Filter Results

176 to 200 of 1848
2026-standard-specifications
coordinated with the 2026 Edition City of Seattle Standard Plans for Municipal Construction. The 2026 Standard ...
0.00186839048 |
a/178086
final_sodo-actionagenda_2009-0518_lowres_edit
for many people in the region, and the City’s recent adoption of a Bicycle Master Plan calls attention to ...
0.00186814612 |
a/56490
2020_standard_specifications
on-line at the following URL:http://www.seattle.gov/utilities/construction-and-development/standard-specs-plans/amendments ...
0.00186811178 |
a/113678
2024-2029 proposed cip
street paving and resurfacing; building new sidewalks and curb ramps; school safety improvements; implementation of the Bike, Pedestrian, ...
0.00186708465 |
a/147694
oneseattleplanmayorsplanappendices2025
Appendices V1 One Seattle Plan—Mayor’s Recommended Appendix 1 Transportation | Page A-21 Freight ...
0.00186666544 |
a/164094
pmp_appendices
Parkways9/19/20Ballard Salmon Bay ParkPlanning Commission9/24/15City HallFreight Master ...
0.00186599791 |
a/99134
2012adoptedbudget_001
control, and freight spot improvements. Council made several changes to the planned uses of these funds ...
0.00186596066 |
a/61928
2016proposedbudgetbook
and implementing a comprehensive, multi-modal transportation strategy for Seattle. The strategy will integrate and prioritize within the ...
0.00186583668 |
a/62627
2014standardspecifications
of Transportation, Seattle Parks and Recreation, Seattle City Light, and the Seattle Center. These Specifications have been coordinated ...
0.001865584 |
a/113664
2014adoptedbudgetbook
million that had been allocated to implementing the Pedestrian Master Plan, but which the Seattle ...
0.00186524913 |
a/62189
2017standardspecifications
Plans for Municipal Construction. The 2017 Standard Specifications apply whenever any public or private construction is ...
0.00186439045 |
a/113668
prelimdrafteis-2013-11-07
prelimdrafteis-2013-11-07 Swedish Cherry Hill Medical Center Major Institution Master Plan ...
0.00186358031 |
a/77558
2024-2029 adopted capital improvement program
improvements; implementation of the Bike, Pedestrian, Freight, and Transit Master Plans; ...
0.00186291419 |
a/153286
oneseattleplanappendicesdecember2025
| Page A-22 Figure A-11 Freight Assets One Seattle Plan—Mayor’s Recommended Appendix 1 ...
0.00186212815 |
a/176332
2023 adopted and 2024 endorsed budgets
(Pedestrian Master Plan, Bicycle Master Plan, Freight ...
0.00186195155 |
a/138530
2019-04-02-uw-cmp-final-plan-reduced
2019-04-02-uw-cmp-final-plan-reduced 2019 SEATTLE CAMPUS MASTER PLANFebruary 2019 Compiled PlanUNIVERSITY ...
0.00186154 |
a/77684
2019-04-02-uw-cmp-final-plan-reduced(0)
2019-04-02-uw-cmp-final-plan-reduced(0) 2019 SEATTLE CAMPUS MASTER PLANFebruary 2019 Compiled ...
0.00186154 |
a/77683
draftcompplan
•Pedestrian Master Plan•Bicycle Master Plan•Transit Master
0.00186137331 |
a/86727
draft comp plan
Plans•Pedestrian Master Plan•Bicycle Master Plan•Transi ...
0.00186137331 |
a/87405
draft comp plan
Plans•Pedestrian Master Plan•Bicycle Master Plan•Transi ...
0.00186137331 |
a/87557
oneseattleplanmayorsplanappendicesjan2025
Infrastructure One Seattle Plan—Mayor’s Recommended Draft Appendix 1 Transportation | Page A-21 ...
0.00186122209 |
a/169321
2018proposedbudgetbook
of the City’s Pedestrian Master Plan, including investments in new sidewalks, school safety projects, ...
0.00186116085 |
a/62997
2025-2026 adopted budget book
features of the Garfield Super Block Master Plan, such as a redesigned “front porch” plaza with picnic ...
0.00185858912 |
a/165415
2022_proposed_budget
Pedestrian Master Plan projects, Bike Master Plan projects, transit ...
0.00185747724 |
a/63575
2025-2030 proposed cip
; implementation of the Bike, Pedestrian, Freight, and Transit Master Plans; investments ...
0.00185703614 |
a/160787