Filter Results

3276 to 3300 of 3384
scl
810,741,087 443310 Out of System Sales 0 0 0 0 443310 Retail Energy Revenue from Current Diversion, Un-Permitted House ...
0.002142034 |
a/62683
dnsdrainagesystemfacilities-041119
, and East John Detention Pipe. For each facility, SPU would determine the specific work to be performed and the timing of the work, ...
0.002142034 |
a/112847
drainage_system_facilities_2019_dns
, and East John Detention Pipe. For each facility, SPU would determine the specific work to be performed and the timing of the work, ...
0.002142034 |
a/112876
dns drainage system facilities 041119
Tank, and East John Detention Pipe. For each facility, SPU would determine the specific work to be performed and the timing of the work, ...
0.002142034 |
a/145954
dns-drainagesystemfacilities-041119
, and East John Detention Pipe. For each facility, SPU would determine the specific work to be performed and the timing of the work, ...
0.002142034 |
a/112835
flir - kcso helicopters public_engagement sir
(encryption, access control mechanisms, etc.) And to provide an audit trail (viewer logging, modification logging, etc.)? ...
0.002142034 |
a/117312
2014-04-23_tsunamiandseiches
bodies of water usually have longer frequencies, it takes longer frequency waves traveling through the ground to create seiches in them. Due ...
0.002142034 |
a/57142
2019 legislative bulletin - week 4
efficiency and renewable energy measures. Permits a city, town, or county to adopt additional residential energy code ...
0.002142034 |
a/80030
2019 legislative bulletin - week 4
efficiency and renewable energy measures. Permits a city, town, or county to adopt additional residential energy code ...
0.002142034 |
a/79806
scl
. The proposed budget provides ongoing funding for this work. With this funding, City Light expects to reduce the backlog of applications ...
0.002142034 |
a/63057
spu techproj_2530adoptedcip
:Not in an Urban VillageThis ongoing project provides for electronic and mechanical system upgrades as required at various ...
0.002142034 |
a/166651
scl
currently permit. By doing this, City Light will more effectively integrate renewable energy across the West due to its ...
0.002142034 |
a/62866
dadu_submission068
a guaranteed price to the consumer that include permitting, foundation, installation/construction, and utility hook-ups ...
0.002142034 |
a/86863
seattle fcc study - strategy options brief_01-24-19
through the process) and grants. They also help businesses maneuver through City processes (permitting and licensing) and ...
0.002142034 |
a/55433
2019 legislative bulletin - week 3
tax credit against the taxes owing by utilities for the incentives provided for the implementation by eligible building owners of energy ...
0.002142034 |
a/79805
2019 legislative bulletin - week 3
tax credit against the taxes owing by utilities for the incentives provided for the implementation by eligible building owners of energy ...
0.002142034 |
a/80029
seattledesigncommission-2008.12.04southeastseattletransportations ...
. Foot Ferry The cable foot ferry is a very basic mechanical system. When the cable spool motor is activated, the ferry is ...
0.002142034 |
a/85460
spr_2530proposedcip
of the building for increased programming options. Work on Building #47 will include new mechanical, electrical, and ...
0.002142034 |
a/160789
seattledesigncommission-2006.11.02mercercorridorminutes
mechanism for this project would be ProParks, 2000 parks levy, federal enhancement grants, and some local matching funds. ...
0.002142034 |
a/85390
fg_2324adopted_mid-biennium
fg_2324adopted_mid-biennium Finance General Julie Dingley, Director (206) 615-1962 ...
0.002142034 |
a/153240
15physicalsecurityfinalredacted
) Schedule 80. • All boxes must be heavy cast; pot metal boxes are not permitted. • Substitutions must be submitted to and ...
0.002142034 |
a/154316
cityofseattlelegislativebulletinweek7
5994 - Establishing a new permitting process on transportation projects. Passed 30-19.  SB 5995 - Adding “congestion ...
0.002142034 |
a/79980
2014-04-03_wct_existingconditionsdesigncriteria_memo
reports that containers over 8 cubic yards use front loading trucks, which require maneuvering and backing up to mechanically
0.002142034 |
a/100698
2008finalstatreport
. In several cases, while investigating other allegations underlying a complaint, OPA discovered problems related to the Secondary ...
0.002142034 |
a/80705
loyalheightses_agreement
, or alteration of ducts, conduits, HVAC vents, grills, pipes, panels, weatherheads, wiring, meters, utility connections, downspouts and ...
0.002142034 |
a/75315