Filter Results

1951 to 1975 of 2610
designpackagedeliverablesfinal
☐ Traffic Control Plans (if necessary) ☐ Final Project permits list with conditions. ☐ FinalGeotechnical Interpretive ...
0.00219287374 |
a/154251
01.23.2025 bprc meeting minutes_ada
of the stabilization work includes selective demolition of the damaged parts of roof, assessment and shoring of walls that ...
0.00219287374 |
a/173610
lpbminutes7-1-20
. 070120.3 CERTIFICATE OF APPROVAL 070120.31 Lake Union Steam Plant 1179 Eastlake Avenue East Proposed ...
0.00219287374 |
a/163348
contextgeorgetown hri 2014 survey update - final report feb 2015
the exterior portions of the properties were examined. Surveyors noted any major alterations to or the demolition of ...
0.00219287374 |
a/74350
memo-potential-seattle-2035-amendments-20160810
and villages by citing ranges in development from low-density to high-density, as follows: LU 1.3 Provide for a wide range in the scale and ...
0.00219287374 |
a/53449
light_projects
includes design, permit preparation and evaluates customer load requirements. This project is an addition to the Feeder ...
0.00219287374 |
a/61644
military support annex revised march 2021 v1 - final
, or businesses is not permitted. • Exclusive Direct Assistance to a single public or publicly owned facility (e.g., a ...
0.00219287374 |
a/57068
2018sebcintroduction
of grading, excavation and demolition. During these early stages, poorly designed and installed sheeting and shoring have ...
0.00219287374 |
a/97169
ballardsepadraftordinance2018
. Permitted, prohibited, or conditional use provisions, except that departures may 5 be granted from development standards ...
0.00219287374 |
a/86278
seattle_m_draft-econ-impact_051815
$120,000$80,000$60,000$76,301Per Site SF$30$75$75$75$264Building Demolition Costs$50,000$50,000$50,000$50,000$50,000Hard ...
0.00219287374 |
a/53504
seattle_m_draft-econ-impact_051815
$120,000$80,000$60,000$76,301Per Site SF$30$75$75$75$264Building Demolition Costs$50,000$50,000$50,000$50,000$50,000Hard ...
0.00219287374 |
a/53498
light_projects
Substation. The customer pays for this feeder. This project includes design, permit preparation and evaluates customer ...
0.00219287374 |
a/61708
seattleindustrialfeisch3.6
, and television studios. E 72 (exterior) Hotels, motels, offices, restaurants/bars, and other developed lands, properties or activities ...
0.00219287374 |
a/134520
seattle industrial deis ch 3.6 2021_12
, and television studios. E 72 (exterior) Hotels, motels, offices, restaurants/bars, and other developed lands, properties or activities ...
0.00219287374 |
a/87155
utilitiesappendix
substation is being permitted to meet the load growth in the Denny Triangle and South Lake Union.Capacity would also be ...
0.00219287374 |
a/87677
d-c team review final rev 2 053017-ovg
that detail these changes, these seem to be improvements over the original proposal. C. Provide for design, permitting, ...
0.00219287374 |
a/56227
oneseattleplandeisnoise
not included in A-D or F. Includes undeveloped land permitted for these activities. F — Agriculture, airports, bus yards, ...
0.00219287374 |
a/153567
2012seattlefireintro
for thecomponents that will permit their safe use without special knowledge or effort. The means ofegress protection ...
0.00219287374 |
a/97624
lpbcurrentnom_uw_mackenzie_hall
or the City. There is no local ordinance that requires an owner to nominate its property. Such a step may occur if an owner proposes ...
0.00219287374 |
a/74562
upcoming_opps_2019_11.5
the project objectives and meet the mitigation requirements. The consultant would develop a final mitigation plan for approval by regulatory ...
0.00219287374 |
a/99798
upcoming_opps_2019_1
, Stormwater Design, Watermain Design, Utility Design and Coordination, Geotechnical Analysis and Potholing, Railroad Track Relocation and ...
0.00219287374 |
a/99796
upcoming_opps_2019_5.6
to their members, as required by City of Seattle permit conditions. The Survey will be designed to understand respondents’ ...
0.00219287374 |
a/99811
upcoming_opps_2019_2.6
, types of environmental permitting required, and ways to minimize impact to the navigable channel and 15th Ave W corridor ...
0.00219287374 |
a/99799
upcoming_opps_2019_11.22
and meet the mitigation requirements. The consultant would develop a final mitigation plan for approval by regulatory agencies, conduct ...
0.00219287374 |
a/99797
upcoming_opportunitiesv.22
, Stormwater Design, Watermain Design, Utility Design and Coordination, Geotechnical Analysis and Potholing, Railroad Track Relocation and ...
0.00219287374 |
a/99790