Filter Results

501 to 525 of 3737
seattle-sewer-os-2014
insured or to the extent guaranteed as permitted under any other provision of State law. Failure to Pay Bonds If the ...
0.00223436952 |
a/107402
2021sebcchapter8
the reconfiguration is exclusively the result of compliance with the accessibility require-ments of Section 306.7.1 shall be ...
0.00223424751 |
a/162627
energyplanningforasustainableneighborhood
were f ent le to eliminate or greatly reduce the impact on soil surrounding ble. if it so underwrite loan funding to pay for ...
0.00223401235 |
a/88149
landuseelement
to increased development potential.LU5.5 Seek opportunities to preserve active farms by employing mechanisms such as the ...
0.00223389571 |
a/87598
2021swmanualvol2constructionstormwatercontrolclean
and regulations, including the provisions of the: ● Federal Clean Water Act ● Federal Coastal Zone Management Act ● City of Seattle Phase I ...
0.00223374879 |
a/96985
sdci design review exemption ord
files a valid and complete building permit application electing the 26 exemption while this ordinance is in effect. 27 b. A ...
0.00223339861 |
a/161023
uptowndirectorsreport2017
in neighborhood affordability. Many of these buildings are constructed of unreinforced masonry which requires expensive retrofitting to be ...
0.00223335414 |
a/87888
2012secresidentialchapter4
between the slab and the basement wall at the interior of the basement wall. “10/15/21 + TB” shall be permitted to be met ...
0.00223316462 |
a/97478
cacresponsetodpdrecommendations
mechanical rooftop screening. To reduce traffic: 2. TMP Goal Prior to First Building Permit – Prior to ...
0.002233084 |
a/77370
draft battery language 03_ifc_2021
and maintenance of all structures and premises for precautions against fire and the spread of fire and general requirements of fire safety. ...
0.00223296555 |
a/154144
2021sfcchapter3
and premises for precautions against fire and the spread of fire and general requirements of fire safety. [W][S] 301.2 ...
0.00223296555 |
a/162464
seattle-go-2014-pos
, in sufficient quantities to permit such successful bidder to comply with Rule 15c2-12. By submitting the successful bid ...
0.00223289663 |
a/58525
seattle-go-2014-pos
, in sufficient quantities to permit such successful bidder to comply with Rule 15c2-12. By submitting the successful bid ...
0.00223289663 |
a/107392
03_ifc_2021
of fire safety. [W][S] 301.2 Permits. Permits shall be required as set forth in Section 105.5 for the ...
0.00223240233 |
a/139961
seattle-ltgo-utgo-os-2014
and Loan Insurance Corporation, to the extent insured or to the extent guaranteed as permitted under any other provision of ...
0.00223239 |
a/58544
seattle-ltgo-utgo-os-2014
and Loan Insurance Corporation, to the extent insured or to the extent guaranteed as permitted under any other provision of ...
0.00223239 |
a/107399
2018srcintro
, optical or mechanical means (by way of example, and not limitation, photocopying, or recording by or in an information ...
0.00223228033 |
a/97891
ch mimp_2022 annual report_updated 6.30.23
feet over the next 30 years. Swedish Cherry Hill will not be issued a Master Use Permit (MUP) to begin development until it ...
0.00223228033 |
a/144118
2021secreschapter1
the useful life of each building. This code is intended to provide flexibility to permit the use of innovative approaches ...
0.00223228033 |
a/162735
2012smcchapter6
2012smcchapter6 2012 SEATTLE MECHANICAL CODE77CHAPTER 6DUCT SYSTEMSSECTION 601GENERAL601.1 Scope. Duct systems used for the ...
0.00223222142 |
a/97235
chapte46effectsanalyses
Introduction to Effects Analysis The federal ESA requires that an applicant for an incidental take permit must “. . . to ...
0.00223222142 |
a/114736
2018smcchapter2
2018smcchapter2 2018 SEATTLE MECHANICAL CODE11CHAPTER 2DEFINITIONSUser note:About this chapter: Codes, by their very ...
0.00223204726 |
a/97274
seattle-go-2013-os-old
representative not later than seven business days after the City’s acceptance of such successful bidder’s bid, in sufficient quantities to ...
0.00223187846 |
a/58523
seattle-go-2013-os-old
representative not later than seven business days after the City’s acceptance of such successful bidder’s bid, in sufficient quantities to ...
0.00223187846 |
a/107390
2012sbcchapter15
construction. Regardlessof the requirements in Section 1509.6, mechanical equip-ment screens shall be ...
0.00223174412 |
a/97346