Filter Results

2826 to 2850 of 3384
iopeguide01-11-12
are the reporting mechanisms? Identify products that document and report on the outcomes of the public involvement. ...
0.00214489433 |
a/96086
transportation
in the first quarter of 2013. This phase includes structural and seismic upgrades of the station and clock tower, major ...
0.00214489433 |
a/61914
auditorreportjanjune2013
to ensure the officer not be permitted to be employed by any other police agency in the state.8 Both of those ...
0.00214489433 |
a/80730
2017financialstatement
, the aggregate Reserve Fund Requirement for all Parity Bonds is equal to the sum of the Reserve Fund Requirements established for each ...
0.00214489433 |
a/50693
spucap4
: The degree to which a project is driven by federal, state, and local laws, permit and regulatory requirements, and ...
0.00214489433 |
a/62388
seattledesigncommission-2005.07.07broadviewlibraryexpansionminute ...
. The building structure and interior should be updated, it is under-insulated and needs an envelope redo, and the ...
0.00214489433 |
a/85363
seattle-light-2013
Council passed ordinances to establish, set parameters and provide a funding mechanism for a Rate stabilization account ...
0.00214489433 |
a/107393
seattlepublicutilities-water
, Legal Agreements: The degree to which a project is driven byfederal, state, and local laws, permit and regulatory ...
0.00214489433 |
a/62358
encampment-monitoring-report-2017
recommended that a mechanism be put into place to ensure greater communication and transparency in the process as well as ...
0.00214489433 |
a/67085
encampment monitoring report 2017 and response
. We recommended that a mechanism be put into place to ensure greater communication and transparency in the process as well ...
0.00214489433 |
a/51753
2016seattleparkdistrictreport
. Currently at 60% construction documents. Project will be bid in 2017 and constructed in 2018. Complexities with ...
0.00214489433 |
a/90841
2016seattleparkdistrictreport
. Currently at 60% construction documents. Project will be bid in 2017 and constructed in 2018. Complexities with ...
0.00214489433 |
a/92351
2007scers-annual report
) was equal to the Annual Required Contributions (ARC) and the Net Pension Obligation (NPO) was zero. The City Ordinance does not ...
0.00214489433 |
a/95743
iope guide 01-11-12
are the reporting mechanisms? Identify products that document and report on the outcomes of the public involvement. ...
0.00214489433 |
a/95930
ne_surveyresults
, and cause backupsbecause there is no parking all the streets are single lane and it just STOPS. Parking permits are sadly ...
0.00214489433 |
a/102620
edi-etod-strategyfacilitation-rfp
and deliver self-determination through community led and owned development. An Equitable TOD Strategy and Implementation Plan is actionable ...
0.00214489433 |
a/153068
seattledesigncommission-2005.06.02firestation10minutes
of the mechanical louvers along South Washington, perhaps considering a brick screen instead of a metal louver; · ...
0.00214489433 |
a/85361
climate indicators listening sessions - final report w-appendix ...
believe over 40 percent of CO2 global omissions are generated from buildings. The larger thebuilding, the more likely it is to have ...
0.00214489433 |
a/136273
icv_review_12232011
there are any circumstances permitting an officer to turn off the audio during a police event. 9. There are not clear ...
0.00214489433 |
a/84038
2019 legislative bulletin - week 5
for the implementation by eligible building owners of energy efficiency and renewable energy measures. Permits a city, ...
0.00214489433 |
a/80031
2019 legislative bulletin - week 5
for the implementation by eligible building owners of energy efficiency and renewable energy measures. Permits a city, ...
0.00214489433 |
a/79807
ose_btu_fact_sheet_101117
EXTENSIONS AND WAIVERS AVAILABLEUnder limited circumstances building owners can apply for a one year extension, including a change of ...
0.00214489433 |
a/88458
ose_btu_fact_sheet_101117
EXTENSIONS AND WAIVERS AVAILABLEUnder limited circumstances building owners can apply for a one year extension, including a change of ...
0.00214489433 |
a/57444
oneseattleplanantidisplacementframeworkappendix
and in current and future station areas. PROTECT TENANTS H 5.3 Require advance notice to all tenants and payment of relocation assistance to ...
0.00214489433 |
a/154389
jac-meeting-notes-2021
of 18 months complete. Current work includes mechanical rough-in. There are no workforce needs and no safety issues. ...
0.00214489433 |
a/58813