Filter Results

2201 to 2225 of 2759
overview
requirements. The City of Seattle must abide by the City's two National Pollutant Discharge Elimination System (NPDES) ...
0.00218063151 |
a/63415
sprcip
timeline given long timelines for BNSF and shoreline permitting. SPR and SDOT continue to monitor the bridge for safety ...
0.00218063151 |
a/147697
2022solidwaste-chapter6-solidwastehandlingcollectionremoval
............................................................................................................. 6.20 Table 6.7 City-Owned ...
0.00218063151 |
a/146067
taylorcreek_ideasdescriptions_summer2023
down any buildings, and using a slide or a highline to get materials from the top of the canyon to the channel. Property acquisition, ...
0.00218063151 |
a/145819
spr_2328cip
in the worst condition and those requiring significant capital investment (i.e., installation of check steps, elevated walkways, and ...
0.00218063151 |
a/138620
ediimpplan042916final
– equitably distribute burdens and benefits of rising housing costs and demolition, redevelopment, and conversion of ...
0.00218063151 |
a/87044
ediimpplan042916final
– equitably distribute burdens and benefits of rising housing costs and demolition, redevelopment, and conversion of ...
0.00218063151 |
a/87575
public-webinar-5.8.25
Rule Proposal RULE TOPIC: Exemption Documentation•Building must have an active demolition or deconstruction ...
0.00218063151 |
a/168873
fortlawtonredevelopmentplan2019update
is provided by Puget Sound Energy. A natural gas main is located along 36th Avenue W. Solid waste service to the site is provided by a ...
0.00218063151 |
a/151017
2022solidwaste-chapter1-developmentofthe2022solidwasteplanupdate
handled more than 700,000 tons (1.4 billion pounds) of recycling, composting, and garbage created by the City’s residents, workers, and ...
0.00218063151 |
a/146057
neighborhoodplanningelement2015replacementpages
features. Incentives. Provisions for allowing floor area above the base should not create incentives for the demolition of ...
0.00218063151 |
a/87609
2023 center city off-street parking study - final
:00 P.M. Facilities reserved entirely for monthly parking, residents/ guests, customers/employees, or other permit holders ...
0.00218063151 |
a/161596
teche
to minimize the construction duration at any given location. Construction of any of the Build Alternatives would consist of the following ...
0.00218063151 |
a/100525
2022solidwastedraftch1
residents and workers. Construction and demolition projects in Seattle generated another 560,000 tons (1.12 billion pounds) ...
0.00218063151 |
a/126506
executivesummary(0)
moving on to the next segment to minimize the construction duration at any given location. Construction of any of the Build Alternatives ...
0.00218063151 |
a/100506
lpb062624firestation6pp
of the current permit application has identifi ed four conditions that require compliance with the Seattle Energy Code ...
0.00218063151 |
a/157543
lpb061424firestation6pp
of the current permit application has identifi ed four conditions that require compliance with the Seattle Energy Code ...
0.00218063151 |
a/157146
2022solidwastedraftch6
............................................................................................................. 6.20 Table 6.7 City-Owned ...
0.00218063151 |
a/126530
lpb062725villacostellapp
demolition and restoration of interior walls at owner’s expense. •Care taken to position portals to drain mini-splits to ...
0.00218063151 |
a/170200
lpb070225villacostellapp
demolition and restoration of interior walls at owner’s expense. •Care taken to position portals to drain mini-splits to ...
0.00218063151 |
a/170311
lpbcurrentnom_frederickboyd
of “potentially eligible landmarks” for commercial projects over 4,000 square feet in area. As any proposed alterations or ...
0.00218063151 |
a/74472
spcgsdigital01062020
consequences as well. We continue to see stark racial inequities in homeownership, employment, and health outcomes throughout the city.4 ...
0.00218063151 |
a/108091
2012sebcintro
failures have resulted during the ini-tial stages of grading, excavation and demolition. During these early stages, poorly ...
0.00218063151 |
a/97125
spc growth strategy white paper 1072020(0)
, there are negative consequences as well. We continue to see stark racial inequities in homeownership, employment, and health outcomes ...
0.00218063151 |
a/108073
spcgrowthstrategyfinal1072020
, there are negative consequences as well. We continue to see stark racial inequities in homeownership, employment, and health outcomes ...
0.00218063151 |
a/108090