2376 to 2400 of 2708
haggett hall demolitiona and replacment_cucac_2024.03.12
ScheduleProject Definition Apr 2023 – Jul 2023Design and Permitting Aug 2023 – Nov 2025Abatement Start Nov 2023 ...
0.009822597 |
a/153736
route40_presentation_fremont_neighborhood_council_final
, and vibration during street demolition and excavation▪Properties with planned water service interruptions will be ...
0.009822597 |
a/151926
citywide 2024 wmbe plans
their business. We’ve also established the commercial space permit coaching and expedition, in partnership with Seattle ...
0.009822597 |
a/160679
children's sac 052416 presentation
demolition of structures containing residential uses which are not Major Institution uses shall be prohibited if the ...
0.009822597 |
a/77085
cos-bim-standards
:•Authoritative survey drawings:…\C-Civil\02-Survey\D-XREF•Authoritative design drawings:…\C-Civil\03-DesignIt is permitted ...
0.009822597 |
a/139344
presentation043018
departure which may be allowed for each development standard from which a departure has been requested. Minority reports shall be ...
0.009822597 |
a/77934
treeprotectionconstructiondevelopmentsites
of decay.To protect trees and tree roots within the fenced CRZ, do not do the following:• Stockpile construction materials or ...
0.009822597 |
a/96646
lpbcurrentnom_bucca_de_beppo _ ducati
uses, with no new residential buildings permitted. In the post World War II era automobile related facilities began to ...
0.009822597 |
a/74437
upcoming_opportunitiesv.18
alternative and associated costs. Regarding the recommended alternative, this study should identify the: essential functional needs, ...
0.009822597 |
a/99786
seattlerecreationdemandstudy2016
shoreline access Access to the water’s edge that includes at least 40 linear feet of shoreline and is either publicly owned or dedicated by ...
0.009822597 |
a/92570
upcoming_opportunitiesv.13
alternative and associated costs. Regarding the recommended alternative, this study should identify the: essential functional needs, ...
0.009822597 |
a/99781
upcoming_opportunitiesv.17
alternative and associated costs. Regarding the recommended alternative, this study should identify the: essential functional needs, ...
0.009822597 |
a/99785
upcoming_opps_2019_3.5(0)
functional needs, right-of-way needs, types of environmental permitting required, and ways to minimize impact to the ...
0.009822597 |
a/99805
upcoming_opportunitiesv.15
functional needs, right-of-way needs, types of environmental permitting required, and ways to minimize impact to the ...
0.009822597 |
a/99783
upcoming_opportunitiesv.16
replacement alternative and associated costs. Regarding the recommended alternative, this study should identify the: essential functional ...
0.009822597 |
a/99784
upcoming_opportunitiesv.11
identify the: essential functional needs, right-of-way needs, types of environmental permitting required, and ways to ...
0.009822597 |
a/99779
upcoming_opportunitiesv.12
and associated costs. Regarding the recommended alternative, this study should identify the: essential functional needs, right-of-way needs, ...
0.009822597 |
a/99780
upcoming_opportunitiesv.20
the recommended alternative, this study should identify the: essential functional needs, right-of-way needs, types of environmental ...
0.009822597 |
a/99788
upcoming_opps_2019_3.5
, types of environmental permitting required, and ways to minimize impact to the navigable channel and 15th Ave W corridor ...
0.009822597 |
a/99806
upcoming_opportunitiesv.14
and associated costs. Regarding the recommended alternative, this study should identify the: essential functional needs, right-of-way needs, ...
0.009822597 |
a/99782
upcoming_opportunitiesv.19
identify the: essential functional needs, right-of-way needs, types of environmental permitting required, and ways to ...
0.009822597 |
a/99787
upcoming_opportunitiesv.21
and associated costs. Regarding the recommended alternative, this study should identify the: essential functional needs, right-of-way needs, ...
0.009822597 |
a/99789
upcoming_opportunitiesv.6
City Light]$4MQ4 2017Barbara Lee(206) 615‐1696Advanced utility work related to the Waterfront Main Corridor project that will rebuild Alaska ...
0.009822597 |
a/99792
upcoming_opportunitiesv.10
the recommended alternative, this study should identify the: essential functional needs, right-of-way needs, types of environmental ...
0.009822597 |
a/99778
2020annual_report_1221_2020_final
construction progress throughout 2020, including demolition, construction and deconstruction of a temporary trestle, and ...
0.009822597 |
a/99548