Filter Results

401 to 425 of 3384
2012sbcchapter2
, International Fuel Gas Code,International Fire Code, International Mechanical Code,International Existing Building Code ...
0.00218351465 |
a/97351
decision20170501
% lot coverage, a portion of which is a 2-story building. (SMC 23.51B.002.C) 2. To allow greater than allowed building height (12’) for a ...
0.002183466 |
a/76830
psbminutes3-1-17
have been permitted. Examples of other departures in Pioneer Square: Courtyard Marriott Signage on the ...
0.002183466 |
a/73807
2012seattlefirechapter6
and maintenance of fuel-fired appli-ances and heating systems, emergency power systems andlegally required standby power systems, electrical ...
0.002183439 |
a/97603
2018seccommercialchapter1
. A permit for work performed according to this code shall be obtained in accordance with Chapter 1 of theInternational ...
0.00218303269 |
a/97519
ordinance - mha chinatownid implementation
to enact or expand affordable housing incentive programs providing for 19 the development of low-income housing units through development ...
0.00218297029 |
a/65078
2012sbcchapter34
Mechanical Code, International PlumbingCode, International Property Maintenance Code, Interna-tional Private Sewage ...
0.00218296517 |
a/97367
draftpermitpositionpaper010511v2
requirements it is essential to understand the goals and why a permit system is an appropriate mechanism ...
0.0021827512 |
a/117990
seattle-solid-waste-2011-os
or to the extent guaranteed as permitted under any other provision of State law. After the establishing and full funding ...
0.00218272675 |
a/107405
2012srcchapter29
diameters, shall be permitted to bemade with the use of approved push-in mechanical fittings ofa ...
0.002182589 |
a/97804
lhes sdci decision-recommendation
SEPA Related Actions Prior to application for a Master Use Permit, the District exercised its prerogative to act as lead ...
0.00218253233 |
a/76820
2018sbcchapter12
. Ventilation, lighting,and space heating are directly regulated in this chapter and in conjunction with the International ...
0.002182449 |
a/97424
50_ifc_2021
to Section 105.6.8, the fire code official approves permits to install underground tanks issued by and inspections of ...
0.00218241778 |
a/139034
ch mimp_2023 annual report_final resubmission
will not be issued a Master Use Permit (MUP) to begin development until it is able to meet its current Transportation ...
0.00218237448 |
a/163966
cacfinalreportandrecommendations-2012-04-17
to submission of their respective Master Use Permit applications. Any proposal for a new structure greater than 4000 square ...
0.00218232442 |
a/77254
23_ifc_2021
shall be permitted in lieu of mechanical exhaust ventilation. Blue 2021 IFC New Language, Green 2021 WA ...
0.00218228134 |
a/133263
2021sfcchapter23
approved by the fire code official, natural ventilation shall be permitted in lieu of mechanical exhaust ...
0.00218228134 |
a/162462
10ic(scada)finalredacted
- I&C Design Specifications Examples. 10.2.2.2 Drawings I&C drawings must be consistent with and reference other related discipline ...
0.00218224386 |
a/113579
10ic(scada)final03012017
.  Drawings ...
0.00218224386 |
a/113578
020211adoptedmeetingsummary
on the site. DPD has a conflict of interest between development and trees. The proposed permit system at this point in ...
0.00218220474 |
a/118039
criticalareasassistancehandbook
and restricting, allowing, or conditioning other activities as appropriate. In determining how to develop those regulations, jurisdictions ...
0.00218220474 |
a/96779
seattlecentersigndistrictordinance
View Group addressing actions, 17 permits, approvals, and agreements necessary to accomplish the design, development, 18 ...
0.00218211138 |
a/96606
majorinstitutionminorhousingordd10
established Major Institution Master Plans as a mechanism regulating 14 major institutions’ long-term growth plans for ...
0.002181963 |
a/76978
annual report 2018 -- 5-2-19 - final
that will increase the hospital’s square footage up to 2,753,000 square feet over the next 30 years. Swedish Cherry Hill will not be issued ...
0.00218170369 |
a/77363
cherry hill mimp_2023 annual report_final
over the next 30 years. Swedish Cherry Hill will not be issued a Master Use Permit (MUP) to begin development until it is ...
0.00218170369 |
a/163233