Filter Results

626 to 650 of 5193
sepa-checklist-routinedrainagemaintenance-092623
be subject to various permit requirements and work prioritization. This Checklist analyzes routine maintenance, not ...
0.00219649356 |
a/158510
adrule12.01.22
: 10/01/2022 REFERENCES: 2018 Seattle Fire Code 2018 Seattle Building Code 2018 Seattle Mechanical Code 2021 ...
0.00219640718 |
a/134681
ad_rule_12.01.22_draft
EFFECTIVE DATE: 10/01/2022 REFERENCES: 2018 Seattle Fire Code 2018 Seattle Building Code 2018 Seattle Mechanical Code ...
0.00219640718 |
a/163306
hala_report_2015
be summarized as: • MORE RESOURCES FOR AFFORDABLE HOUSING (more subsidy, through a range of revenue generating mechanisms) ...
0.00219640671 |
a/64930
hala_report_2015
be summarized as: • MORE RESOURCES FOR AFFORDABLE HOUSING (more subsidy, through a range of revenue generating mechanisms) ...
0.00219640671 |
a/118554
dpd
review; approval of permits for construction, mechanical systems, site development, elevators, electrical ...
0.00219638227 |
a/62412
dpd
review; approval of permits for construction, mechanical systems, site development, elevators, electrical ...
0.00219638227 |
a/62484
57_ifc_2021
, the International Building Code and the International Mechanical Code pertaining to flammable liquids shall apply. [S] ...
0.002196363 |
a/139036
2021sfcchapter57
Referenced documents. The applicable requirements of Chapter 50, other chapters of this code, the International Building Code and the ...
0.002196363 |
a/162539
2021annualwastewatercollectionsystemreport
by the permit expiration date.  Prohibits overflows from the CSO outfalls during dry weather. Regardless of their cause ...
0.00219628 |
a/127427
commkitchenhoodworksheet
processing area or food service area:YesNoIf no, provide construction or change of use permit number:C. Location of ...
0.00219614524 |
a/97909
2022annualwastewatercollectionsystemreport
................................................................................................. 1 1.2 Collection System NPDES ...
0.002196092 |
a/142726
2023_auar_attachments
List(departments)Top Requests1.Transit (transportation/getting-around/transit)2.Get an RPZ ...
0.002196092 |
a/153083
92-salelegislation
, waivers, permits, licenses and other authorizations issued by any local, county, state and/or federal governmental, ...
0.00219606422 |
a/59723
2_wshb - appendices_10-16-20
for Site Response Analysis Mechanism Crustal Reverse Oblique Crustal Reverse Oblique Crustal Reverse Crustal Reverse ...
0.00219606422 |
a/101321
2012sbcchapter18
. Geotechnical investiga-tions shall be conducted in accordance with Sections 1803.3through 1803.5.Exception: The building official shall be ...
0.00219596643 |
a/97349
2012srcchapter4
the provisions of Section R322. Wood foundations shallbe designed and installed in accordance with AF&PA PWF.Exception: The provisions of ...
0.00219588168 |
a/97807
seattle-drainage-pos-2017
to permit the successful bidder to comply with Rule 15c2-12. By submitting the successful proposal for the Bonds, the ...
0.00219588168 |
a/58518
dclu
Environmental Policy Act (SEPA); - Seattle Shoreline Master Plan; - Environmental Critical Areas Ordinance (ECA); - Seattle Building Code;- ...
0.00219579833 |
a/60466
neighborhoodsanddevelopmenttab
; approval of permits for construction, mechanical systems, site development, elevators, electrical ...
0.00219579833 |
a/60495
oca_crime_prevention_review_09-05-2012
Auditor to work with George Mason University’s Center for Evidence-Based Crime Policy (CEBCP) to conduct a follow-up study that would ...
0.00219576317 |
a/127434
2012crimepreventionassessment
to work with George Mason University’s Center for Evidence-Based Crime Policy (CEBCP) to conduct a follow-up study that would include a ...
0.00219576317 |
a/167014
isrd082322blossomconplans
BUILDING ABOVE THE GRADE, AND 1-STORY STORAGE/ MECHANICAL SPACES BELOW THE GRADE. THE BUILDING WILL CONTAIN 184 RESIDENTIAL ...
0.00219574873 |
a/132635
isrd062822_blossom_cd
BUILDING ABOVE THE GRADE, AND 1-STORY STORAGE/ MECHANICAL SPACES BELOW THE GRADE. THE BUILDING WILL CONTAIN 184 RESIDENTIAL ...
0.00219574873 |
a/129865
2024-02-29 cpc dkt 792 city of seattle's ntc submitting use of ...
on formal periodic reviews, OIG has developed processes to provide real-time feedback to SPD regarding force investigation and review, as ...
0.002195723 |
a/153326