Filter Results

476 to 500 of 513
strategic plan main doc 25-27 final
with heat pump conversions. The analysis will focus on four URM building types representing the highest structural and socioeconomic ...
0.00217534 |
a/170635
parks
for a 7,000-square-foot community center and 8,000-square-foot gym as part of the International District Village Square Phase 2 (IDVS2) ...
0.00217534 |
a/60567
parks
Village Square Phase 2 (IDVS2) Project. Funding is to be provided to the Seattle Chinatown International District ...
0.00217534 |
a/60548
appendixbeis scopingengagementhubcomments
make the City so rich. When my grandparents moved here from Yokohama in the 60s, they were redlined near the Chinatown ...
0.00217534 |
a/135759
dpr
services by converting safes from dial combination locks to digital combination locks, and have existing staff do the work currently done by ...
0.00217534 |
a/62749
edcsummaryreportfinaljune2014
Sood – MicrosoftJill Nishi – Gates FoundationTayloe Washburn – Northeastern University SeattleRuben Ortega and Darcy ...
0.00217534 |
a/56305
entire_2007-2008_proposed_budget
Hill, and Columbia (2004); Greenwood, Fremont, Ballard, International District/Chinatown, and Lake City (2005); and ...
0.00217534 |
a/61082
finalserwave 4report
DescriptionOn September 7, 2020, nearly two hundred protestors gathered at the International District/Chinatown light rail ...
0.00217534 |
a/141196
2024_traffic_control_manual
. No work shall be scheduled on streets or sidewalks within the Chinatown-International District (CID) within the three ...
0.00217534 |
a/156193
entire_2007_adopted_&_2008_endorsed_budget
Seattle, Central, High Point, North East, Beacon Hill, and Columbia (2004); Greenwood, Fremont, Ballard, International ...
0.00217534 |
a/61058
parks
Square project. Funding is to be provided to the Seattle Chinatown International District Preservation and Development ...
0.00217534 |
a/60531
financial-statements-federal-single-audit-2017
. The LGIP does not impose liquidity fees or redemption gates on participant withdrawals. The Office of State Treasurer ...
0.00217534 |
a/58373
ada transition plan_ada
Chinatown Community Center – 719 8th Ave S: Built in 2004. An accessibility project was completed in 2012 which addressed ...
0.00217534 |
a/172311
2025-2027 citywide em strategic plan
structural and socioeconomic vulnerability in the Pioneer Square and Chinatown/InternaƟonal District neighborhoods of ...
0.00217534 |
a/175147
financial-audit-2012
, improvements to surface water system field equipment, and replacement of a sluice gate in the Windermere basin. The ...
0.00217534 |
a/58380
oed_jobs_plan_8-25-2011-final
galleries and studios in vacant spaces in Pioneer Square and the Chinatown/ID. The program has showcased more than two doze ...
0.00217534 |
a/56198
oneseattleplandeistransportation
key freight destinations as well as intermodal facilities where freight is transferred among rail, truck, and ship. The map also shows ...
0.00217534 |
a/153568
seattle industrial deis ch 3.10 2021_12
a substantial number of priority areas for improvements in the Greater Duwamish MIC. Locations including a large cluster in the ...
0.00217534 |
a/87146
publicspaceslifeintro
it is. The transit tunnel station in International District/Chinatown is easier to find. The entrances are located in a ...
0.00217534 |
a/96577
oneseattleplanfeis-chapter3.10-transportation
. The map also shows terminal and rail yard gate locations, the heavy haul network, and over-legal routes. Rail is also a ...
0.00217534 |
a/165713
lidi5economicfinancialfeasibilitymemorandum
, Management of Mobility Division, WSDOTScott Bonjukian, Lid I-5 Campaign Steering CommitteeScott Yasui, Board Member, Seattle ...
0.00217534 |
a/87190
lfs-economic-financial-feasibility-memorandum
, Management of Mobility Division, WSDOTScott Bonjukian, Lid I-5 Campaign Steering CommitteeScott Yasui, Board Member, Seattle ...
0.00217534 |
a/135023
stcfinallayout
, the Chinatown-International District, the Central Waterfront, two sports stadiums and the southern industrial areas ...
0.00217534 |
a/109276
lpbcurrentnom_blochhouse
line opened to serve visitors to the Alaska-Yukon-Pacific Exposition following an old wagon road along the edge of Capitol Hill on ...
0.00217534 |
a/146540
lpb101823blochhousenom
line opened to serve visitors to the Alaska-Yukon-Pacific Exposition following an old wagon road along the edge of Capitol Hill on ...
0.00217534 |
a/148336