Filter Results

2051 to 2075 of 2775
qaespresentation
which may be allowed for each development standard from which a departure has been requested. Minority reports shall be ...
0.00189540721 |
a/76934
2018stbdannualreport_finalv2(0)
the center city. Major projects during this “Period of Maximum Constraint” include:• 2018: Convention Center construction begins • 2019: ...
0.00189540721 |
a/106387
2018stbdannualreport_finalv2
the center city. Major projects during this “Period of Maximum Constraint” include:• 2018: Convention Center construction begins • 2019: ...
0.00189540721 |
a/117448
2018stbdannualreport_finalv2
the center city. Major projects during this “Period of Maximum Constraint” include:• 2018: Convention Center construction begins • 2019: ...
0.00189540721 |
a/106388
lpb092023leonapp
BE SUBMITTED FOR PERMIT, THE CONTRACTOR OR COMPONENT VENDOR MUST HIRE AN ENGINEER REGISTERED IN THE STATE OF WASHINGTON AND ...
0.00189540721 |
a/147302
lpb050323leonaparkridgedwgs
BE SUBMITTED FOR PERMIT, THE CONTRACTOR OR COMPONENT VENDOR MUST HIRE AN ENGINEER REGISTERED IN THE STATE OF WASHINGTON AND ...
0.00189540721 |
a/142009
902_904_first_historic_report
............................................................................................................... 48 Figure 31 • ...
0.00189540721 |
a/74115
presentation20170720
departure which may be allowed for each development standard from which a departure has been requested. Minority reports shall be ...
0.00189540721 |
a/76930
lincolnhs_landscape_coa
2ZONE 3KEY PLANDESIGN DEVELOPMENTNOT FORCONSTRUCTIONKnow what's below.Call before you dig.Dial 811TESC AND DEMOLITION(PHASE ...
0.00189540721 |
a/75311
marijuanasepadetermination
Municipal Code. SEPA DETERMINATION [ ] Exempt [X ] DNS [ ] MDNS [ ] EIS [ ] DNS with conditions [ ] DNS involving non-exempt ...
0.001894589 |
a/98715
workforcehousingsepadecision
of this proposal would not change the allowable height or floor area permitted in any zone nor would it cause any ...
0.001894589 |
a/88204
overview
Renovation, Building 30 Sprinkler System, Building 18 demolition, North Shore, Pier and Log Boom, Picnic Shelter ...
0.001894589 |
a/61452
introduction
Development, Beach Comfort Station Replacement, Boat Ramp and Pier Renovation, Building 30 Sprinkler System, Building 18 ...
0.001894589 |
a/61443
overview
System, Building 18 demolition, North Shore, Pier and Log Boom, Picnic Shelter Renovation, and Shoreline Renovation. The ...
0.001894589 |
a/61517
overview
demolition and restoration of the site of the Discovery Park chapel annex and Washington Avenue. Work is progressing on ...
0.001894589 |
a/61324
introduction
Replacement, Boat Ramp and Pier Renovation, Building 30 Sprinkler System, Building 18 demolition, North Shore, Pier and Log ...
0.001894589 |
a/61511
introduction
nearby parks. Discovery Park: In 2007, DPR completed negotiations for the purchase of the Capehart property, and completed ...
0.001894589 |
a/61315
overview
property, and completed demolition and restoration of the site of the Discovery Park chapel annex and Washington Avenue. ...
0.001894589 |
a/61266
solid-waste-moodys-2014
, and 1.35 times in 2016. Key drivers of the drop include rising debt service, increasedcosts, and some revenue loss due to the ...
0.001894589 |
a/58593
solid-waste-moodys-2014
, and 1.35 times in 2016. Key drivers of the drop include rising debt service, increasedcosts, and some revenue loss due to the ...
0.001894589 |
a/107432
mhc2522_may11
, Business Owner Proposal to change name of existing business. New business to be operated by Kubode LLC owned by Kamille Barba ...
0.001894589 |
a/127975
2017.02.28-key arena-concept-narrative.electrical
priority. PART 2 - DESCRIPTION 2.1 DESCRIPTION OF WORK A. Demolition 1. Service a. Remove the existing primary ...
0.001894589 |
a/56255
05.11.2023 bprc meeting minutes final
with the Mayor's Office and the Office of Housing on the revised plan and timeline. We are now working on obtaining a ...
0.001894589 |
a/143454
12-14-06
Wetlands and Athletic Fields Project: The City Council approved a provision to begin Phase II of this project and Parks recently held a ...
0.001894589 |
a/92011
solidwastefacilitiesplanappendixd
municipal solid waste(MSW), construction and demolition(C&D) waste, recyclables, yardwaste, and household hazardouswaste ...
0.001894589 |
a/113165