Search Results
Results
2051 to 2075 of 2636
- isrdminutes_5-28-24 goals and objectives SMC 23.66.308 – International District preferred uses east of Interstate 5 SMC 23.66.318 - Demolition ... 0.002203886 | | a/159047
- 05-10_proposed_cip_ffd_project_detail related to the sale of the Alaska Building - $450,000, expected completion 2005; demolition costs for the Municipal ... 0.002203886 | | a/60833
- 03.28.2024 bprc meeting minutes_ada of the picnic lottery applications received to date on March 14th in record time! The team created a total of 535 permits ... 0.002203886 | | a/173048
- 05-10_ffd_adopted_project_detail_final ; transaction costs related to the sale of the Alaska Building - $450,000, expected completion 2005; demolition costs for ... 0.002203886 | | a/60784
- isrd01132026minutes a previous tenant had progressed through permitting, they ultimately withdrew, allowing the owners to return to their ... 0.002203886 | | a/180547
- psbminutes2-5-20 -restaurant format ARC report: Change of use not reviewed at ARC. Jim Brown proposed a market hall concept for the ground floor and noted ... 0.002203886 | | a/74229
- constpermitcklistnewsfduplex the applicant in preparing a complete application. It is the responsibility of the applicant to prepare a complete submittal. For further ... 0.002203886 | | a/97916
- lpb4-21-21 to secure Waterway 4 continued. The permit process would take another three years to complete. Soon after their ... 0.002203886 | | a/74666
- lpb9-2-20 Board opinion, and #2 - Obtained a SEPA Determination of Significance (DS) for the ' subdivision, construction of housing, change of use, ... 0.002203886 | | a/74702
- introduction Pollutant Discharge Elimination System (NPDES) permits, one for storm water and one for combined sewer system. The City is ... 0.002203886 | | a/62351
- fortlawton-national-register-nomination – FORT LAWTON KING COUNTY, WASHINGTON Section number 8 Page 21 of 29 Recreation called for the demolition of ... 0.002203886 | | a/72897
- pedretailareassurveyresponses feelit would have a negative impact on the area.1/16/2014 9:03 AM271Avtech building is scheduled for demolition and a new v ... 0.002203886 | | a/88130
- seattle-city-council-2020-work-program times.GROWING GRACEFULLYConsider tools to manage the impacts of growth in areas with high risk of displacement.IMPACT FEESConsider imposing ... 0.002203886 | | a/53345
- parks , Building 30 Sprinkler System, Building 18 demolition, North Shore, Pier and Log Boom, Picnic Shelter Renovation and ... 0.002203886 | | a/61518
- landuseapplicationfees2025 initial fee of $934.00 (for 2 hours of meeting and review time). Additional pre-submittal hours will be billed at the hourly rate. Master ... 0.002203886 | | a/163980
- seattle-city-council-2015-work-program_adopted-version-(res-31571 ... on the next Strategic Plan Update.DENNY SUBSTATION AND NODO NETWORKMonitor the permitting process for the Denny Substation ... 0.002203886 | | a/53344
- phase2sepachecklist such applications would be considered “vested” or otherwise under review per current codes and regulations. 10. List any governmental ... 0.002203886 | | a/87323
- seattle arena rfp 1-11-2017 for design, permitting, development, demolition (if applicable), and construction of the Arena (the ... 0.002203886 | | a/56207
- sepa-checklist_mobile-home-park-overlay environmental review. 10. List any government approvals or permits that will be needed for your proposal, if known. None ... 0.002203886 | | a/53406
- louisa boren k-8 don recommendations final_comments 23.55.020.B. The project calls for the demolition of an existing pole mounted sign and construction of a new ground mounted ... 0.002203886 | | a/133194
- psb030123wsdotsr sidewalk and lighting complying with the District Standards. Because of the condition of the existing building, demolition ... 0.002203886 | | a/139073
- ose-bldg-performance-standards-dnsv5-june2023 or existing building. The proposal does not include any provisions that would create incompatibilities between adjacent uses or lead to the ... 0.002203886 | | a/143301
- readersguideoverview of Seattle must abide by the City's two National Pollutant Discharge Elimination System (NPDES) permits, one for storm ... 0.002203886 | | a/62720
- uwannualreport2014 . TABLE 4 Amended Development Capacity by Campus Area Campus Area % of Total Campus Development Capacity in Campus Area ... 0.002203886 | | a/77873
- culture_and_recreation and Roof Repair K732224 532 1,460 0 0 2,425 68 0 0 365Langston Hughes Performing Arts Center - Renovation K732314 200 0 0 0 200 0 0 0 ... 0.002203886 | | a/61620