Filter Results

2651 to 2675 of 2775
magnuson park study rfp packet
uses are listed as permitted in the Overlay District, an NPS deed covenant only allows “Parks & Recreation uses” within ...
0.00205060467 |
a/142564
introduction
Programs to meet federal and state regulatory requirements. The City of Seattle must abide by the City's two National Pollutant Discharge ...
0.00205060467 |
a/62184
introduction
Pollutant Discharge Elimination System (NPDES) permits, one for stormwater and one for combined sewer system. The City is ...
0.00205060467 |
a/61921
3039304-sd decision
No. 3039304-SD Previous SEPA Related Actions Prior to application for a Public School Departure Permit, the District ...
0.00205060467 |
a/142816
introduction
Programs to meet federal and state regulatory requirements. The City of Seattle must abide by the City's two National Pollutant Discharge ...
0.00205060467 |
a/61909
seattledesigncommission-2005.06.16interurbanexchangeivampvalleyva ...
the funding is for the public benefits package and does it include everything proposed o The public benefits are tied to the master use ...
0.00205060467 |
a/85362
cost-of-green-survey-july2011
device or attached garageÌ1-7Ì5 Star: Install CO detector for all units (hardwired required) with a combustion deviceÌ1-8ÌProhibit burying ...
0.00205060467 |
a/88277
introduction
. The City of Seattle must abide by the City's two National Pollutant Discharge Elimination System (NPDES) permits, one ...
0.00205060467 |
a/61989
4185_preliminary_report_9082014
on the property would be compatible with Chef ‘n’s use. Daniel Bretzke September 8 2014, Page 3 of 11 Any development of the ...
0.00205060467 |
a/59338
spu_water_projects
to be built on schedule. The project is part of SDOT's Bridging the Gap program and needs to be completed prior to ...
0.00205060467 |
a/61731
seattledesigncommission-2004.03.04woodlandparkzoodiscoveryvillage ...
to add an educational component to the building that explains the history of the primate building on the site, and how the ...
0.00205060467 |
a/85334
fascap
, failing bulkhead at the Harbor Patrol Building. Design is funded in 2014 and permitting and construction will be ...
0.00205060467 |
a/62158
4186-preliminaryreport11102017
to be heard by the Seattle Design Commission during the Master Use Permit (MUP) process to ensure that the proposed 8th Ave ...
0.00205060467 |
a/59345
4185-revised-preliminary-report
some of the condominium units. Expansion of Chef’n on the property would be compatible with Chef ‘n’s use. Any development of the property ...
0.00205060467 |
a/59333
seattledesigncommission-2017.01.05portagebayparkminutes
team continues to develop refinements for park programming. SPR and the design team will hold four public meetings throughout the design ...
0.00205060467 |
a/85081
light_projects
in the 1970's and 1980 are reviewed, updated, and evaluated as a first phase. This first phase study includes review of construction costs, ...
0.00205060467 |
a/61264
1introduction
of Seattle must abide by the City's two National Pollutant Discharge Elimination System (NPDES) permits, one for storm ...
0.00205060467 |
a/61968
seattledesigncommission-2016.03.17portagebayparkminutes
of the project. The park will start permitting, bidding, and construction in mid-2016 and is planned to open in late 2018. ...
0.00205060467 |
a/85077
light_projects
costs, permit and public review processes, and timetables.1st Quarter 20111st Quarter 2011BCL/Program Name:Power Supply and ...
0.00205060467 |
a/61322
introductioncap
in their Capital Improvement Programs to meet federal and state regulatory requirements. The City of Seattle must abide by the City's two ...
0.00205060467 |
a/62162
2021 update.annexiv.esf03.signed
buildings (tagging and retagging) utilizing City staff and qualified & certified volunteers • Permits – ...
0.00205060467 |
a/57045
seattle_city_light
includes review of construction costs, permit and public review processes, and timetables.1st Quarter 20111st Quarter ...
0.00205060467 |
a/61268
seattle_city_light
, updated, and evaluated as a first phase. This first phase study includes review of construction costs, permit and public ...
0.00205060467 |
a/61326
planning101digital11x17(0)
has a set of municipal codes, including land use codes that establish health and safety requirements (fire code, building and construction ...
0.00205060467 |
a/108055
aug2016app
OVERHEAD HAZARDS FLYING OBJECTS VISIBILITY OTHER: FEET WORK ACTIVITIES: BUILDING MAINTENANCE CONSTRUCTION ...
0.00205060467 |
a/104398