
of application permitted as interior and exterior wall coverings. Interior coverings include interior plaster, gypsum ...
0.00224783551 |
a/162795
dr_sdot11-2015
for City Staff and partner agencies involved with the design, permitting and construction of improvements to Seattle's ...
0.0022477645 |
a/99187
ccac_073014_appendices
Committee’s role is to advise on whether there should be a targeted hire policy, what that policy should be, and what ...
0.00224775053 |
a/58771
appendix_ccac_report_7-21-14
, what that policy should be, and what mechanisms to use to implement the policy. Nancy demonstrated how compliance and ...
0.00224775053 |
a/58713
2018sbcchapter12
in this chapter and in conjunction with the International Mechanical Code® and the International Energy Conservation Code® ...
0.00224768813 |
a/97424
ose director's rule 2025-01_final - signed
mechanical or metering equipment such as energy meters, building controls, heating, or ventilation or share a thermal ...
0.00224765833 |
a/175728
2003sbc
,donotapplytoanystructureconstructedandmaintainedincompliancewithstandardsandproceduresoftheSeattleBuilding,Mechanical,Fire ...
0.00224761129 |
a/97324
4-3_written_comment_responses_mha_feis_2017
production, understanding that projects already permitted will not contribute to affordable housing payment or performance. ...
0.00224755518 |
a/65044
sdotreportfinalsept
performance is tracked and reported. Communications SDOT has developed a number of mechanisms to communicate information ...
0.00224744529 |
a/50631
wa_park_plan_set
” HIGH AT ALASKAN WAY NEWELEVATOR OVERRUN+/- 45’-0”+/- 25-8”SETBACKEXISTING PARTY WALLNEW PENTHOUSE STEPS BACK 3’-0” FROM EXISTING WINDOWS ...
0.00224737381 |
a/74263
seattle-sewer-pos-2014
business days after the City’s acceptance of the successful bidder’s bid, in sufficient quantities to permit the successful ...
0.00224732934 |
a/107403
seattle-sewer-pos-2014
business days after the City’s acceptance of the successful bidder’s bid, in sufficient quantities to permit the successful ...
0.00224732934 |
a/58550
uptownrezoneordinance
2. The limit on the number of dwelling units permitted in an apartment in the LR1 8 zone in subsection 23.45.512.D does not ...
0.00224732934 |
a/87903
2012srcappendixe
not qualify as a manufactured homeas defined herein.BUILDING SERVICE EQUIPMENT. Refers to theplumbing, mechanical and ...
0.00224727276 |
a/97773
2018srcchapter2
than repair or addition thatrequires a permit. Also, a change in a building, electrical, gas, mechanical ...
0.00224725483 |
a/97872
boundaryterrestrialresourcemgmtplan
that could not be violated except for conditions such as equipment failures, maintenance activities, electrical and ...
0.00224699639 |
a/50771
2018sbcchapter2
. Where terms are not defined in this code and are defined in the International Energy Conservation Code, International Fuel Gas Code, ...
0.00224699639 |
a/97432
tenessentialstepstostartabusinessinseattle_2014
. DPD issues a series of construction-related permits, including building permits, demolition ...
0.00224679126 |
a/56220
northlotdirectorsreport
) is proposing to amend the City’s Land Use Code (SMC, Title 23) to allow increases in permitted height under specified ...
0.00224679126 |
a/88162
2012sbcchapter16
, allowable stressdesign, empirical design or conventional construction meth-ods, as permitted by the applicable material ...
0.00224679126 |
a/97347
seattle-sewer-os-2014
insured or to the extent guaranteed as permitted under any other provision of State law. Failure to Pay Bonds If the ...
0.00224675727 |
a/58549
seattle-sewer-os-2014
insured or to the extent guaranteed as permitted under any other provision of State law. Failure to Pay Bonds If the ...
0.00224675727 |
a/107402
2021sebcchapter8
the reconfiguration is exclusively the result of compliance with the accessibility require-ments of Section 306.7.1 shall be ...
0.00224663317 |
a/162627
udistrictfeiscomments
of Planning and Development (DPD) on April 24, 2014 provided no mitigation to any of these problems. This document reads as if it provides ...
0.00224652421 |
a/87835
energyplanningforasustainableneighborhood
were f ent le to eliminate or greatly reduce the impact on soil surrounding ble. if it so underwrite loan funding to pay for ...
0.00224639452 |
a/88149