Search Results
Results
1951 to 1975 of 2644
- workforcehousingsepadecision of this proposal would not change the allowable height or floor area permitted in any zone nor would it cause any ... 0.00220460468 | | a/88204
- overview Renovation, Building 30 Sprinkler System, Building 18 demolition, North Shore, Pier and Log Boom, Picnic Shelter ... 0.00220460468 | | a/61452
- introduction Development, Beach Comfort Station Replacement, Boat Ramp and Pier Renovation, Building 30 Sprinkler System, Building 18 ... 0.00220460468 | | a/61443
- overview System, Building 18 demolition, North Shore, Pier and Log Boom, Picnic Shelter Renovation, and Shoreline Renovation. The ... 0.00220460468 | | a/61517
- overview demolition and restoration of the site of the Discovery Park chapel annex and Washington Avenue. Work is progressing on ... 0.00220460468 | | a/61324
- introduction Replacement, Boat Ramp and Pier Renovation, Building 30 Sprinkler System, Building 18 demolition, North Shore, Pier and Log ... 0.00220460468 | | a/61511
- introduction nearby parks. Discovery Park: In 2007, DPR completed negotiations for the purchase of the Capehart property, and completed ... 0.00220460468 | | a/61315
- overview property, and completed demolition and restoration of the site of the Discovery Park chapel annex and Washington Avenue. ... 0.00220460468 | | a/61266
- solid-waste-moodys-2014 , and 1.35 times in 2016. Key drivers of the drop include rising debt service, increasedcosts, and some revenue loss due to the ... 0.00220460468 | | a/58593
- solid-waste-moodys-2014 , and 1.35 times in 2016. Key drivers of the drop include rising debt service, increasedcosts, and some revenue loss due to the ... 0.00220460468 | | a/107432
- mhc2522_may11 , Business Owner Proposal to change name of existing business. New business to be operated by Kubode LLC owned by Kamille Barba ... 0.00220460468 | | a/127975
- 2017.02.28-key arena-concept-narrative.electrical priority. PART 2 - DESCRIPTION 2.1 DESCRIPTION OF WORK A. Demolition 1. Service a. Remove the existing primary ... 0.00220460468 | | a/56255
- idminutes1-22-19 the signal addition maintains existing turning movements, existing painted area. She said eastbound and westbound lefts turns are ... 0.00220460468 | | a/73093
- lpbminutes4-17-19 , is required prior to the issuance of any city building, demolition, street use, or other permits for ... 0.00220460468 | | a/75024
- 01.23.2025 bprc meeting minutes be scoped, designed, and completed. The scope of the stabilization work includes selective demolition of the damaged parts ... 0.00220460468 | | a/167292
- sepadeterminationfirestation6lease . SEPA DETERMINATION: [ ] Exempt [X] DNS [ ] MDNS [ ] EIS [ ] DNS with conditions [ ] DNS involving non-exempt grading, or ... 0.00220460468 | | a/87066
- id12-8-15-minutes ; it has to meet safety standards NIER which are submitted to DPD as part of permit process. Ms. Woo asked if signage ... 0.00220460468 | | a/72926
- lpbminutes4-5-17 in intensity, revolve or are otherwise in motion or appear to be in motion shall not be permitted. Secretary of the ... 0.00220460468 | | a/75029
- designpackagedeliverablesfinal ☐ Traffic Control Plans (if necessary) ☐ Final Project permits list with conditions. ☐ FinalGeotechnical Interpretive ... 0.00220460468 | | a/154251
- 01.23.2025 bprc meeting minutes_ada of the stabilization work includes selective demolition of the damaged parts of roof, assessment and shoring of walls that ... 0.00220460468 | | a/173610
- lpbminutes7-1-20 . 070120.3 CERTIFICATE OF APPROVAL 070120.31 Lake Union Steam Plant 1179 Eastlake Avenue East Proposed ... 0.00220460468 | | a/163348
- lpb07152026minutes protected during adjacent stadium demolition and construction. The agreement allows in‑kind maintenance and repairs ... 0.00220460468 | | a/184046
- contextgeorgetown hri 2014 survey update - final report feb 2015 the exterior portions of the properties were examined. Surveyors noted any major alterations to or the demolition of ... 0.00220460468 | | a/74350
- memo-potential-seattle-2035-amendments-20160810 and villages by citing ranges in development from low-density to high-density, as follows: LU 1.3 Provide for a wide range in the scale and ... 0.00220460468 | | a/53449
- light_projects includes design, permit preparation and evaluates customer load requirements. This project is an addition to the Feeder ... 0.00220460468 | | a/61644