Filter Results

1926 to 1950 of 2651
23rdandcherryrezonesepachecklist
a 15,211 sq. ft. two story addition to existing institution (Horace Mann School). It will be the future site of NOVA High School. (Project # ...
0.00218256819 |
a/86172
23rdandunionrezonesepachecklist
# 3019001) 10. List any government approvals or permits that will be needed for your proposal, if known. [help] The ...
0.00218256819 |
a/86176
23rdandjacksonrezonesepachecklist
for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. [help] None ...
0.00218256819 |
a/86174
fascip
, conceptual planning, architectural and engineering design, bid, permitting and construction ...
0.00218256819 |
a/147691
fas_2429adoptedcip
, conceptual planning, architectural and engineering design, bid, permitting and construction ...
0.00218256819 |
a/153295
greenhomeguide-bath
efficient appliances. See www.pse.com for details.g13 green home remodel | bath & laundryIn 2005, Seattle and King County sent over ...
0.00218256819 |
a/88398
culture_and_recreation
18 demolition, North Shore Pier and Log Boom, Picnic Shelter Renovation and Shoreline Renovation, Magnuson Park Stairs, and ...
0.00218256819 |
a/61681
seattledesigncommission-2008.10.02epiphanyschoolalleyvacationminu ...
to Epiphany Church.  There is a steep hillside on Howell Street, creating a unique space for the site.  The development proposal includes th ...
0.00218256819 |
a/85454
spu
of combined sewers, 477 miles of storm drains, 68 pump stations, 90 permitted combined sewer overflow outfalls, 295 storm ...
0.00218256819 |
a/63067
2023ownertenantmeeting1presentation
: Identify Deliverables and Future Milestones•Mitigate •Demolitions•Displacement/relocation during construction•Increased ...
0.00218256819 |
a/140028
southlakeunioneisappendixcculturalresources
area has included logging, construction and demolition of residential and commercial structures, construction of ...
0.00218256819 |
a/87702
2023caoannualreport
in 2023. • Seattle Department of Construction & Inspections (SDCI) – permitting services, code compliance, design review, ...
0.00218256819 |
a/156492
spu
miles of combined sewers, 477 miles of storm drains, 68 pump stations, 90 permitted combined sewer overflow outfalls, 295 ...
0.00218256819 |
a/62991
canterbury_covenant
or expand any non-exempt use of floor area on the Property, or permit any non-exempt use of floor area on the Property to ...
0.00218256819 |
a/75196
seattle_transportation_plan-final_eis_02282024
of Natural Resources King County Department of Natural Resources, Parks Division King County Department of Permitting and ...
0.00218256819 |
a/153204
meany_lmn_report_r
. As any proposed alterations or demolition of the subject building described within this report will require a ...
0.00218256819 |
a/74588
2018stbdannualreport_final_lowres
the center city. Major projects during this “Period of Maximum Constraint” include:• 2018: Convention Center construction begins • 2019: ...
0.00218256819 |
a/117449
nfamaterials
does that have on generational wealth building?12Historically, Seattle permitted a mix of buildings in areas currently ...
0.00218256819 |
a/108046
436_wfv_4
in diameter (measured 4.5 feet above the ground) on undevelopedland within the City limits. An exception to this prohibition is tree removal ...
0.00218256819 |
a/100981
lpbcurrentnom_lincolnhighschoolnom
of Neighborhoods, requires a review of “potentially eligible landmarks” for commercial projects over 4,000 square feet in area. As any ...
0.00218256819 |
a/74494
2018stbdannualreport_finalv2(0)
the center city. Major projects during this “Period of Maximum Constraint” include:• 2018: Convention Center construction begins • 2019: ...
0.00218256819 |
a/106387
2018stbdannualreport_finalv2
the center city. Major projects during this “Period of Maximum Constraint” include:• 2018: Convention Center construction begins • 2019: ...
0.00218256819 |
a/117448
2018stbdannualreport_finalv2
the center city. Major projects during this “Period of Maximum Constraint” include:• 2018: Convention Center construction begins • 2019: ...
0.00218256819 |
a/106388
lpb092023leonapp
BE SUBMITTED FOR PERMIT, THE CONTRACTOR OR COMPONENT VENDOR MUST HIRE AN ENGINEER REGISTERED IN THE STATE OF WASHINGTON AND ...
0.00218256819 |
a/147302
lpb050323leonaparkridgedwgs
BE SUBMITTED FOR PERMIT, THE CONTRACTOR OR COMPONENT VENDOR MUST HIRE AN ENGINEER REGISTERED IN THE STATE OF WASHINGTON AND ...
0.00218256819 |
a/142009