Filter Results

1851 to 1875 of 1913
2017_1012_bgt_boards_web
30583 identifying a preferred route2007City Council adopts 2007 Bicycle Master Plan recommending ...
0.00168337114 |
a/100359
dravusareapublicrealmpossibilities
street. Include bicycle enhancements as proposed in bicycle master plan update.Consider intersection ...
0.00168337114 |
a/86985
dravusareapublicrealmpossibilities
street. Include bicycle enhancements as proposed in bicycle master plan update.Consider intersection ...
0.00168337114 |
a/86304
greenlakepavingboards_32018_v2
(collected 3/15/17)Posted Speed limitTraffic speed* (85% of vehicles are traveling at listed speed or below)Collisions(5 years)Transit ...
0.00168337114 |
a/102979
greenlakepavingboards_32018_v2
(collected 3/15/17)Posted Speed limitTraffic speed* (85% of vehicles are traveling at listed speed or below)Collisions(5 years)Transit ...
0.00168337114 |
a/102818
greenlakepavingboards_32018
(collected 3/15/17)Posted Speed limitTraffic speed* (85% of vehicles are traveling at listed speed or below)Collisions(5 years)Transit ...
0.00168337114 |
a/102978
greenlakepavingboards_32018
(collected 3/15/17)Posted Speed limitTraffic speed* (85% of vehicles are traveling at listed speed or below)Collisions(5 years)Transit ...
0.00168337114 |
a/102817
greenlakepavingboardsforwebmay24
volume*Bicycle volumes in street* (collected 3/15/17)Speed limitTraffic speed* (85% of vehicles are traveling at listed speed or ...
0.00168337114 |
a/102977
greenlakepavingboardsforwebmay24
volume*Bicycle volumes in street* (collected 3/15/17)Speed limitTraffic speed* (85% of vehicles are traveling at listed speed or ...
0.00168337114 |
a/102816
seattledesigncommission-2016.05.05seattleoperapresentation
car trips (drop off/pick up) will range from 400 to 3700/month, depending on programsSEATTLE CENTER THEATRE DISTRICTSEATTLE CENTER CENTURY ...
0.00168337114 |
a/85801
broad street3.1
. This project will complement the nearby Denny Way Intelligent Transportation System (ITS) improvements identified in the ...
0.00168289372 |
a/139391
2018-07-11finalsbabmeetingminutes
Valley projects are not connected without network connecting routes would be pointless. Offers to work with board to focus on Bike ...
0.00168289372 |
a/107061
adopted061114meetingsummary
. There was tremendous outpour from the public in support of the GSP. UFC comment: We didn’t get the funding for SDOT tree crews we ...
0.00168289372 |
a/118326
draft061114meetingsummary
. There was tremendous outpour from the public in support of the GSP. UFC comment: We didn’t get the funding for SDOT tree crews we ...
0.00168289372 |
a/118346
locagenda_april2
Report 6:00 PM Performance measures discussion 6:30 PM Bike Master Plan 2019 Implementation ...
0.00168289372 |
a/99605
loc_agenda_08022018
feedback for 8 sub-programs Levy Oversight Committee • Bridge Replacement – Planning & Design • Arterial Asphalt & ...
0.00168289372 |
a/99614
loc_agenda_0823_2018
Master Plan • Transit-Plus Multimodal Corridors • Arterial Asphalt & Concrete • Arterial Major Maintenance ...
0.00168289372 |
a/99615
october1_loc_agenda
– Approve agenda • Public comment (2 min. per person) • Distribute and approve previous meeting minutes (August 6, 2019) 5:45 PM SDOT 2020 ...
0.00168289372 |
a/99654
spab i-5 build grant letter of support
on and off I-5 as the basis for a long-range master plan for I-5. ​TIER 2, Community Connections and ...
0.00168289372 |
a/103769
2a. 17-235, 4th ave s between east marginal way and michigan
. There is an opportunity to partner with another program: ☒ Yes ☐ No Partnering Program: This segment scores highly under the criteria ...
0.00168289372 |
a/78059
levydistrict6
and rehabilitation (planning and design)Bridge replacement and improvementBridge seismic reinforcementSafe Routes to School ...
0.00168289372 |
a/99256
levydistrict1
Way)Street paving projectsCorridor safety projectsBicycle Master Plan implementationTransit Plus ...
0.00168289372 |
a/99251
btgannualreport2008
upgrades; tree pruning and planting; and other much-needed maintenance work. Funding will also develop and implement both the Bicycle and ...
0.00168289372 |
a/99105
btgannualreport2008
upgrades; tree pruning and planting; and other much-needed maintenance work. Funding will also develop and implement both the Bicycle and ...
0.00168289372 |
a/99411
locdec1_2020_presentation
OF CHANGESafe Routes5) Bicycle Safety $ 400,000 LOCAL, General FundFund Bike Master Plan for two projects ...
0.00168289372 |
a/99305