Filter Results

2076 to 2100 of 2577
executivesummary(0)
moving on to the next segment to minimize the construction duration at any given location. Construction of any of the Build Alternatives ...
0.00219216617 |
a/100506
bullitt house facility loi with attachments ada
, of Lessee. 1.8 City Use of Premises; Third-Party Users. To the extent City uses, or permits any Third-Party ...
0.00219216617 |
a/173748
lpb062624firestation6pp
of the current permit application has identifi ed four conditions that require compliance with the Seattle Energy Code ...
0.00219216617 |
a/157543
lpb061424firestation6pp
of the current permit application has identifi ed four conditions that require compliance with the Seattle Energy Code ...
0.00219216617 |
a/157146
lpb062725villacostellapp
demolition and restoration of interior walls at owner’s expense. •Care taken to position portals to drain mini-splits to ...
0.00219216617 |
a/170200
lpb070225villacostellapp
demolition and restoration of interior walls at owner’s expense. •Care taken to position portals to drain mini-splits to ...
0.00219216617 |
a/170311
lpbcurrentnom_frederickboyd
of “potentially eligible landmarks” for commercial projects over 4,000 square feet in area. As any proposed alterations or ...
0.00219216617 |
a/74472
spcgsdigital01062020
consequences as well. We continue to see stark racial inequities in homeownership, employment, and health outcomes throughout the city.4 ...
0.00219216617 |
a/108091
2012sebcintro
failures have resulted during the ini-tial stages of grading, excavation and demolition. During these early stages, poorly ...
0.00219216617 |
a/97125
spc growth strategy white paper 1072020(0)
, there are negative consequences as well. We continue to see stark racial inequities in homeownership, employment, and health outcomes ...
0.00219216617 |
a/108073
spcgrowthstrategyfinal1072020
, there are negative consequences as well. We continue to see stark racial inequities in homeownership, employment, and health outcomes ...
0.00219216617 |
a/108090
spc growth strategy white paper 1072020
, there are negative consequences as well. We continue to see stark racial inequities in homeownership, employment, and health outcomes ...
0.00219216617 |
a/108074
seattletimes-building-complex-1947-office-building
eligible landmarks” for commercial projects over 4,000 square feet in area. As any proposed demolition of the subject ...
0.00219216617 |
a/74590
2019_0311 seattle amihac meeting #2
Elasticity of Supply(% change in price)(% change in supply)How are Middle Income Households Served in the Housing Market?9Filtering, ...
0.00219216617 |
a/72100
techb
on to the next segment to minimize the construction duration at any given location. Construction of any of the Build Alternatives would ...
0.00219216617 |
a/100522
metropole
of the Metropole building is an important opportunity to preserve, restore, and return to use this significant historic building which is ...
0.00219216617 |
a/74174
landuseapplicationfees2024
initial fee of $878.00 (for 2 hours of meeting and review time). Additional pre-submittal hours will be billed at the hourly rate. Master ...
0.00219216617 |
a/151448
2022-solid-waste-plan-update_chapter-6_solid-waste-handling-colle ...
.............................................................................................................Table 6.7 City-Owned ...
0.00219216617 |
a/146067
2022-solid-waste-plan-update_chapter-1_development-2022-plan-upda ...
) of recycling, composting, and garbage created by the City’s residents, workers, and visitors. Construction and demolition ...
0.00219216617 |
a/146057
cip_overview
by the City's two National Pollutant Discharge Elimination System (NPDES) permits, one for storm water and one for combined ...
0.00219216617 |
a/178181
phase1summaryofchangestoproposedamendments
. Original proposal. The draft proposal was to limit the size of a lot permitted for new development to a maximum of ...
0.002189833 |
a/87321
mo arena at seattle center mou ord
; 22 Anthony Auriemma MO Arena at Seattle Center MOU ORD D2 Template last revised December 1, 2016 4 C. Provide for design, ...
0.002189833 |
a/56248
harvardbelmont-guidelines
Board, is requiredprior to the issuance of any city building, demolition, street use, or other permits for ...
0.002189833 |
a/72898
mhc6-8-16_minutes
is in Zone 3, street 2 level, all uses permitted. No existing use approved for this space. Existing use approval: ...
0.002189833 |
a/73431
annualreportjuly2013june 2014
Music Building; and 3) augmentation of the building demolition list to include the Crawford Music Building. On June 15, ...
0.002189833 |
a/77158