Skip to main content
This is an official government website.

Search Results

Search

Filters
Topics [14]
Departments [34]
Documents [2597]

Filters

Topics [14]
Departments [34]
Documents [2597]

Results

1726 to 1750 of 2644
  1. idminutes10-10-17 for Demolition, Use and Preliminary Design was issued in January 2017. She said it is the staff opinion that use of a ...
  2. bld-application-form-2018 : _________________________________________________________ Okay to receive approval documents by email? Yes ___________ No ___________ ...
  3. notes20180509 along 18th Avenue. The scope of the work is to have power and communications buried underground. The permit is under review ...
  4. desrptgriffin . A more thorough analysis of the structure will need to be undertaken to assess the extent of the damage to the concrete structural system. ...
  5. desrptgriffin building of the mortar. A more thorough analysis of the structure will need to be undertaken to assess the extent of the damage to the concrete ...
  6. desrpt_griffin . A more thorough analysis of the structure will need to be undertaken to assess the extent of the damage to the concrete structural system. ...
  7. ccdesignguidelines_ch to alternation, demolition, construction, reconstruction, restoration, remodeling, painting, or signing) to the exterior of ...
  8. ccdesignguidelines_ched to alternation, demolition, construction, reconstruction, restoration, remodeling, painting, or signing) to the exterior of ...
  9. desrptnavalreservearmory and manufacturing uses continued to increase, as evident in building permit records and historic photographs. Auto ...
  10. naval-reserve-armory-designation and manufacturing uses continued to increase, as evident in building permit records and historic photographs. Auto ...
  11. psb7-6-16_minutes on the other criteria in District Rules and the SMC23.66.160. The sign will still be required to comply with the on-premise sign ...
  12. ccdesignguidelines_v1 , and impart a feeling of association and sense of place. In accordance with Seattle Municipal Code 25.20.(SMC 25.20) no changes may be made ...
  13. ccdesignguidelines_9.25 a feeling of association and sense of place. In accordance with Seattle Municipal Code 25.20.(SMC 25.20) no changes may be made (including ...
  14. lpbminutes_10-19-22 , is required prior to the issuance of any city building, demolition, street use, or other permits for ...
  15. desrpt_cassel_crag(0) for ease of access, and floors carpeted, but many original finishes remain intact. Summary of primary alterations The subject building is ...
  16. desrpt_cassel_crag of access, and floors carpeted, but many original finishes remain intact. Summary of primary alterations The subject building is largely ...
  17. lpbminutes11-20-19 to 1020 South Main Street, also in the Nihonmachi area. This building was destroyed as part of the demolition making way ...
  18. lpbminutes_6-5-24 report includes that requirement. Ms. Wasserman said she was very bothered by the removal and that it is against policy. She said it was ...
  19. 2014-council-work-program on enforcement complaint response time.ChairPermit Review Times and the Permit Review ProcessReview DPD quarterly reports o ...
  20. pspbminutes_3-1-23 Standards. Because of the condition of the existing building, demolition and sidewalk replacement is happening now. There ...
  21. cam5022_recreationalfires_tagalog cam5022_recreationalfires_tagalog Seattle Fire DepartmentCAMClient Assistance Memo 5022 Seattle Permits—bahagi ng isang ...
  22. cmpcucacreportaug2017 in the University District Northwest Urban Center Village (UDNUCV), including the number and types of units built, the number, types and ...
  23. southparkrfptechanalysis2022 with the permitting and scheduling of large infrastructure projects; and the standards, design processes, methodologies and ...
  24. dpr_projects resulting from this project are paid by the General Subfund, per Ordinance 121488.4th Quarter 20063rd Quarter 2008BCL/Program Name:West ...
  25. dpr_projects , per Ordinance 121488.4th Quarter 20063rd Quarter 2008BCL/Program Name:West Point Settlement ProjectsDiscovery Park - Building 653 ...