Filter Results

2076 to 2100 of 2668
lpbminutes_8-3-22
would like to see 2 better spatial design and more architectural character in line with the existing site. She said ...
0.00209446787 |
a/139572
overview
must abide by the City's two National Pollutant Discharge Elimination System (NPDES) permits, one for storm water and one ...
0.00209446787 |
a/63400
isrdminutes_5-28-24
goals and objectives SMC 23.66.308 – International District preferred uses east of Interstate 5 SMC 23.66.318 - Demolition ...
0.00209446787 |
a/159042
isrdminutes_5-28-24
goals and objectives SMC 23.66.308 – International District preferred uses east of Interstate 5 SMC 23.66.318 - Demolition ...
0.00209446787 |
a/159047
05-10_proposed_cip_ffd_project_detail
related to the sale of the Alaska Building - $450,000, expected completion 2005; demolition costs for the Municipal ...
0.00209446787 |
a/60833
03.28.2024 bprc meeting minutes_ada
of the picnic lottery applications received to date on March 14th in record time! The team created a total of 535 permits ...
0.00209446787 |
a/173048
05-10_ffd_adopted_project_detail_final
; transaction costs related to the sale of the Alaska Building - $450,000, expected completion 2005; demolition costs for ...
0.00209446787 |
a/60784
psbminutes2-5-20
-restaurant format ARC report: Change of use not reviewed at ARC. Jim Brown proposed a market hall concept for the ground floor and noted ...
0.00209446787 |
a/74229
constpermitcklistnewsfduplex
the applicant in preparing a complete application. It is the responsibility of the applicant to prepare a complete submittal. For further ...
0.00209446787 |
a/97916
lpb4-21-21
to secure Waterway 4 continued. The permit process would take another three years to complete. Soon after their ...
0.00209446787 |
a/74666
lpb9-2-20
Board opinion, and #2 - Obtained a SEPA Determination of Significance (DS) for the ' subdivision, construction of housing, change of use, ...
0.00209446787 |
a/74702
introduction
Pollutant Discharge Elimination System (NPDES) permits, one for storm water and one for combined sewer system. The City is ...
0.00209446787 |
a/62351
fortlawton-national-register-nomination
– FORT LAWTON KING COUNTY, WASHINGTON Section number 8 Page 21 of 29 Recreation called for the demolition of ...
0.00209446787 |
a/72897
pedretailareassurveyresponses
feelit would have a negative impact on the area.1/16/2014 9:03 AM271Avtech building is scheduled for demolition and a new v ...
0.00209446787 |
a/88130
parks
, Building 30 Sprinkler System, Building 18 demolition, North Shore, Pier and Log Boom, Picnic Shelter Renovation and ...
0.00209446787 |
a/61518
landuseapplicationfees2025
initial fee of $934.00 (for 2 hours of meeting and review time). Additional pre-submittal hours will be billed at the hourly rate. Master ...
0.00209446787 |
a/163980
phase2sepachecklist
such applications would be considered “vested” or otherwise under review per current codes and regulations. 10. List any governmental ...
0.00209446787 |
a/87323
seattle arena rfp 1-11-2017
for design, permitting, development, demolition (if applicable), and construction of the Arena (the ...
0.00209446787 |
a/56207
jac-meeting-notes-2021
is the prime. The project scope is to replace the floating cover on the reservoir. The project will start on the 17th with ...
0.00209446787 |
a/58813
louisa boren k-8 don recommendations final_comments
23.55.020.B. The project calls for the demolition of an existing pole mounted sign and construction of a new ground mounted ...
0.00209446787 |
a/133194
psb030123wsdotsr
sidewalk and lighting complying with the District Standards. Because of the condition of the existing building, demolition ...
0.00209446787 |
a/139073
ose-bldg-performance-standards-dnsv5-june2023
or existing building. The proposal does not include any provisions that would create incompatibilities between adjacent uses or lead to the ...
0.00209446787 |
a/143301
readersguideoverview
of Seattle must abide by the City's two National Pollutant Discharge Elimination System (NPDES) permits, one for storm ...
0.00209446787 |
a/62720
uwannualreport2014
. TABLE 4 Amended Development Capacity by Campus Area Campus Area % of Total Campus Development Capacity in Campus Area ...
0.00209446787 |
a/77873
culture_and_recreation
and Roof Repair K732224 532 1,460 0 0 2,425 68 0 0 365Langston Hughes Performing Arts Center - Renovation K732314 200 0 0 0 200 0 0 0 ...
0.00209446787 |
a/61620