Filter Results

2251 to 2275 of 2775
neighborhoodplanningelement2015replacementpages
features. Incentives. Provisions for allowing floor area above the base should not create incentives for the demolition of ...
0.00205504661 |
a/87609
teche
to minimize the construction duration at any given location. Construction of any of the Build Alternatives would consist of the following ...
0.00205504661 |
a/100525
2022solidwastedraftch1
residents and workers. Construction and demolition projects in Seattle generated another 560,000 tons (1.12 billion pounds) ...
0.00205504661 |
a/126506
executivesummary(0)
moving on to the next segment to minimize the construction duration at any given location. Construction of any of the Build Alternatives ...
0.00205504661 |
a/100506
lpb062624firestation6pp
of the current permit application has identifi ed four conditions that require compliance with the Seattle Energy Code ...
0.00205504661 |
a/157543
lpb061424firestation6pp
of the current permit application has identifi ed four conditions that require compliance with the Seattle Energy Code ...
0.00205504661 |
a/157146
2022solidwastedraftch6
............................................................................................................. 6.20 Table 6.7 City-Owned ...
0.00205504661 |
a/126530
lpbcurrentnom_frederickboyd
of “potentially eligible landmarks” for commercial projects over 4,000 square feet in area. As any proposed alterations or ...
0.00205504661 |
a/74472
spcgsdigital01062020
consequences as well. We continue to see stark racial inequities in homeownership, employment, and health outcomes throughout the city.4 ...
0.00205504661 |
a/108091
2012sebcintro
failures have resulted during the ini-tial stages of grading, excavation and demolition. During these early stages, poorly ...
0.00205504661 |
a/97125
spc growth strategy white paper 1072020(0)
, there are negative consequences as well. We continue to see stark racial inequities in homeownership, employment, and health outcomes ...
0.00205504661 |
a/108073
spcgrowthstrategyfinal1072020
, there are negative consequences as well. We continue to see stark racial inequities in homeownership, employment, and health outcomes ...
0.00205504661 |
a/108090
spc growth strategy white paper 1072020
, there are negative consequences as well. We continue to see stark racial inequities in homeownership, employment, and health outcomes ...
0.00205504661 |
a/108074
seattletimes-building-complex-1947-office-building
eligible landmarks” for commercial projects over 4,000 square feet in area. As any proposed demolition of the subject ...
0.00205504661 |
a/74590
2019_0311 seattle amihac meeting #2
Elasticity of Supply(% change in price)(% change in supply)How are Middle Income Households Served in the Housing Market?9Filtering, ...
0.00205504661 |
a/72100
techb
on to the next segment to minimize the construction duration at any given location. Construction of any of the Build Alternatives would ...
0.00205504661 |
a/100522
metropole
of the Metropole building is an important opportunity to preserve, restore, and return to use this significant historic building which is ...
0.00205504661 |
a/74174
090929
permit was received. The Planning, Land Use, and Neighborhoods Committee reviewed the development waivers, with the full ...
0.002053118 |
a/64600
100323
with Weinstein A/U. The Master Use Permit (MUP) application is underway. The Design Commission approved the schematic ...
0.002053118 |
a/64602
phase1summaryofchangestoproposedamendments
. Original proposal. The draft proposal was to limit the size of a lot permitted for new development to a maximum of ...
0.002053118 |
a/87321
031109cacannualmeetingminutes
& Wastewater, and Water System include: new Solid Waste contracts, North and South Transfer Station rebuilds, flood control and stormwater, ...
0.002053118 |
a/110288
031109cacannualmeetingminutes
& Wastewater, and Water System include: new Solid Waste contracts, North and South Transfer Station rebuilds, flood control and stormwater, ...
0.002053118 |
a/113994
mo arena at seattle center mou ord
; 22 Anthony Auriemma MO Arena at Seattle Center MOU ORD D2 Template last revised December 1, 2016 4 C. Provide for design, ...
0.002053118 |
a/56248
masterplan1
system. This park should not be asked to serve too many functions. It will best serve this city if it is permitted to ...
0.002053118 |
a/92264
11-13-03
in Lincoln Park caused minor damage to 7,500 square feet of turf. Parks staff are working on estimates of the extent and cost of needed ...
0.002053118 |
a/91948