Filter Results

2001 to 2025 of 2610
mhc1-23-19
is in zone 3, street level, all uses permitted. Use: Food e – restaurant. Space is 2,270 square feet. Proposed ownership ...
0.00218063151 |
a/73401
october26minutes
exceptional and hazardous trees standards/review process • Revised vacant buildings restrictions and demolition standards • ...
0.00218063151 |
a/109087
ratabatementcertification
3303.15 and Seattle Residential Code R107.12 PROJECT INFORMATION SDCI demolition permit no. ...
0.00218063151 |
a/97994
idminutes2-26-19
applicable sections of the International Special Review District Ordinance and Design Guidelines: SMC 23.66.334- Streets and sidewalks SMC ...
0.00218063151 |
a/73118
3rdand4thquarter2018-strategicplantrackingreport-final
of baseline operations. Third and fourth quarter accomplishments included: • Replacement at Arroyo Beach is 25% complete; • Brace Point UG ...
0.00218063151 |
a/51098
lpbminutes9-18-19
are not applicable to this application. MM/SC/DB/RF 7:0:0 Motion carried. 091819.24 Firestone Auto Supply and Service 400 ...
0.00218063151 |
a/75053
water_detail
to Northgate with a third segment expanding links to the East and North. SPU will assess its water infrastructure as it is exposed by Sound ...
0.00218063151 |
a/61538
id4-26-16_minutes
and appeals SMC 23.66.320 Permitted uses SMC 23.66.326 Street-level uses SMC 23.66.336 Exterior building finishes A. ...
0.00218063151 |
a/72938
arts_culture_recreation
, the Seattle Department of Transportation issues street use permits for banners, but the Department does not promote ...
0.00218063151 |
a/61080
art_culture_recreation
resulted in planned staffing increases for 2006. Also, four demolition and restoration capital projects will be completed ...
0.00218063151 |
a/61001
q3&q4-2018strategicplantrackingreport-v1
included: • Replacement at Arroyo Beach is 25% complete; • Brace Point UG Permit is in the review process; • Civil ...
0.00218063151 |
a/51356
07.16.2020 ddr2020-13
of structures, access, utilities and a consideration of the intensity and location of land disturbance activities on the site during land ...
0.00218063151 |
a/119443
desrptjohn b. allen school
, it did not get listed for demolition under the subsequent building program. Around this time, the district changed its ...
0.00218063151 |
a/76115
desrptjohnballenschool
, it did not get listed for demolition under the subsequent building program. Around this time, the district changed its ...
0.00218063151 |
a/76116
allen-johnb-designation
, it did not get listed for demolition under the subsequent building program. Around this time, the district changed its ...
0.00218063151 |
a/75808
landuseapplicationfees2026
initial fee of $1102.00 (for 2 hours of meeting and review time). Additional pre-submittal hours will be billed at the hourly rate. Master ...
0.00218063151 |
a/176210
arts_culture_recreation
increases for 2006. Also, four demolition and restoration capital projects will be completed in Discovery Park, which ...
0.00218063151 |
a/61024
landuseapplicationfeerequirements
a minimum initial fee of $860.00 (for 2 hours of meeting and review time). Additional pre‐submittal hours will be billed at the hourly rate. ...
0.00218063151 |
a/98099
pspb3-17-21
the 1949 earthquake, demolition of one building and new construction in targeted areas. The work will include façade ...
0.00218063151 |
a/73825
policylinkseattleequitymemoupdatefall2015
of businesses permitted to locate within the urban villages and urban centers. o New Policy: Ensure land use codes ...
0.00218063151 |
a/87065
policylinkseattleequitymemoupdatefall2015
of businesses permitted to locate within the urban villages and urban centers. o New Policy: Ensure land use codes ...
0.00218063151 |
a/87625
seattledesigncommission-2007.11.01broadstreetgreenstreetminutes
for relocating the demolished park. In August, the Council passed an ordinance requiring the demolition of Seattle ...
0.00218063151 |
a/85410
introcap
Improvement Programs to meet federal and state regulatory requirements. The City of Seattle must abide by the City's two National Pollutant ...
0.00218063151 |
a/62350
ose_btu_waivers
• Buildings scheduled to be demolished within three years of the tune-up compliance date.• Demolition or deconstruction ...
0.00218063151 |
a/145205
lpbminutes_8-3-22
would like to see 2 better spatial design and more architectural character in line with the existing site. She said ...
0.00218063151 |
a/139572