Filter Results

1976 to 2000 of 2574
notes20120112
concerning replacement housing requirement to state that the demolition of structures with residential uses or change of ...
0.00218063151 |
a/77264
notes20190313
that he is in the process of responding to the committee’s recommendations and collaborating with the City with its MUP application. Mr. ...
0.00218063151 |
a/77492
october26minutes
exceptional and hazardous trees standards/review process • Revised vacant buildings restrictions and demolition standards • ...
0.00218063151 |
a/109087
ratabatementcertification
3303.15 and Seattle Residential Code R107.12 PROJECT INFORMATION SDCI demolition permit no. ...
0.00218063151 |
a/97994
notes-20190311
assessment, and file a Master Use Permit (MUP), and demolition permit. The timeline ...
0.00218063151 |
a/77633
idminutes2-26-19
applicable sections of the International Special Review District Ordinance and Design Guidelines: SMC 23.66.334- Streets and sidewalks SMC ...
0.00218063151 |
a/73118
sccmimpprelimdrafteissectioniii3.4_environmental ...
following demolition of the building. Approximately 407 cubic yards of PCS were removed for off-side disposal. Soil samples ...
0.00218063151 |
a/138074
3rdand4thquarter2018-strategicplantrackingreport-final
of baseline operations. Third and fourth quarter accomplishments included: • Replacement at Arroyo Beach is 25% complete; • Brace Point UG ...
0.00218063151 |
a/51098
landuseapplicationfees2024
initial fee of $878.00 (for 2 hours of meeting and review time). Additional pre-submittal hours will be billed at the hourly rate. Master ...
0.00218063151 |
a/151448
lpbminutes9-18-19
are not applicable to this application. MM/SC/DB/RF 7:0:0 Motion carried. 091819.24 Firestone Auto Supply and Service 400 ...
0.00218063151 |
a/75053
water_detail
to Northgate with a third segment expanding links to the East and North. SPU will assess its water infrastructure as it is exposed by Sound ...
0.00218063151 |
a/61538
id4-26-16_minutes
and appeals SMC 23.66.320 Permitted uses SMC 23.66.326 Street-level uses SMC 23.66.336 Exterior building finishes A. ...
0.00218063151 |
a/72938
arts_culture_recreation
, the Seattle Department of Transportation issues street use permits for banners, but the Department does not promote ...
0.00218063151 |
a/61080
art_culture_recreation
resulted in planned staffing increases for 2006. Also, four demolition and restoration capital projects will be completed ...
0.00218063151 |
a/61001
q3&q4-2018strategicplantrackingreport-v1
included: • Replacement at Arroyo Beach is 25% complete; • Brace Point UG Permit is in the review process; • Civil ...
0.00218063151 |
a/51356
07.16.2020 ddr2020-13
of structures, access, utilities and a consideration of the intensity and location of land disturbance activities on the site during land ...
0.00218063151 |
a/119443
desrptjohn b. allen school
, it did not get listed for demolition under the subsequent building program. Around this time, the district changed its ...
0.00218063151 |
a/76115
desrptjohnballenschool
, it did not get listed for demolition under the subsequent building program. Around this time, the district changed its ...
0.00218063151 |
a/76116
allen-johnb-designation
, it did not get listed for demolition under the subsequent building program. Around this time, the district changed its ...
0.00218063151 |
a/75808
landuseapplicationfees2026
initial fee of $1102.00 (for 2 hours of meeting and review time). Additional pre-submittal hours will be billed at the hourly rate. Master ...
0.00218063151 |
a/176210
arts_culture_recreation
increases for 2006. Also, four demolition and restoration capital projects will be completed in Discovery Park, which ...
0.00218063151 |
a/61024
notes-2015-02-05
was polled by show of hands. The motion passes unanimously. Comments to DPD Recommended Conditions to Master Plan Approval #2 – TMP Goal ...
0.00218063151 |
a/77466
landuseapplicationfeerequirements
a minimum initial fee of $860.00 (for 2 hours of meeting and review time). Additional pre‐submittal hours will be billed at the hourly rate. ...
0.00218063151 |
a/98099
pspb3-17-21
the 1949 earthquake, demolition of one building and new construction in targeted areas. The work will include façade ...
0.00218063151 |
a/73825
20250513cucac_min
this project. Engagement needs of programs and facilities are being identified. Demolition is planned for Spring of 2026, ...
0.00218063151 |
a/175128