Filter Results

2801 to 2825 of 3384
lpb3-3-21
that structural, mechanical, and electrical elements on the existing station are at the end of their useful lives and are ...
0.00214489433 |
a/74659
capitolhilludfworkshop1background
and/or apartments to forty feet are permitted outright. Previous Work by Stakeholders The Broadway Economic Vitality ...
0.00214489433 |
a/86500
seattle-light-and-power-2012-audited-financial-statements
DECEMBER 31, 2012 AND 2011 - 27 - 3. RATE STABILIZATION ACCOUNT The Seattle City Council passed ordinances to establish, set parameters and ...
0.00214489433 |
a/107396
desrpt_woodin
a full, unfinished basement (1,130 square feet) that is accessed from the kitchen and also via a rear exterior entry at the southwest ...
0.00214489433 |
a/163374
seattledesigncommission-2011.08.04bartonpumpstationminutes
, Suite 2000 PO Box 34019 Seattle, WA 98124-4019 TEL 206-615-1349 FAX 206-233-7883 Page 2 of 7 August 4, 2011 Project: Barton ...
0.00214489433 |
a/85643
cswg comments on group 1 camera technologies final 042319
(October 2018) Surveillance Impact Report (SIR) for this technology stated that no explicit internal policy exists at SFD that governs the ...
0.00214489433 |
a/117306
parks_detail
Capital Improvement Program-94-Parks & RecreationStart Date:End Date:This project includes upgrades to the Armory’s building systems such as ...
0.00214489433 |
a/61519
seattledesigncommission-2008.06.19myrtlereservoirparkminutes
of livable materials and its important priority of increasing biomass for its inherent benefits. • Hope that the Green Factor as applied to ...
0.00214489433 |
a/85442
091913newtapspublishedrpt
permits, is responsible for drainage billing, and administers the sewer sub-meter program. They manage key customer ...
0.00214489433 |
a/50552
parks_projects
Improvement Program-96-Parks & RecreationStart Date:End Date:This project includes upgrades to the Armory’s building systems such as HVAC, ...
0.00214489433 |
a/61455
dpr_projects
, piping, electrical, mechanical systems, and other related elements. Seismic improvements and upgrades to the roofing ...
0.00214489433 |
a/61628
spu cc flashcam 2022 privacy impact assessment_final
examiner. 4.10 What safeguards are in place, for protecting data from unauthorized access (encryption, access control ...
0.00214489433 |
a/152998
seattledesigncommission-2008.06.191200stewartminutes
materials and its important priority of increasing biomass for its inherent benefits. • Hope that the Green Factor as applied to multifamily ...
0.00214489433 |
a/85440
general_govt_06-11
is planned because Fire Station 02 offers ample room for multiple apparatus bays and would permit Fire Station 25 the ...
0.00214489433 |
a/60951
edi-etod-remnantparcels-rfp
and Implementation Plan is actionable and may include identifying opportunity sites and funding mechanisms for key ...
0.00214489433 |
a/153069
electioncampaigncontributionssmc2-04_01-17-2020
, for public inspection. (Ord. 123070, § 18, 2009; Ord. 106653 , § 24, 1977.) 2.04.330 Late filing—Civil assessments A. The City Clerk ...
0.00214489433 |
a/135789
cam5965_knoxbox
cam5965_knoxbox CAM 5965 Client Assistance Memo Seattle Fire Department Seattle Permits City of Seattle Fire Prevention ...
0.00214489433 |
a/64151
fas-pc-contracting-emergency-red-package-boilerplate
) • @@Technical Specifications (if applicable) • @@Drawings (if applicable) • @@Surveys (if applicable) • @@Existing Conditions (if ...
0.00214489433 |
a/139390
inclusive-outreach-and-public-engagement-guide-2012-update
for the project. Key Dates: 14. What are the reporting mechanisms? Identify products that document and ...
0.00214489433 |
a/152526
solid_waste_storage_access_checklist
in the public right-of-way – alleys, streets, orplanting strips.1.APPLICANT INFORMATIONa.Nameb.Emailc.Phone numberd.Date _________2.PROJECT ...
0.00214489433 |
a/113883
130thcompplanfeisaddendum
as part of the City’s permitting and development review processes. As part of our cumulative impacts assessment, we ...
0.00214489433 |
a/87385
cost-of-green-survey-july2011
Low VOC paint x Operable windows (required by code) x Low flow showers & faucets x Limited mechanical systems x No ...
0.00214489433 |
a/88277
parks
of dollars.2009-2014 Proposed Capital Improvement Program-94-Parks & RecreationStart Date:End Date:This project includes upgrades to the ...
0.00214489433 |
a/61518
seattle_music_eis_2008
of the differences between the studies. Furthermore, changes in the availability and accuracy of certain data sources ...
0.00214489433 |
a/63965
seattle_music_eis_2008
of the differences between the studies. Furthermore, changes in the availability and accuracy of certain data sources ...
0.00214489433 |
a/59984