Search Results
Results
2176 to 2200 of 2629
- isrdminutes_7-26-22 development. The project will include approximately 84 apartments, ground floor retail and approximately 34 parking stalls. The proposal ... 0.00220151572 | | a/140198
- cucac 02282023 draft minutes for June, and it will take more than seven months. Sydney Thiel: Intake appointments have been scheduled. The demolition ... 0.00220151572 | | a/156312
- pspb081722globessr the application for the East West Street project of the Waterfront. The Board requested more information on the reasons for the ... 0.00220151572 | | a/132420
- industrial_land_study_final_91305 wage industrial activities to be a high priority. • Permit commercial uses in industrial areas to the extent that they ... 0.00220151572 | | a/56434
- annualreportjuly2018june2019 of the building demolition list to include the Crawford Music Building. On June 15, 2011 the MUP and Minor Amendment ... 0.00220151572 | | a/77162
- dec_27_2023_city_to_hud_letter the affordable housing crisis in Seattle. Our approach includes expediting housing production, streamlining permitting and ... 0.00220151572 | | a/151413
- idminutes2-11-20 District Ordinance and Design Guidelines: SMC 23.66.308 – International District preferred uses east of Interstate 5 SMC 23.66.320 – ... 0.00220151572 | | a/73114
- spu_water_projects and needs to be completed prior to demolition of the Alaskan Way Viaduct.1st Quarter 20074th Quarter 2011BCL/Program ... 0.00220151572 | | a/61474
- mhc032526sr #317B previous use: Retail: 2.5.4 (c), Dave Ryan Pop Art. • Both spaces: Zone 1, Below Street Level, Food a-e and Retail (a-b) are the ... 0.00220151572 | | a/178698
- lpb0319251019belmontsr Applicant representative: Cresent Builds Summary of proposed application: Demolition of existing driveway and retaining ... 0.00220151572 | | a/166793
- isrdminutes_5-10-22 size is 13,439 sq. ft. The proposal includes demolition of a one-story non-2 contributing commercial building and related ... 0.00220151572 | | a/140196
- mhcminutes_9-13-23 to accommodate connection of the MarketFront Plaza to the future Overlook Walk. She said in May 2022 the MHC issued a Certificate of ... 0.00220151572 | | a/152163
- spu_mimp_annual_report_july_2020-june_2021 of the building demolition list to include the Crawford Music Building. On June 15, 2011 the MUP and Minor Amendment ... 0.00220151572 | | a/77235
- spucap2 , State, and Local laws, permit and regulatory requirements, and consent decrees; as well as by legal agreements with ... 0.00220151572 | | a/62167
- arts_culture_&_recreation , which resulted in planned staffing increases that are primarily paid for with General Fund resources in 2007 and 2008. Three Discovery ... 0.00220151572 | | a/61056
- isrdminutes_5-23-23 (6-7 stories) on a portion of what is now the Asian Plaza site. The application includes demolition of the extant building. ... 0.00220151572 | | a/144698
- seattlepublicutilities-solidwaste : The degree to which the project is driven by federal, state, and local laws, permit and regulatory requirements, and ... 0.00220151572 | | a/62357
- ffd_project_detail ); demolition of the Municipal Building and Public Safety Building; acquisition of the SeaPark Garage; development of open ... 0.00220151572 | | a/60902
- lpbminutes2-21-18 (of the addition); replacement of the bike rack with a new design to be installed over porous concrete paving, and ... 0.00220151572 | | a/75015
- ffd_projects at Seattle Municipal Tower; tenant improvements at Airport Way Center (formerly Park 90/5); demolition of the Municipal ... 0.00220151572 | | a/61254
- industrialmaritimestrategyindustrialgeneralzonesepadetermination : [ ] Exempt [X] DNS [ ] MDNS [ ] EIS [ ] DNS with conditions [ ] DNS involving non-exempt grading, or ... 0.00220151572 | | a/87131
- desrptmontlakeschool replacement 2009 Interior upgrades—included demolition and removal of hazardous building materials (asbestos, lead-based ... 0.00220151572 | | a/76171
- montlake-school-designation Waterline replacement 2009 Interior upgrades—included demolition and removal of hazardous building materials (asbestos, ... 0.00220151572 | | a/76472
- lpbminutes_10-5-22 for a demolition permit and the building department allowed demolition not realizing it ... 0.00220151572 | | a/139573
- lpb040225minutes unanimously. 040225.6 BRIEFING 040225.61 Memorial Wall 401 5th Avenue N Gareth Loveridge, Swift Company, provided more detail regarding how ... 0.00220151572 | | a/168319