Filter Results

701 to 725 of 2775
desrpt_center_wooden_boats
in the Center’s original permit requests and are the primary focus of this report. The overall design of the Center’s ...
0.00207777228 |
a/76330
2014tiger-seattlenorthgatefinalapplicationconsolidated
units of lower-cost rental housing) in 2012, the owner agreed to dedicate land for a publicly subsidized affordable housing project at no ...
0.00207774155 |
a/100746
lpbcurrentnom_kimball_elementary
alterations or demolition of the subject building described within this report will require a permit from ...
0.00207774155 |
a/74490
lpbcurrentnom_kimball_elementary
alterations or demolition of the subject building described within this report will require a permit from ...
0.00207774155 |
a/75355
sw-620_cd_facilitycertification_hardmarkup
sw-620_cd_facilitycertification_hardmarkup DRAFT 5/27/2020 Director’s Rule Title Requirements for Qualified Construction and ...
0.00207769265 |
a/113263
sw4051cdfacilitiescertification(final)
sw4051cdfacilitiescertification(final) Official copy of signed original. Director’s Rule Title Requirements for Qualified Construction and ...
0.00207769265 |
a/113266
finalsw405.1rev1cdfacilitycertificationrule
finalsw405.1rev1cdfacilitycertificationrule Official copy of signed original. Director’s Rule Title Requirements for Qualified ...
0.00207769265 |
a/113839
sw4051cdfacilitiescertification(final)
sw4051cdfacilitiescertification(final) Official copy of signed original. Director’s Rule Title Requirements for Qualified Construction and ...
0.00207769265 |
a/111806
finalsw405.1rev1cdfacilitycertificationrule
finalsw405.1rev1cdfacilitycertificationrule Official copy of signed original. Director’s Rule Title Requirements for Qualified ...
0.00207769265 |
a/111295
greenhomeguide-hirepro
for onsite renewable energy production, or for installing stormwater management systems such as rain gardens■ expedited and facilitated ...
0.00207769265 |
a/88401
decision20170731
regulations require control of fugitive dust to protect air quality and require permits for removal of asbestos during ...
0.002077604 |
a/76727
appdxd_allotherreports
) and the beginning of on-site activities (March 1, 2015). During this "Planning Phase" the Contractor must submit and receive Approvals for ...
0.002077604 |
a/100830
4-2_land_use_adu_feis_2018
of a single-family house since 1994. DADUs have been allowed citywide in the rear yard of a lot in a single-family zone since 2010. Through ...
0.00207750988 |
a/53171
seattle_public_utilities
, property acquisition, preliminary engineering, design, permitting, public works contracting, demolition ...
0.00207744 |
a/60916
spu_06-11
miles of combined sewers • 768 pump stations • 93 permitted combined sewer overflow outfalls • 277 storm drain outfalls • ...
0.00207744 |
a/60977
lpbcurrentnom_rec f evangelical chruch and parsonage lmb r
.......................................................... A-30 Figure 57 • City of Seattle Permit # 44332, 1906 ...
0.00207744 |
a/74529
psbminutes3-1-17
lighting was installed and the way he proposed to install the additional lighting, the awning was internally illuminated which was not ...
0.00207739 |
a/73807
reviewofregulatorytools
for Seattle’s industri-al zoned land, some permitted in all industrial zones, some not permitted in any ...
0.00207739 |
a/87985
regulatorytools
for Seattle’s industri-al zoned land, some permitted in all industrial zones, some not permitted in any ...
0.00207739 |
a/86783
opcdcomprehensiveplanurbanvillageindicatorsmonitoringreport2018
requires demolition of existing buildings. Analysis of recent permit data indicates that for every ...
0.00207739 |
a/87621
opcd comprehensive plan urban village indicators monitoring rpt 6 ...
development typically requires demolition of existing buildings. Analysis of recent permit data indicates ...
0.00207739 |
a/87612
pikepinetodbackgroundreport
that may be at risk of demolition. Once the development rights are sold, they are no longer available to be used on the ...
0.00207722746 |
a/87337
terminal91developmentoptions
% and in Bothell it is roughly 40%. Transactions in the works in Seattle are expected to put more pressure on the market. In anticipation, ...
0.00207722746 |
a/86347
terminal91developmentoptions
% and in Bothell it is roughly 40%. Transactions in the works in Seattle are expected to put more pressure on the market. In anticipation, ...
0.00207722746 |
a/87015
doc2_voluntary-separation-from-residential-towers_draft-bill
revised August 15, 2016 19 6. Determinations of Significance (determination that an Environmental Impact 1 Statement is required) for Master ...
0.00207721372 |
a/53435