You just searched for:
Search
Filter Results
2051 to 2075 of 2655
landuseapplicationfees2024
http://seattle.gov/documents/departments/sdci/codes/landuseapplicationfees2 ...
initial fee of $878.00 (for 2 hours of meeting and review time). Additional pre-submittal hours will be billed at the hourly rate. Master ...
0.002203886 |
a/151448
lpbminutes9-18-19
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
are not applicable to this application. MM/SC/DB/RF 7:0:0 Motion carried. 091819.24 Firestone Auto Supply and Service 400 ...
0.002203886 |
a/75053
water_detail
http://seattle.gov/documents/departments/financedepartment/0914proposedcip/ ...
to Northgate with a third segment expanding links to the East and North. SPU will assess its water infrastructure as it is exposed by Sound ...
0.002203886 |
a/61538
id4-26-16_minutes
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
and appeals SMC 23.66.320 Permitted uses SMC 23.66.326 Street-level uses SMC 23.66.336 Exterior building finishes A. ...
0.002203886 |
a/72938
arts_culture_recreation
http://seattle.gov/documents/departments/financedepartment/0708proposedbudg ...
, the Seattle Department of Transportation issues street use permits for banners, but the Department does not promote ...
0.002203886 |
a/61080
art_culture_recreation
http://seattle.gov/documents/departments/financedepartment/06adoptedbudget/ ...
resulted in planned staffing increases for 2006. Also, four demolition and restoration capital projects will be completed ...
0.002203886 |
a/61001
q3&q4-2018strategicplantrackingreport-v1
http://seattle.gov/documents/departments/citylightreviewpanel/documents/q3& ...
included: • Replacement at Arroyo Beach is 25% complete; • Brace Point UG Permit is in the review process; • Civil ...
0.002203886 |
a/51356
07.16.2020-ddr2020-13treeprotection
http://seattle.gov/documents/departments/urbanforestrycommission/2020/2020d ...
of the proposed location of structures, access, utilities and a consideration of the intensity and location of land disturbance activities ...
0.002203886 |
a/118958
07.16.2020 ddr2020-13
http://seattle.gov/documents/departments/urbanforestrycommission/resources/ ...
of structures, access, utilities and a consideration of the intensity and location of land disturbance activities on the site during land ...
0.002203886 |
a/119443
desrptjohn b. allen school
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
, it did not get listed for demolition under the subsequent building program. Around this time, the district changed its ...
0.002203886 |
a/76115
desrptjohnballenschool
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
, it did not get listed for demolition under the subsequent building program. Around this time, the district changed its ...
0.002203886 |
a/76116
allen-johnb-designation
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
, it did not get listed for demolition under the subsequent building program. Around this time, the district changed its ...
0.002203886 |
a/75808
landuseapplicationfees2026
http://seattle.gov/documents/departments/sdci/codes/landuseapplicationfees2 ...
initial fee of $1102.00 (for 2 hours of meeting and review time). Additional pre-submittal hours will be billed at the hourly rate. Master ...
0.002203886 |
a/176210
arts_culture_recreation
http://seattle.gov/documents/departments/financedepartment/06proposedbudget ...
increases for 2006. Also, four demolition and restoration capital projects will be completed in Discovery Park, which ...
0.002203886 |
a/61024
notes-2015-02-05
http://seattle.gov/documents/departments/neighborhoods/majorinstitutions/sw ...
was polled by show of hands. The motion passes unanimously. Comments to DPD Recommended Conditions to Master Plan Approval #2 – TMP Goal ...
0.002203886 |
a/77466
4391-ohevaluation
http://seattle.gov/documents/departments/fas/realestateservices/property/43 ...
the demolition of the existing structure. Therefore, the future redevelopment of the property will require a change of use ...
0.002203886 |
a/59452
landuseapplicationfeerequirements
http://seattle.gov/documents/departments/sdci/permits/landuseapplicationfee ...
a minimum initial fee of $860.00 (for 2 hours of meeting and review time). Additional pre‐submittal hours will be billed at the hourly rate. ...
0.002203886 |
a/98099
pspb3-17-21
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
the 1949 earthquake, demolition of one building and new construction in targeted areas. The work will include façade ...
0.002203886 |
a/73825
20250513cucac_min
http://seattle.gov/documents/departments/neighborhoods/majorinstitutions/un ...
this project. Engagement needs of programs and facilities are being identified. Demolition is planned for Spring of 2026, ...
0.002203886 |
a/175128
policylinkseattleequitymemoupdatefall2015
http://seattle.gov/documents/departments/opcd/ongoinginitiatives/equitabled ...
of businesses permitted to locate within the urban villages and urban centers. o New Policy: Ensure land use codes ...
0.002203886 |
a/87065
policylinkseattleequitymemoupdatefall2015
http://seattle.gov/documents/departments/opcd/ongoinginitiatives/seattlesco ...
of businesses permitted to locate within the urban villages and urban centers. o New Policy: Ensure land use codes ...
0.002203886 |
a/87625
seattledesigncommission-2007.11.01broadstreetgreenstreetminutes
http://seattle.gov/documents/departments/opcd/designcommission/projectarchi ...
for relocating the demolished park. In August, the Council passed an ordinance requiring the demolition of Seattle ...
0.002203886 |
a/85410
introcap
http://seattle.gov/documents/departments/financedepartment/1520adoptedcip/i ...
Improvement Programs to meet federal and state regulatory requirements. The City of Seattle must abide by the City's two National Pollutant ...
0.002203886 |
a/62350
ose_btu_waivers
http://seattle.gov/documents/departments/ose/tune-ups/ose_btu_waivers.pdf
• Buildings scheduled to be demolished within three years of the tune-up compliance date.• Demolition or deconstruction ...
0.002203886 |
a/145205
lpbminutes_8-3-22
http://seattle.gov/documents/departments/neighborhoods/historicpreservation ...
would like to see 2 better spatial design and more architectural character in line with the existing site. She said ...
0.002203886 |
a/139572