Filter Results

3351 to 3375 of 3384
06-28-01
. Sandy stated the building functions as public open space for the community. She hopes there is some sort of mechanism for ...
0.002142034 |
a/91897
2018 3-8 bpc minutes approved
cost increases. There are a couple of holes at Jefferson we redesigned that made the course less fun to play. SPR is working to change the ...
0.002142034 |
a/92192
05-13-04_minutes
posting were removed from the cedar poles by the Conservation Corps. Signs were added to notify the public that postings are not ...
0.002142034 |
a/91958
08-26-04_minutes
Paging (delete as it is out-of-date and not necessary) 5. 2.8.2 Administrative Office Equipment (combine with 2.8.3) 6. 2.8.4 Disposition ...
0.002142034 |
a/91964
2016 6-23 bpc minutes approved
and a conservation lab. Renovate and enhance mechanical and electrical systems. There will be offices and a meeting area ...
0.002142034 |
a/92154
03-10-11
responded that upwards of 200,000 people are expected. No onsite parking will be permitted inside Myrtle Edwards Park. If ...
0.002142034 |
a/92098
2015 06-25 bpc minutes approved
forward. Cheasty has not been a pleasant process and SPR staff realized they needed to develop a mechanism to make the ...
0.002142034 |
a/92142
te blueprint - final - march 2021
, we will do the following in the next 2 years:• Explore equitable road pricing as a funding mechanism to increase zero ...
0.002142034 |
a/90409
final transportation electrification blueprint
:• Explore equitable road pricing as a funding mechanism to increase zero emission trips taken.• Update the City’s ...
0.002142034 |
a/90404
final transportation electrification blueprint
:• Explore equitable road pricing as a funding mechanism to increase zero emission trips taken.• Update the City’s ...
0.002142034 |
a/90393
te blueprint - march 2021
:• Explore equitable road pricing as a funding mechanism to increase zero emission trips taken.• Update the City’s ...
0.002142034 |
a/90410
appendix_d_madison_air_quality_dr
are a type of bus lane located on the curbside and permit general traffic use for accessing driveways or crossing streets ...
0.002142034 |
a/106131
video recording systems wg sir
Assessment | Surveillance Impact Report | Video Recording Systems | page 13 4.10 What safeguards are in place, for protecting data from ...
0.002142034 |
a/117382
presentation042518
current education approaches & technologyLife Safety & Accessibility improvementsBuilding envelope & energy improvementsNew ...
0.002142034 |
a/76719
dadu_submission067
to be Labor and Industries (L&I) inspected and then craned in if desired/available. Estimate of Construction Cost: This unit has a ...
0.002142034 |
a/86862
2013_ohlevyreport
funding to allow for completion of financing, design, permitting, and construction. Whenever possible, federal operating ...
0.002142034 |
a/158523
2018_1_26-report-squarefeet2017
to finance their portion, Odessa Brown Children’s Clinic is also working on financing their portion, I guess basically we all are looking to ...
0.002142034 |
a/49631
lowmanbeach_bod_report_feb2020
Noble conducted archaeological and geotechnical and field investigations consisting of three mechanical test pits between ...
0.002142034 |
a/93357
sfab_mtg_minutes_20200218
to the SFAB to discuss where parking should be, how mechanics of use will work; currently discussed space may not be ...
0.002142034 |
a/101833
2025_resale_restricted_homes_nofa_application
affect the timing of this project, including current status of architectural plans, permits, availability of other public ...
0.002142034 |
a/167652
sfab_mtg_minutes_20200218_draft
Improvement. Will be brought to the SFAB to discuss where parking should be, how mechanics of use will work; currently ...
0.002142034 |
a/101834
sfab_mtg_minutes_20190521_newdraft
Improvement. Will be brought to the SFAB to discuss where parking should be, how mechanics of use will work; currently ...
0.002142034 |
a/101820
2014annualreportfinancials
amount permitted by the Internal Revenue Code as a reasonably required reserve or replacement fund (Reserve Requirement). ...
0.002142034 |
a/50668
seattledesigncommission-2007.12.06firestation39minutes
mechanical portions not shown? o The additional parapet will not be visible from the street. o What is the color or ...
0.002142034 |
a/85414
scc_conceptplan_mimp
of Pine Street.• Plan for new construction projects, to the greatest extent possible, to be developed via the SBCTC funding ...
0.002142034 |
a/77039