Filter Results

2151 to 2175 of 2772
landuseapplicationfees2021
Conferences have a minimum initial fee of $788.00 (for 2 hours of meeting and review time). Additional pre‐submittal hours will be billed at ...
0.00199110643 |
a/96558
arts_culture_recreation
, the Seattle Department of Transportation issues street use permits for banners, but the Department does not promote ...
0.00199110643 |
a/61080
art_culture_recreation
resulted in planned staffing increases for 2006. Also, four demolition and restoration capital projects will be completed ...
0.00199110643 |
a/61001
landuseapplicationfees2022
‐submittal hours will be billed at the hourly rate. Master Use Permit applications are reviewed on an hourly basis. The min ...
0.00199110643 |
a/96559
q3&q4-2018strategicplantrackingreport-v1
included: • Replacement at Arroyo Beach is 25% complete; • Brace Point UG Permit is in the review process; • Civil ...
0.00199110643 |
a/51356
07.16.2020-ddr2020-13treeprotection
of the proposed location of structures, access, utilities and a consideration of the intensity and location of land disturbance activities ...
0.00199110643 |
a/118958
07.16.2020 ddr2020-13
of structures, access, utilities and a consideration of the intensity and location of land disturbance activities on the site during land ...
0.00199110643 |
a/119443
desrptjohn b. allen school
, it did not get listed for demolition under the subsequent building program. Around this time, the district changed its ...
0.00199110643 |
a/76115
desrptjohnballenschool
, it did not get listed for demolition under the subsequent building program. Around this time, the district changed its ...
0.00199110643 |
a/76116
allen-johnb-designation
, it did not get listed for demolition under the subsequent building program. Around this time, the district changed its ...
0.00199110643 |
a/75808
03.28.2024 bprc meeting minutes
Scheduling Unit completed processing of the picnic lottery applications received to date on March 14th in record time! The team created a ...
0.00199110643 |
a/155891
arts_culture_recreation
increases for 2006. Also, four demolition and restoration capital projects will be completed in Discovery Park, which ...
0.00199110643 |
a/61024
notes-2015-02-05
was polled by show of hands. The motion passes unanimously. Comments to DPD Recommended Conditions to Master Plan Approval #2 – TMP Goal ...
0.00199110643 |
a/77466
4391-ohevaluation
the demolition of the existing structure. Therefore, the future redevelopment of the property will require a change of use ...
0.00199110643 |
a/59452
landuseapplicationfeerequirements
a minimum initial fee of $860.00 (for 2 hours of meeting and review time). Additional pre‐submittal hours will be billed at the hourly rate. ...
0.00199110643 |
a/98099
landuseapplicationfees2023
initial fee of $860.00 (for 2 hours of meeting and review time). Additional pre‐submittal hours will be billed at the hourly rate. Master Us ...
0.00199110643 |
a/137804
pspb3-17-21
the 1949 earthquake, demolition of one building and new construction in targeted areas. The work will include façade ...
0.00199110643 |
a/73825
policylinkseattleequitymemoupdatefall2015
of businesses permitted to locate within the urban villages and urban centers. o New Policy: Ensure land use codes ...
0.00199110643 |
a/87065
policylinkseattleequitymemoupdatefall2015
of businesses permitted to locate within the urban villages and urban centers. o New Policy: Ensure land use codes ...
0.00199110643 |
a/87625
swacsummaryofcandddisposalbans
swacsummaryofcandddisposalbans 1 Construction and Demolition Waste Recycling Required Ordinance An ordinance will be ...
0.00199110643 |
a/111895
swacsummaryofcandddisposalbans
swacsummaryofcandddisposalbans 1 Construction and Demolition Waste Recycling Required Ordinance An ordinance will be ...
0.00199110643 |
a/115606
seattledesigncommission-2007.11.01broadstreetgreenstreetminutes
for relocating the demolished park. In August, the Council passed an ordinance requiring the demolition of Seattle ...
0.00199110643 |
a/85410
introcap
Improvement Programs to meet federal and state regulatory requirements. The City of Seattle must abide by the City's two National Pollutant ...
0.00199110643 |
a/62350
ose_btu_waivers
• Buildings scheduled to be demolished within three years of the tune-up compliance date.• Demolition or deconstruction ...
0.00199110643 |
a/145205
lpbminutes_8-3-22
would like to see 2 better spatial design and more architectural character in line with the existing site. She said ...
0.00199110643 |
a/139572