Search Results
Results
2151 to 2175 of 2636
- draft plan housing element and economic needs of the surrounding neighborhood. H5.11 Require advance notice to tenants and payment of relocation assistance to extreme ... 0.00220151572 | | a/87565
- draft plan housing element and economic needs of the surrounding neighborhood. H5.11 Require advance notice to tenants and payment of relocation assistance to extreme ... 0.00220151572 | | a/87413
- dr-annie-russell-house-designation No permit records have been located, but several alterations have been made over the years. • In the 1970s a small ... 0.00220151572 | | a/76353
- desrptdrannierussellhouse reportedly used to sneak many of Dr. Russell’s patients into the house. Just north of the staircase is a large storage room. The final ... 0.00220151572 | | a/75977
- solid-waste-moodys-2015 issued nearly $170 million of its $200 million of total debt within the last five years. Theseborrowings have financed the ... 0.00220151572 | | a/107433
- solid-waste-moodys-2015 issued nearly $170 million of its $200 million of total debt within the last five years. Theseborrowings have financed the ... 0.00220151572 | | a/58594
- notes20161115 plan that requires a Master Use Permit (MUP). The Citizen’s Advisory Committee (CAC), on the other hand, is formed to ... 0.00220151572 | | a/76864
- lpb-minutes-01-21-15 finished up design review and that the MUP will be complete March 18. Ms. Sodt explained that they are working on completing Certificate of ... 0.00220151572 | | a/74368
- lpb-01-21-15-minutes finished up design review and that the MUP will be complete March 18. Ms. Sodt explained that they are working on completing Certificate of ... 0.00220151572 | | a/74606
- notes08072017 the college would like to accomplish. Mr. Ernevad noted that one of the top priorities is the demolition of the north ... 0.00220151572 | | a/76990
- spu sac 112918 minutes final building that was destroyed, which was occupied by Gascoigne Lumber. Gascoigne Lumber and the University partnered with an environmental ... 0.00220151572 | | a/77203
- desrptpier59 and the piers structural support system were repaired as necessary and strengthened to accommodate anticipated loading. Changes to the pier ... 0.00220151572 | | a/76207
- mhc082323sr business. To be operated by Pig & Pine Books LLC owned by Tiffany Brost (100%). Additional information: • Zone 1, below street level, ... 0.00220151572 | | a/145618
- approvedseptember13meetingminutes want green spaces. • Address homelessness. • People want visible representation of different cultures. • Bring arts into downtown. • ... 0.00220151572 | | a/108368
- comprehensiveplanamendmentsaugust2021 grading, or demolition, or another agency with jurisdiction. Background The annual Comprehensive Plan amendment process ... 0.00220151572 | | a/87396
- wedgwooddns_analysis of Northeast Seattle into a 14,470 sq.ft. (.33 acre) public park. The proposal includes demolition of an existing asphalt ... 0.00220151572 | | a/93631
- june25minutes or appendix #7: Demolition and Displacement 6/25/2020 Meeting Minutes Page 4 • Amend the Land Use Element to discourage ... 0.00220151572 | | a/108858
- overview to Capitol Hill and the University of Washington. SDOT is managing the City’s design review and permitting process and has ... 0.00220151572 | | a/61646
- sepa-dns-adu-dadu-v2 Determination - Chapter 25.05, Seattle Municipal Code. SEPA DETERMINATION: [ ] Exempt [X] DNS [ ] MDNS [ ] EIS [ ] DNS with conditions ... 0.00220151572 | | a/54487
- idminutes3-26-19 includes proposed demolition of the existing one-story commercial building. Mr. Williams recused himself. Ms. Frestedt ... 0.00220151572 | | a/73124
- introduction . SDOT is managing the City’s design review and permitting process and has negotiated a reimbursement agreement with Sound ... 0.00220151572 | | a/61637
- 2023_state_legislative_agenda of losing housing. We will prioritize efforts to create and expand affordable housing options including changing land use and ... 0.00220151572 | | a/138025
- 2021sebcindex DEFINITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ......................................202 ... 0.00220151572 | | a/162634
- cucac 04122022 draft minutes of completing schematic design by the end of April, and then moving into sign development and permitting. “Break ground” in ... 0.00220151572 | | a/156309
- ballard-guidelines with the District’s governing ordinance(Seattle Municipal Code 25.16), no changes maybe made (including but not limited to ... 0.00220151572 | | a/72639