Search Results
Results
701 to 725 of 2629
- 2012sebcchapter15 , combined sewers and runoff, inter-cepted during the progress of the work, shall be returned tothe condition present before the ... 0.0022309355 | | a/97114
- sepathresholdsupdatedraftordinancesept25 threshold for referral to Department of Neighborhoods (DON) Zone Permit applications for additions, modifications, ... 0.00223093363 | | a/173542
- seattle_public_utilities_000 of combined sewers • 68 pump stations • 90 permitted combined sewer overflow outfalls • 342 storm drain outfalls • 130 ... 0.00223093363 | | a/61913
- seattle_public_utilities sewers • 68 pump stations • 90 permitted combined sewer overflow outfalls • 342 storm drain outfalls • 130 stormwater ... 0.00223093363 | | a/61912
- 2026-2028_housingfundingpolicies Affordability provisions) are subject to requirements in applicable ordinances, laws and any related agreements or permit ... 0.00223093363 | | a/182958
- seattle_public_utilities of combined sewers • 68 pump stations • 90 permitted combined sewer overflow outfalls • 342 storm drain outfalls • 130 ... 0.00223093363 | | a/61923
- pspb060122_section_2 maintenance to make a structure qualify for demolition for the prospect of building new construction is not ... 0.00223093363 | | a/128628
- pspb052522_section_2 maintenance to make a structure qualify for demolition for the prospect of building new construction is not ... 0.00223093363 | | a/128508
- seattle-solid-waste-pos-2014 , in sufficient quantities to permit the successful bidder to comply with Rule 15c2-12. By submitting the successful bid ... 0.00223093363 | | a/107413
- seattle-solid-waste-pos-2014 , in sufficient quantities to permit the successful bidder to comply with Rule 15c2-12. By submitting the successful bid ... 0.00223093363 | | a/58562
- providence-swedish first hill mimp_2023 annual report_final will be completed with permit applications if any major noise operations are proposed. Noise variance ... 0.002230662 | | a/160491
- 431_water_4c to the project are as follows. Federal Under the Clean Water Act (CWA) Section 402: NPDES State Waste Discharge Individual ... 0.002230662 | | a/100980
- wa_park_plan_set line is less than or equal to 7.5 percent, the elevation of maximum height shall be determined by adding the maximum ... 0.002230662 | | a/74263
- spucap_000 • 5.5 miles of wastewater force mains • 87 City-owned and permitted Combined Sewer Overflow points • 38 Combined Sewer ... 0.00223059277 | | a/62363
- psbminutes7-19-17 . C. Awnings. Awnings shall be functional, serving as weather protection for pedestrians at street level, and shall overhang the sidewalk a ... 0.00223043864 | | a/73816
- 2015sfcerratainsert )). An operational permit is required for operation of repair garages((, and automotive, marine and fleet motor ... 0.002230431 | | a/97690
- backyardcottagesfinalbycdirectorsreport construction in the southeast, DPD now proposes to allow backyard cottages throughout the city’s single-family zones. Seventeen ... 0.002230431 | | a/86788
- mimp2007 Council Condition #1SSCC shall create and maintain a Standing Advisory Committee (SAC) to review and evaluate all proposed and potential ... 0.002230131 | | a/77331
- review team evaluations 060217 for design, permitting, development, demolition (if applicable), and construction of the Arena (the ... 0.002230131 | | a/56240
- lpb071026lakecitylibrarypp CONSIDERATIONS.5.CONSTRUCTION AND SEDIMENT CONTROL PLAN BMPS MUST BE IN PLACE AT ALL TIMES.6.THE CONTRACTOR SHALL OBTAIN ALL REQUIRED CITY ... 0.002230131 | | a/182726
- lpb071526lakecitylibrarypp CONSIDERATIONS.5.CONSTRUCTION AND SEDIMENT CONTROL PLAN BMPS MUST BE IN PLACE AT ALL TIMES.6.THE CONTRACTOR SHALL OBTAIN ALL REQUIRED CITY ... 0.002230131 | | a/182864
- seattle-solid-waste-os-2014 for demolition upon completion of the North Transfer Station in 2016. Each transfer station has a separate annual solid ... 0.00223006657 | | a/58561
- seattle-solid-waste-os-2014 for demolition upon completion of the North Transfer Station in 2016. Each transfer station has a separate annual solid ... 0.00223006657 | | a/107412
- 220831 ma_don (alki es departures presentation) r2 that structure was demolished in 1965. This delineation of renovation and demolition aligns with the existing structural ... 0.00223006657 | | a/133193
- lpb2-17-16_minutes that she will be reviewing the emergency demolition permitting with SDCI as they proceed. She said that ... 0.00223001745 | | a/74647