Filter Results

151 to 175 of 2624
su-mimp-2013revised
expressed interest in the Lynn Building along E Madison Street. When the university moves forward with a Master use Permit ...
0.00217281468 |
a/77311
su_mimp_2013
interest in the Lynn Building along E Madison Street. When the university moves forward with a Master use Permit (MUP) ...
0.00217281468 |
a/77317
2025.08.29 - revised mimp ma
. The excavation contractor shall provide a truck management plan to the SeaTran Permit office for approval and identify ...
0.00217233133 |
a/173692
2022_adopted_budget_book
accounts for all of its revenues and expenditures according to a system of funds. In general, funds are established to account for specific ...
0.0021722822 |
a/127141
2018srcchapter1
of the requirements of this code for newconstruction.R107.12 Rat abatement for demolished buildings. All applicants for a ...
0.00217125332 |
a/97861
seattle industrial deis ch 3 2021_12-web
proponents to nominate buildings for landmark review when demolition of properties that are over 50 years old is proposed, ...
0.0021704128 |
a/87144
2003smc
, but is not limited to, requesting of a required inspection, the arranging of financing, selection of contractors and subcontractors, ...
0.00217024074 |
a/97219
2025.08.25- hmc bond preliminary draft eis with appendices
, Harborview Construction and Infrastructure 401 5th Avenue, Suite 920 Seattle, Washington 98104 Required Permits and ...
0.0021691923 |
a/173693
directors report
to tenants with household incomes below established thresholds before issuing permits for housing ...
0.0021688696 |
a/87404
directors report
to tenants with household incomes below established thresholds before issuing permits for housing ...
0.0021688696 |
a/87555
mayors plan - policy comparison crosswalk
tenants and payment of relocation assistance to tenants with household incomes below established thresholds before issuing ...
0.00216826028 |
a/87604
mayors plan - policy comparison crosswalk
tenants and payment of relocation assistance to tenants with household incomes below established thresholds before issuing ...
0.00216826028 |
a/87427
2022_proposed_budget
and expenditures according to a system of funds. In general, funds are established to account for specific revenues and ...
0.002168211 |
a/63575
2018adoptedbudget
revenues and permitted expenditures associated with those revenues. For example, the City’s share of Motor Vehicle Fuel ...
0.00216820068 |
a/62922
2012sbcchapter1
tobe salvaged prior to building removal. Forpartial demolition projects, the buildingowner is permitted to ...
0.00216798112 |
a/97340
ordinance - sepa draft - mha dtslu implementation
Preservation Board has issued a Certificate of 14 Approval for the modification or demolition of the Landmark; and 15 5) ...
0.00216750079 |
a/65080
2016adoptedbudget
rental market research experts; U.S. Census Bureau; City programs, such as the Multifamily Tax Exemption Program, the Tenant Relocation ...
0.00216722372 |
a/62551
udistrictfinaleis121814_web
and Development ▶Land Use ▶Master Use Permit ▶Seattle Design Commission Review ▶Construction ▶Demolition ...
0.0021671264 |
a/87836
adoptedufcmeetingnotes061020
to be in the updated tree ordinance: 1. Expand the existing Tree Removal and Replacement Permit Program, including 2-week ...
0.00216703233 |
a/119038
2007cdlwastecompostitionstudy
4.3.1 Spring 47 4.3.2 Summer 47 4.3.3 Fall 48 4.3.4 Winter 48 4.3.5 Comparisons among Seasons 49 5 COMPOSITION RESULTS FOR PROCESSING ...
0.00216665072 |
a/112545
119_phase1_environmental_report3
County Assessor Records   Building Permit Files   Historical Maps B EDR Radius Report  C Qualifications of the Environmenta ...
0.002166518 |
a/59084
2018sbcchapter1
to theprovisions of this code or contrary to a permit issued by the building official, or in the event of dangerous or ...
0.002166249 |
a/97421
uptownfeis-sm
of the proposal is to increase permitted height and density in the Uptown neighborhood to advance the Comprehensive Plan ...
0.0021662 |
a/87889
prelimdrafteis-2013-11-07
) states the following with respect to additions to existing MIO districts: New or expanded boundaries shall not be ...
0.00216555269 |
a/77558
oneseattleplanchapter23.44-amended
dwelling units A. Attached and detached accessory dwelling units are permitted in all zones where single-family dwelling ...
0.00216533314 |
a/170319