Skip to main content
This is an official government website.

Search Results

Search

Filters
Topics [14]
Departments [34]
Documents [2597]

Filters

Topics [14]
Departments [34]
Documents [2597]

Results

1951 to 1975 of 2644
  1. workforcehousingsepadecision of this proposal would not change the allowable height or floor area permitted in any zone nor would it cause any ...
  2. overview Renovation, Building 30 Sprinkler System, Building 18 demolition, North Shore, Pier and Log Boom, Picnic Shelter ...
  3. introduction Development, Beach Comfort Station Replacement, Boat Ramp and Pier Renovation, Building 30 Sprinkler System, Building 18 ...
  4. overview System, Building 18 demolition, North Shore, Pier and Log Boom, Picnic Shelter Renovation, and Shoreline Renovation. The ...
  5. overview demolition and restoration of the site of the Discovery Park chapel annex and Washington Avenue. Work is progressing on ...
  6. introduction Replacement, Boat Ramp and Pier Renovation, Building 30 Sprinkler System, Building 18 demolition, North Shore, Pier and Log ...
  7. introduction nearby parks. Discovery Park: In 2007, DPR completed negotiations for the purchase of the Capehart property, and completed ...
  8. overview property, and completed demolition and restoration of the site of the Discovery Park chapel annex and Washington Avenue. ...
  9. solid-waste-moodys-2014 , and 1.35 times in 2016. Key drivers of the drop include rising debt service, increasedcosts, and some revenue loss due to the ...
  10. solid-waste-moodys-2014 , and 1.35 times in 2016. Key drivers of the drop include rising debt service, increasedcosts, and some revenue loss due to the ...
  11. mhc2522_may11 , Business Owner Proposal to change name of existing business. New business to be operated by Kubode LLC owned by Kamille Barba ...
  12. 2017.02.28-key arena-concept-narrative.electrical priority. PART 2 - DESCRIPTION 2.1 DESCRIPTION OF WORK A. Demolition 1. Service a. Remove the existing primary ...
  13. idminutes1-22-19 the signal addition maintains existing turning movements, existing painted area. She said eastbound and westbound lefts turns are ...
  14. lpbminutes4-17-19 , is required prior to the issuance of any city building, demolition, street use, or other permits for ...
  15. 01.23.2025 bprc meeting minutes be scoped, designed, and completed. The scope of the stabilization work includes selective demolition of the damaged parts ...
  16. sepadeterminationfirestation6lease . SEPA DETERMINATION: [ ] Exempt [X] DNS [ ] MDNS [ ] EIS [ ] DNS with conditions [ ] DNS involving non-exempt grading, or ...
  17. id12-8-15-minutes ; it has to meet safety standards NIER which are submitted to DPD as part of permit process. Ms. Woo asked if signage ...
  18. lpbminutes4-5-17 in intensity, revolve or are otherwise in motion or appear to be in motion shall not be permitted. Secretary of the ...
  19. designpackagedeliverablesfinal ☐ Traffic Control Plans (if necessary) ☐ Final Project permits list with conditions. ☐ FinalGeotechnical Interpretive ...
  20. 01.23.2025 bprc meeting minutes_ada of the stabilization work includes selective demolition of the damaged parts of roof, assessment and shoring of walls that ...
  21. lpbminutes7-1-20 . 070120.3 CERTIFICATE OF APPROVAL 070120.31 Lake Union Steam Plant 1179 Eastlake Avenue East Proposed ...
  22. lpb07152026minutes protected during adjacent stadium demolition and construction. The agreement allows in‑kind maintenance and repairs ...
  23. contextgeorgetown hri 2014 survey update - final report feb 2015 the exterior portions of the properties were examined. Surveyors noted any major alterations to or the demolition of ...
  24. memo-potential-seattle-2035-amendments-20160810 and villages by citing ranges in development from low-density to high-density, as follows: LU 1.3 Provide for a wide range in the scale and ...
  25. light_projects includes design, permit preparation and evaluates customer load requirements. This project is an addition to the Feeder ...