Filter Results

2351 to 2375 of 2647
upcoming_opps_2019_3.5
, types of environmental permitting required, and ways to minimize impact to the navigable channel and 15th Ave W corridor ...
0.00215586927 |
a/99806
upcoming_opportunitiesv.14
and associated costs. Regarding the recommended alternative, this study should identify the: essential functional needs, right-of-way needs, ...
0.00215586927 |
a/99782
upcoming_opportunitiesv.19
identify the: essential functional needs, right-of-way needs, types of environmental permitting required, and ways to ...
0.00215586927 |
a/99787
upcoming_opportunitiesv.21
and associated costs. Regarding the recommended alternative, this study should identify the: essential functional needs, right-of-way needs, ...
0.00215586927 |
a/99789
upcoming_opportunitiesv.6
City Light]$4MQ4 2017Barbara Lee(206) 615‐1696Advanced utility work related to the Waterfront Main Corridor project that will rebuild Alaska ...
0.00215586927 |
a/99792
upcoming_opportunitiesv.10
the recommended alternative, this study should identify the: essential functional needs, right-of-way needs, types of environmental ...
0.00215586927 |
a/99778
2020annual_report_1221_2020_final
construction progress throughout 2020, including demolition, construction and deconstruction of a temporary trestle, and ...
0.00215586927 |
a/99548
growth and livability report
on the source of their income ■Streamlining City permit processesThe implementation of HALA recommendations is also closely ...
0.00215586927 |
a/86167
psb080724600alaskapp
at each end of this area are required egress stairs for occupants of the building to reach the public way. The three installed stairs are ...
0.00215586927 |
a/158975
geotechnical-evaluation-groundwater-18th-cherry-street-medical-of ...
to permit proper completion of the work. Perched groundwater was encountered in relatively thin layers of soil within ...
0.00215586927 |
a/77400
seattle tdm programs 5 year strategic plan_final[33]
acknowledge that racism has shaped the urban environment through land use and transportation policies (e.g., redlining, housing ...
0.00215586927 |
a/163901
northgatees_departurespresentation_200612
will be constructed on the south-ern end of the site following the demolition of the existing building. >Occupied ...
0.00215586927 |
a/76847
1032_briefing_feb22
StoriesAsian Plaza - Retail/RestaurantMasonry ConstructionAll elements within the highlighted boundary are proposed for ...
0.00215586927 |
a/73287
seattle_cctmp04draftfullreport
by the Cheonggye Road and Cheonggye Elevated Highway, or Cheonggye Expressway. Prior to demolition, combined traffic counts ...
0.00215586927 |
a/99458
draft structure for stability apr 22 draft
, photographerSTRUCTURE FOR STABILITY8IntroductionIn Seattle, commercially-zoned blocks with a cultural space on them are twice as likely to ...
0.00215586927 |
a/49559
lpb050625_3704 s. ferdinand_pp
, major durablesProposed Use: Table A for 23.47A.004E.5 Institutions - Child care center (I-4)Use Permitted per Table A ...
0.00215586927 |
a/168347
seattledesigncommission-2017.02.02onecentercitypresentation
demolition*•Alaskan Way construction begins*•Convention Center open•Center City Connector open•Alaskan Way open to ...
0.00215586927 |
a/85059
metro_rr_presentation_jan_2021
seeks Pioneer Square Preservation Board approval for the installation of three new RapidRide Stations on Alaskan Way. Background - New ...
0.00215586927 |
a/74177
sandpoint-appendix-b
hangars. Doors are staggered relative to one-another to permit sliding. Smaller personnel doors set within these hangar ...
0.00215586927 |
a/74275
davido_consulting_report
of soft costs (permitting/design/other) and includes separate operationsand maintenance costs. Costs were derived from ...
0.00215586927 |
a/150971
lpbcurrentnom_1914-1920_eastlakeavee
), through a 1995 agreement with the Department of Neighborhoods, requires a review of “potentially eligible landmarks” for commercial ...
0.00215586927 |
a/74403
lpb040225memorialwallbp
Guy Gallipeau led a demonstration to City Hall to oppose the demolition of the War Memorial Wall. The city and school board ...
0.00215586927 |
a/167366
jensen_set
, ICC A117.1-2009BUILDING OCCUPANCY BY USE: B AND R-2CONSTRUCTION TYPE: V-A FIRE SPRINKLER: FULLY SPRINKLERED PER 1997 BUILDING ...
0.00215586927 |
a/75292
kimballdeparturesfinal
to the EXISTING building and would be damaged during demolition- 13 trees proposed for removal because they are ...
0.00215586927 |
a/76805
mhc121422fairmountpp
of the Historic Commission. • Hazardous materials testing will be required prior to any work performed, this would be lead based paint and ...
0.00215586927 |
a/136553